№ lp_2_3_53381
File format: docx
Character count: 40741
File size: 96 KB
The document outlines the regulations for pipeline operations in Australia, covering licensing, safety management, environmental standards, and enforcement procedures.
Year:
2017
Region / City:
Australia
Topic:
Pipelines
Document Type:
Regulations
Authoring Organization:
Government of Australia
Target Audience:
Industry professionals, government bodies, pipeline operators
Period of Validity:
Ongoing from 26 March 2017
Approval Date:
26 March 2017
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
United States
Topic:
Natural Gas Pipelines, Energy Regulation
Document Type:
Notice of Proposed Rulemaking
Agency:
Federal Energy Regulatory Commission
Author:
Federal Energy Regulatory Commission
Target Audience:
Industry professionals, regulatory bodies, and energy sector stakeholders
Period of Validity:
Not specified
Approval Date:
October 16, 2025
Amendment Date:
Not specified
Year:
No specific year mentioned
Region / city:
No specific region or city mentioned
Subject:
Oil discharge prevention, marine oil terminals, pipelines, vessel operations, and safety
Document Type:
Regulatory document
Organization / institution:
No specific institution mentioned
Author:
No specific author mentioned
Target Audience:
Operators of marine oil terminals, pipeline operators, vessel operators
Period of validity:
No specific period mentioned
Approval Date:
No specific date mentioned
Date of amendments:
No specific date mentioned
Year:
2016
Jurisdiction:
India
Place of issue:
New Delhi
Issuing authority:
Petroleum and Natural Gas Regulatory Board
Legal basis:
Petroleum and Natural Gas Regulatory Board Act, 2006
Document type:
Regulatory notification
Subject matter:
Technical standards, specifications and safety standards for petroleum and petroleum products pipelines
Scope of application:
Onshore petroleum and petroleum products pipelines, including existing and new pipelines
Applicable standard:
ASME B31.4
Covered activities:
Design, materials and equipment, fabrication, installation, testing, corrosion control, operation, maintenance and safety
Compliance mechanism:
Monitoring by the Board or accredited third party and mandatory quantitative risk analysis for non-conformities
Schedules and annexures:
Schedule I (1A–1H) and Annexure I to Annexure IV
Year:
2013
Region / City:
United Kingdom
Topic:
Risk assessment, gas pipelines, safety
Document type:
Standard
Organization / Institution:
Institution of Gas Engineers and Managers (IGEM)
Author:
IGEM Gas Transmission and Distribution Committee
Target audience:
Pipeline operators, planners, engineers
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
2025
Region / City:
United Kingdom
Topic:
Gas transmission and infrastructure
Document Type:
Legal Document
Institution:
Independent Gas Transporter
Author:
Not specified
Target Audience:
Gas transporters, shippers, system operators
Period of Validity:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2018
Agency:
Federal Energy Regulatory Commission
Docket Number:
RM18-11-000
Action:
Notice of Proposed Rulemaking
Keywords:
Natural Gas Pipelines, Federal Income Tax Rate, Rate Changes, Tax Cuts and Jobs Act, United Airlines Decision, Natural Gas Act
Target Audience:
Energy Industry, Regulatory Bodies, Natural Gas Pipelines
Period of Effect:
January 1, 2018
Approval Date:
March 15, 2018
Document Type:
Regulatory Notice
Context:
Regulatory notice issued by the Federal Energy Regulatory Commission addressing changes in rate-setting for interstate natural gas pipelines in response to the Tax Cuts and Jobs Act of 2017 and subsequent policy updates.
Year:
2015
Region / City:
United States
Subject:
Energy regulation, Natural gas pipelines
Document type:
Final rule
Agency / Institution:
Federal Energy Regulatory Commission
Author:
Federal Energy Regulatory Commission
Target audience:
Energy industry professionals, regulatory bodies
Period of validity:
Not specified
Approval date:
April 16, 2015
Amendment date:
Not specified
Year:
2024
Region / City:
New Jersey
Topic:
Data Engineering, Cloud Technologies, ETL Pipelines
Document Type:
Resume / CV
Organization / Institution:
N/A
Author:
Sai Chava
Target Audience:
Employers, Recruiters, Data Engineering Teams
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
NJ
Subject:
Data Engineering, Cloud Platforms, Real-time Data Pipelines
Document Type:
Resume
Organization / Institution:
Citi Bank
Author:
Deepthi P
Target Audience:
Hiring Managers, Data Engineering Teams, Technical Recruiters
Effective Period:
Current
Approval Date:
Aug 2023
Modification Date:
N/A
Year:
2020
Date:
17 July 2020
Place:
New Delhi
Document Type:
Regulatory Notification
Issuing Authority:
Petroleum and Natural Gas Regulatory Board
Legal Basis:
Section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006)
Subject:
Amendment to Technical Standards and Safety Standards for Natural Gas Pipelines
Amended Regulation:
Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines) Regulations, 2009
Related Regulations:
PNGRB (Technical Standards and Specifications including Safety Standards for City or Local Gas Distribution Network) Regulations, 2008; PNGRB (Codes of Practices for Emergency Response and Disaster Management Plan (ERDMP)) Regulations, 2010
Scope:
Natural Gas Transmission and Distribution Pipelines
Key Provisions:
Appointment of responsible director for compliance; revised material specifications for steel pipes; provisions for PE pipelines in Class 1 and 2 locations; valve spacing requirements; installation of fire and gas or multi-sensor detectors; emergency response and disaster management plan requirements; updated fire fighting equipment specifications
Commencement:
On the date of publication in the Official Gazette
Official reference:
F. No. PNGRB/Tech/2-T4SNGPL/(1)/2019
Year:
2015
Date:
April 9, 2015
Region / State:
California, United States
City referenced:
San Bruno, California
Subject:
Natural gas pipeline safety and regulatory compliance
Document type:
Regulatory commission decision
Authority / Institution:
California Public Utilities Commission
Company concerned:
Pacific Gas and Electric Company (PG&E)
Related incidents:
San Bruno gas transmission pipeline explosion of September 9, 2010
Investigations:
Investigation 12-01-007; Investigation 11-02-016; Investigation 11-11-009
Legal basis:
California Public Utilities Code § 451; General Order 112; Title 49 Code of Federal Regulations Part 192
Penalties imposed:
$1.6 billion in fines, credits, and safety investments
Fine to General Fund:
$300 million
Infrastructure safety investments:
$850 million funded by PG&E shareholders
Ratepayer bill credit:
$400 million one-time credit
Additional safety remedies funding:
Approximately $50 million
Number of violations identified:
2,425
Affected infrastructure:
Natural gas transmission pipeline system
Casualties referenced:
8 deaths and 58 injuries
Property damage referenced:
38 homes destroyed and 70 homes damaged
Year:
2026
Region / City:
Not specified
Subject:
Sewer Infrastructure Inspection
Document Type:
Technical Specification
Organization / Institution:
HRSD (Hampton Roads Sanitation District)
Author:
Not specified
Target Audience:
Contractors performing pipeline and manhole inspections
Applicable Period:
Ongoing project duration
Approval Date:
Not specified
Revision Date:
Not specified
Standards Referenced:
NASSCO PACP, MACP, LACP
Year:
2023
Region / City:
Bentonville, AR, Dallas, TX
Theme:
Data Engineering, Cloud Computing, Data Processing, Cloud Architecture
Document Type:
Resume
Organization:
Walmart, Southern California Edison
Author:
Anusha Reddy
Target Audience:
Hiring Managers, Data Engineering Teams
Period of Activity:
Apr 2025-Present, Mar 2024-Feb 2025
Approval Date:
Not specified
Modification Date:
Not specified
Author:
Hamed Habibi, MSc, MME
Position:
Technical Director
Organisation:
Speir Hunter
Address:
Mayden House, Main Street, Long Bennington, Newark NG23 5DJ, UK
Document Type:
Technical paper
Subject:
Pipeline integrity monitoring and stress detection in carbon steel pipelines
Technology Described:
Remote Magnetic Monitoring (RMM), Large Standoff Magnetometry (LSM), Stress Concentration Tomography (SCT)
Scientific Concepts:
Inverse-Magnetostriction, Villari Effect, magnetic field response to mechanical stress
Industry:
Oil and gas pipeline infrastructure
Material Studied:
Carbon steel pipelines
Keywords:
RMM, LSM, SCT, SCZ, Localised Stress, Stress Monitoring, Condition Assessment, Pipeline Integrity
Focus:
Detection and measurement of localised stress in pipeline walls using magnetic field analysis
Year:
2020-2027
Region / City:
Southern Company Gas
Subject:
DIMP Capital Budget and Pipe Replacements
Document Type:
Proposed Budget Report
Organization / Institution:
Southern Company Gas
Author:
Steven Murphy, Vice President, Engineering & Construction, Southern Company Gas; Donald Carter, Vice President, Compliance & Technical Services, Southern Company Gas
Target Audience:
Stakeholders involved in DIMP program and budget approval
Effective Period:
2020-2027
Approval Date:
2020
Date of Changes:
None provided
Note:
Year
Region / City:
Moore County
Topic:
Land Use Planning, Agriculture, Rural Development
Document Type:
Draft Plan
Agency / Organization:
Moore County Planning Department
Target Audience:
Local residents, policymakers, urban planners
Year:
2017
Region / City:
Whatcom County, WA
Topic:
Legal Dispute, Easement Agreement
Document Type:
Correspondence
Organization / Institution:
Georgia Manor Water Association (GMWA), Carmichael Clark Law Firm
Author:
Simi Jain, Seth Woolson
Target Audience:
Legal professionals, parties involved in the settlement agreement
Period of Effect:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Region / City:
Knoxville, TN
Subject:
Proposed Amendment
Document Type:
HOA Amendment Proposal
Organization:
The Cove at Blackberry Ridge HOA
Author:
Matt Wiberg – President, HOA Board
Target Audience:
Homeowners of The Cove at Blackberry Ridge
Period of Action:
June 12, 2025 (Voting Date)
Approval Date:
May 12, 2025
Change Date:
N/A
Year:
2013
Region / City:
Jamaica
Subject:
Social Protection
Document Type:
Project Restructuring Report
Organization / Institution:
The World Bank
Author:
Human Development Sector Management Unit, Caribbean Country Management Unit
Target Audience:
Government of Jamaica, World Bank Stakeholders
Period of Effectiveness:
2008-2015
Approval Date:
May 13, 2008
Date of Amendments:
June 6, 2013
Year:
2024
Region / City:
Washington, D.C.
Topic:
Copyright Law, Digital Performance, Sound Recordings, Web V, Web VI
Document Type:
Order
Organ / Institution:
United States Copyright Royalty Judges, Library of Congress
Author:
David P. Shaw
Target Audience:
Legal professionals, counsel, and experts involved in copyright royalty proceedings
Effective Period:
2026-2030
Approval Date:
April 18, 2024
Date of Changes:
N/A