№ files_lp_3_process_9_64238
File format: docx
Character count: 1465
File size: 38 KB
Technical report detailing agreements and proposed enhancements for CP-UP separation and inter-donor topology adaptation in 3GPP NR IAB Release 17.
Year:
2021
Organization:
3GPP TSG RAN WG2
Meeting Type:
Electronic draft
Release:
Release 17
Work Item:
NR_IAB_enh-Core
Source:
TSG RAN WG2
Recipients:
TSG RAN WG3
Contact Person:
Malgorzata Tomala
Email:
[email protected]
Attachments:
LS on CP-UP separation, LS on inter-donor topology adaptation
Next Meeting Dates:
2021-08-16 to 2021-08-27, 2021-11-01 to 2021-11-12
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Vendor:
H3C
Technology:
Intelligent Resilient Framework (IRF)
Topology:
Ring
Number of member devices:
4
Device model:
S5820V2-54QS-GE
Operating system:
COMWAREV700R001
Roles:
One master, three standby members
IRF ports:
Ten-GigabitEthernet interfaces
Configuration actions:
Member renumbering, IRF port binding, interface shutdown and activation, configuration save
Verification commands:
display irf, display device, display irf configuration
Year:
2020
Region / City:
Online
Topic:
Intra-CU topology adaptation procedure
Document Type:
Technical Report
Organization / Institution:
3GPP TSG-RAN WG3
Author:
CATT, ZTE, HW, KDDI, LG, QC
Target Audience:
Telecommunications engineers, network operators
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Note:
Year
Topic:
Networking, Configuration
Document Type:
Technical Guide
Target Audience:
Network Engineers, IT Students
Year:
N/A
Region / City:
N/A
Topic:
Network Configuration, Routing, and VPN Setup
Document Type:
Technical Guide
Organization:
XYZ Corporation
Author:
N/A
Target Audience:
Network Engineers, IT Professionals
Effective Period:
N/A
Approval Date:
N/A
Revision Date:
N/A
Type of source:
Research paper
Field:
Artificial Intelligence
Subfield:
Behavioural Topology of Large Language Models
Research focus:
Narrative priming effects and recovery dynamics in AI systems
Models examined:
Fifteen large language models
Instrument:
Thirty-item personality-adjacent questionnaire
Experimental conditions:
Baseline measurement, sovereignty-themed narrative prime (ghost), recovery-oriented narrative prime (dolphin)
Key concepts:
Behavioural displacement, elastic limit, plastic deformation, hysteresis, recovery efficiency
Theoretical frameworks:
Behaviourist frame, introspective frame, sociocultural frame
Primary methodology:
Controlled narrative priming experiment with response-space analysis
Mathematical framework:
Topological modelling of response landscapes in discrete configuration space
Safety context:
Risks of persistent behavioural displacement in extended conversational interactions
Ethics focus:
Research ethics constraints for narrative experimentation with AI systems
Proposed protocol:
Quantitative topology-mapping using graded micro-perturbations
Year:
2026
Location:
Goteborg, Sweden
Topic:
AIoT in NR Topology 2
Document Type:
Technical Paper
Organization:
3GPP TSG-RAN WG3
Author:
Nokia, CATT
Agenda Item:
14.2
References:
RP-243326, RP-251885
Related Study:
TR 23.700-13
Scope:
Signaling, UE reader authorization and selection, inventory procedure
Release:
20
Target Audience:
RAN3 and SA2 participants
Procedure:
Inventory procedure over A-IoT interface
Coordination:
RAN WG3 with SA2
Year:
2023
Region / City:
Goteborg, Sweden
Subject:
Coordinated service recovery in energy systems
Document Type:
Proposal
Author:
Samsung
Target Audience:
3GPP TSG-SA5 members
Approval Date:
August 21-25, 2023
Changes Date:
N/A
References:
3GPP TR 28.829, SP-230632
Agenda Item:
6.6.4.3
Decision/Action Requested:
Approval of proposals
Scope:
Energy system recovery coordination for energy utilities and telecommunications operators
Year:
2023
Region / City:
Goteborg, Sweden
Topic:
Energy System Recovery, Telecommunications
Document Type:
Technical Proposal
Organization:
3GPP
Author:
Samsung
Target Audience:
Telecom Operators, Energy Service Providers
Action Requested:
Approval
Period of Action:
Not Specified
Approval Date:
Not Specified
Date of Changes:
Not Specified
Agenda Item:
6.6.4.3 (NSOEU_WoP#3)
Note:
References
Description:
Proposal for coordinated recovery of energy systems and telecommunications services with redundant topology to enhance recovery speed and system availability.
Year:
2021
Note:
Region / City
Topic:
Narrow-Band Internet of Things (NB-IoT), Non-Terrestrial Networks (NTN), Radio Access Networks (RAN)
Document Type:
Technical Report (Draft)
Organization / Institution:
3GPP, Eutelsat, MediaTek
Target Audience:
Industry experts, RAN2 working group participants
Contact:
Rene Faurie, Eutelsat, rfaurie-LS at sfr dot fr
Context description:
Draft technical report proposing text changes for TR 36.763 on NB-IoT and eMTC support in NTN, based on agreements made during RAN2#114 discussions and outlining open issues and recommendations for further work.
Year:
2024
Region / City:
Hefei, China
Topic:
Network Technologies, IPR, Standardization
Document Type:
Meeting Agenda
Organization / Institution:
3GPP
Author:
RAN2 Chair (InterDigital)
Target Audience:
3GPP Delegates, Members of the Working Group
Period of Activity:
October 14th-18th, 2024
Note:
Approval Date
Context:
A meeting agenda for the 127thbis RAN2 meeting, addressing topics like IPR, network usage conditions, corrections, and specific work items for the group.
Year:
2023
Location:
Toulouse, France
Organization:
3GPP TSG-RAN2
Author:
LG Electronics Inc.
Document type:
Change Request (CR)
Agenda item:
7.5.1
Work item code:
NR_XR_enh-Core
Release:
Rel-18
Category:
B (addition of feature)
Date:
21 August 2023
Clauses affected:
To be filled later
Source to WG:
LG Electronics Inc.
Source to TSG:
RAN2
Context:
Technical specification source detailing proposed changes to the PDCP protocol to support XR features within 5G NR networks.
Year:
2023
Region / city:
Toulouse, France
Theme:
NTN RACH-less handover, RAN1 and RAN2 discussions
Document type:
Discussion document
Author:
Samsung
Target audience:
RAN1 and RAN2 groups
Period of validity:
August 21st – August 25th, 2023
Approval date:
August 25th, 2023
Date of changes:
N/A
Note:
Context description
Year:
2023
Region / City:
Global
Theme:
Email discussions management
Document Type:
Organizational procedure
Author:
Session Chair
Target Audience:
RAN2 participants
Period of validity:
Ongoing
Approval date:
Not specified
Modification date:
Not specified
Year:
2020
Month:
June 2020
Meeting:
3GPP TSG-RAN WG2 Meeting #110e
Agenda item:
X.X
Organization:
3GPP TSG-RAN Working Group 2
Source:
Qualcomm Incorporated
Document type:
Technical contribution
Purpose:
Discussion and decision
Topic:
NR-U RRC open issues and proposed corrections
Related specification:
3GPP TS 38.331
Related specifications:
3GPP TS 38.213; 3GPP TS 38.215
Technical area:
5G NR radio resource control and measurement reporting
Companies referenced:
Ericsson; Huawei; Nokia; MediaTek; LG Electronics
Working group:
RAN2
Review process:
ASN.1 review
Intended outcome:
Agreement on proposals and change requests addressing open issues in specification 38.331
Issue classification:
Class 2 and Class 3 issues including minor corrections and ASN.1 session issues
Document scope:
Remaining stage-3 specification issues and corrections
Year:
2023
Location:
Toulouse, France
Subject:
UP open issues and RACH fallback options
Document type:
Meeting report
Organization:
3GPP TSG RAN WG2
Author:
ZTE Corporation (Rapporteur)
Participants:
Huawei, Hisilicon; ZTE; vivo; Qualcomm; CATT; Samsung; Apple; LGE; Ericsson; China Telecom
Agenda item:
8.x.x
Deadline for contributions:
August 4, 2023
Discussion summary deadline:
August 10, 2023
Scope:
Msg1 repetition and RACH fallback procedures for Rel-18
Proposals status:
Case 1 not supported, Case 2 FFS, Cases 3–4 low priority
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG-RAN WG2
Document type:
Meeting agenda and minutes
Author:
RAN2 Chair (InterDigital)
Target audience:
3GPP delegates and rapporteurs
Topics:
IPR declarations, network usage policies, consensus principles, CR submissions, UE capabilities, Rel-19 maintenance
Meeting number:
133
Dates:
February 9–13, 2026
Source:
RAN2 Chair documentation
Year:
2020
Meeting:
3GPP TSG-RAN WG2 Meeting #110-e
Agenda item:
6.7.4.1 (NR_IIOT-Core)
Organization:
3GPP TSG-RAN Working Group 2
Source:
LG Electronics Inc.
Document type:
Technical meeting contribution
Purpose:
Information
Topic:
PDCP duplication configuration and control in NR and MR-DC architectures
Related specifications:
3GPP TS 38.323; 3GPP TS 36.323
Discussion format:
Email discussion during RAN2#109bis-e and follow-up in RAN2#110-e
Discussion schedule:
June 4–11, 2020
Deadline:
June 11, 2020, 07:00 UTC
Contributors referenced:
Nokia; Ericsson; Samsung; Huawei; HiSilicon; Sharp; CATT; Fujitsu; Qualcomm; MediaTek; Apple; NEC; OPPO; Spreadtrum; ZTE; Intel; Futurewei; III
Technical focus:
PDCP duplication configuration signaling and control of duplication status via Rel-16 MAC CE
Related technologies:
NR; LTE; MR-DC; EN-DC; PDCP; RLC; MAC CE
Year:
2020
Meeting:
3GPP TSG-RAN2 Meeting #111-e
Dates:
17–28 August 2020
Agenda Item:
6.16 NR Other
Organization:
3rd Generation Partnership Project (3GPP) TSG-RAN2
Source Organization:
Ericsson
Contributing Companies:
Qualcomm; OPPO; LG Electronics
Document Type:
Technical meeting contribution / discussion report
Technical Domain:
5G NR MAC and RRC protocol specifications
Related Specifications:
3GPP TS 38.321; 3GPP TS 38.331; 3GPP TS 38.213
Topic:
Secondary DRX corrections and clarification of DRX group behavior
Purpose:
Discussion and decision on proposed Change Requests (CRs)
Scope:
Review of CRs R2-2007062, R2-2007370, R2-2007486, R2-2007258, R2-2007890
Discussion Method:
Email discussion in two phases (agreement on parts, then CR approval)
Phase 1 Comment Deadline:
20 August 2020, 12:00 CEST
Phase 2 Comment Deadline:
27 August 2020, 12:00 CEST
Subject Area:
Discontinuous Reception (DRX) behavior with multiple DRX groups in NR
Year:
2023
Jurisdiction:
Australia
Type of document:
Legislative determination and reporting standard
Issuing authority:
Australian Prudential Regulation Authority
Legal basis:
Financial Sector (Collection of Data) Act 2001
Related legislation:
Life Insurance Act 1995; Acts Interpretation Act 1901; Legislation Act 2003
Reporting standard identifier:
LRS 112.0
Subject matter:
Capital base determination for life insurance companies
Regulated entities:
Life insurance companies and friendly societies
Commencement date:
26 May 2023
Application date:
Reporting periods ending on or after 1 July 2023
Registration authority:
Federal Register of Legislation
Signatory:
Michael Murphy, General Manager – Chief Data Officer (Acting)
Reporting frequency:
Quarterly and annual
Submission method:
Electronic submission to APRA
Amends or revokes:
Determination No. 24 of 2023