№ files_lp_3_process_7_051435
File format: docx
Character count: 5292
File size: 404 KB
The document provides a detailed description of how email discussions should be managed during the RAN2 e-meeting, outlining procedures for organizing, labeling, and tracking discussions, as well as roles and responsibilities of session chairs and rapporteurs.
Year:
2023
Region / City:
Global
Theme:
Email discussions management
Document Type:
Organizational procedure
Author:
Session Chair
Target Audience:
RAN2 participants
Period of validity:
Ongoing
Approval date:
Not specified
Modification date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2021
Note:
Region / City
Topic:
Narrow-Band Internet of Things (NB-IoT), Non-Terrestrial Networks (NTN), Radio Access Networks (RAN)
Document Type:
Technical Report (Draft)
Organization / Institution:
3GPP, Eutelsat, MediaTek
Target Audience:
Industry experts, RAN2 working group participants
Contact:
Rene Faurie, Eutelsat, rfaurie-LS at sfr dot fr
Context description:
Draft technical report proposing text changes for TR 36.763 on NB-IoT and eMTC support in NTN, based on agreements made during RAN2#114 discussions and outlining open issues and recommendations for further work.
Year:
2024
Region / City:
Hefei, China
Topic:
Network Technologies, IPR, Standardization
Document Type:
Meeting Agenda
Organization / Institution:
3GPP
Author:
RAN2 Chair (InterDigital)
Target Audience:
3GPP Delegates, Members of the Working Group
Period of Activity:
October 14th-18th, 2024
Note:
Approval Date
Context:
A meeting agenda for the 127thbis RAN2 meeting, addressing topics like IPR, network usage conditions, corrections, and specific work items for the group.
Year:
2023
Location:
Toulouse, France
Organization:
3GPP TSG-RAN2
Author:
LG Electronics Inc.
Document type:
Change Request (CR)
Agenda item:
7.5.1
Work item code:
NR_XR_enh-Core
Release:
Rel-18
Category:
B (addition of feature)
Date:
21 August 2023
Clauses affected:
To be filled later
Source to WG:
LG Electronics Inc.
Source to TSG:
RAN2
Context:
Technical specification source detailing proposed changes to the PDCP protocol to support XR features within 5G NR networks.
Year:
2023
Region / city:
Toulouse, France
Theme:
NTN RACH-less handover, RAN1 and RAN2 discussions
Document type:
Discussion document
Author:
Samsung
Target audience:
RAN1 and RAN2 groups
Period of validity:
August 21st – August 25th, 2023
Approval date:
August 25th, 2023
Date of changes:
N/A
Note:
Context description
Year:
2021
Organization:
3GPP TSG RAN WG2
Meeting Type:
Electronic draft
Release:
Release 17
Work Item:
NR_IAB_enh-Core
Source:
TSG RAN WG2
Recipients:
TSG RAN WG3
Contact Person:
Malgorzata Tomala
Email:
[email protected]
Attachments:
LS on CP-UP separation, LS on inter-donor topology adaptation
Next Meeting Dates:
2021-08-16 to 2021-08-27, 2021-11-01 to 2021-11-12
Year:
2020
Month:
June 2020
Meeting:
3GPP TSG-RAN WG2 Meeting #110e
Agenda item:
X.X
Organization:
3GPP TSG-RAN Working Group 2
Source:
Qualcomm Incorporated
Document type:
Technical contribution
Purpose:
Discussion and decision
Topic:
NR-U RRC open issues and proposed corrections
Related specification:
3GPP TS 38.331
Related specifications:
3GPP TS 38.213; 3GPP TS 38.215
Technical area:
5G NR radio resource control and measurement reporting
Companies referenced:
Ericsson; Huawei; Nokia; MediaTek; LG Electronics
Working group:
RAN2
Review process:
ASN.1 review
Intended outcome:
Agreement on proposals and change requests addressing open issues in specification 38.331
Issue classification:
Class 2 and Class 3 issues including minor corrections and ASN.1 session issues
Document scope:
Remaining stage-3 specification issues and corrections
Year:
2023
Location:
Toulouse, France
Subject:
UP open issues and RACH fallback options
Document type:
Meeting report
Organization:
3GPP TSG RAN WG2
Author:
ZTE Corporation (Rapporteur)
Participants:
Huawei, Hisilicon; ZTE; vivo; Qualcomm; CATT; Samsung; Apple; LGE; Ericsson; China Telecom
Agenda item:
8.x.x
Deadline for contributions:
August 4, 2023
Discussion summary deadline:
August 10, 2023
Scope:
Msg1 repetition and RACH fallback procedures for Rel-18
Proposals status:
Case 1 not supported, Case 2 FFS, Cases 3–4 low priority
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG-RAN WG2
Document type:
Meeting agenda and minutes
Author:
RAN2 Chair (InterDigital)
Target audience:
3GPP delegates and rapporteurs
Topics:
IPR declarations, network usage policies, consensus principles, CR submissions, UE capabilities, Rel-19 maintenance
Meeting number:
133
Dates:
February 9–13, 2026
Source:
RAN2 Chair documentation
Year:
2020
Meeting:
3GPP TSG-RAN WG2 Meeting #110-e
Agenda item:
6.7.4.1 (NR_IIOT-Core)
Organization:
3GPP TSG-RAN Working Group 2
Source:
LG Electronics Inc.
Document type:
Technical meeting contribution
Purpose:
Information
Topic:
PDCP duplication configuration and control in NR and MR-DC architectures
Related specifications:
3GPP TS 38.323; 3GPP TS 36.323
Discussion format:
Email discussion during RAN2#109bis-e and follow-up in RAN2#110-e
Discussion schedule:
June 4–11, 2020
Deadline:
June 11, 2020, 07:00 UTC
Contributors referenced:
Nokia; Ericsson; Samsung; Huawei; HiSilicon; Sharp; CATT; Fujitsu; Qualcomm; MediaTek; Apple; NEC; OPPO; Spreadtrum; ZTE; Intel; Futurewei; III
Technical focus:
PDCP duplication configuration signaling and control of duplication status via Rel-16 MAC CE
Related technologies:
NR; LTE; MR-DC; EN-DC; PDCP; RLC; MAC CE
Year:
2020
Meeting:
3GPP TSG-RAN2 Meeting #111-e
Dates:
17–28 August 2020
Agenda Item:
6.16 NR Other
Organization:
3rd Generation Partnership Project (3GPP) TSG-RAN2
Source Organization:
Ericsson
Contributing Companies:
Qualcomm; OPPO; LG Electronics
Document Type:
Technical meeting contribution / discussion report
Technical Domain:
5G NR MAC and RRC protocol specifications
Related Specifications:
3GPP TS 38.321; 3GPP TS 38.331; 3GPP TS 38.213
Topic:
Secondary DRX corrections and clarification of DRX group behavior
Purpose:
Discussion and decision on proposed Change Requests (CRs)
Scope:
Review of CRs R2-2007062, R2-2007370, R2-2007486, R2-2007258, R2-2007890
Discussion Method:
Email discussion in two phases (agreement on parts, then CR approval)
Phase 1 Comment Deadline:
20 August 2020, 12:00 CEST
Phase 2 Comment Deadline:
27 August 2020, 12:00 CEST
Subject Area:
Discontinuous Reception (DRX) behavior with multiple DRX groups in NR
Year:
2021
Organization:
International Telecommunication Union
Sector:
Telecommunication Standardization
Study period:
2017-2020
Working Group:
WG2
Document type:
Input document / Report
Title:
Report of FG-AI4EE Working Group 2, 25 January 2021
Purpose:
Information
Contact:
Leonidas Anthopoulos, WG2 Co-chairman FG-AI4EE
Keywords:
Report; FG-AI4EE; Working Group 2
Meeting date:
25 January 2021
Next meeting date:
25 February 2021
Participants:
9
Location:
Online / e-meeting
Year:
2022
Region / City:
N/A
Topic:
Environmental Efficiency, AI, Emerging Technologies
Document Type:
Report
Organization:
International Telecommunication Union (ITU)
Author:
FG-AI4EE Working Group 1
Target Audience:
Experts, Researchers, Policymakers
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2020
Region / city:
Geneva
Topic:
Radiocommunication
Document Type:
Report
Body / Institution:
ITU - Working Party 5A
Author:
Chairman, Working Party 5A
Target Audience:
Telecommunications professionals, stakeholders in radiocommunication
Period of Effectiveness:
November 2020
Approval Date:
15 December 2020
Date of Changes:
N/A
Year:
2020
Region / City:
International
Theme:
Environmental Efficiency, AI, Emerging Technologies
Document Type:
Meeting Report
Organization:
International Telecommunication Union (ITU)
Author:
Joel Alexander Mills, Co-Chairman
Target Audience:
Experts, ITU Members
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Region / city:
Global
Theme:
Environmental Efficiency, AI, Blockchain
Document type:
Report
Organization:
International Telecommunication Union (ITU)
Author:
WG2 Co-chairmen
Target audience:
ITU members, experts in AI and environmental efficiency
Period of validity:
2020-2022
Approval date:
29 September 2020
Date of modifications:
None
Year:
2020
Region / City:
Geneva
Topic:
Radiocommunications, Telecommunications
Document Type:
Report
Organization / Institution:
ITU
Author:
Chairman, Working Party 5A
Target Audience:
ITU members, telecommunications experts, and industry professionals
Period of Validity:
20-30 July 2020
Approval Date:
10 August 2020
Date of Changes:
None
Context:
Report of the twenty-third meeting of ITU Working Party 5A, focusing on radiocommunications, preparations for WRC-23, and other related telecommunications activities.
Year:
2020
Region / City:
Global
Topic:
NR Coverage Enhancements, Evaluation Methodology
Document Type:
Report
Organization:
3GPP
Author:
Moderator (China Telecom)
Target Audience:
Companies and organizations involved in 3GPP, telecommunication industry
Validity Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Organization:
International Telecommunication Union (ITU), Telecommunication Standardization Sector (ITU-T)
Focus Group:
ITU-T Focus Group on AI for Health (FG-AI4H)
Study Period:
2017–2020
Document Code:
FG-AI4H-J-039
Deliverable:
DEL2.2
Version:
0.2.0
Draft Date:
20-09-2020
Meeting:
E-meeting, 30 September – 2 October 2020
Source:
Editors
Editors:
Luis Oala; Christian Johner; Pradeep Balachandran
Contributors:
Alixandro Werneck Leite; Andrew Murchison; Anle Lin; Juliet Rumball-Smith; Pat Baird; Peter G. Goldschmidt; Shan Xu; Sven Piechottka; Zack Hornberger
Purpose:
Discussion
Type of Document:
Technical paper / Draft deliverable
Keywords:
Regulatory Checklist; Software-as-a-Medical Device; AI based Medical Devices
Scope:
Good machine learning practice guidelines for AI-based health solutions
Regulatory References:
IMDRF; FDA
Lifecycle Coverage:
Pre-market and post-market requirements for AI-based medical devices
Year:
2022
Event:
3GPP TSG RAN WG1 #109-e e-Meeting
Agenda item:
9.1.1.1
Source:
Moderator (MediaTek)
Type of document:
Meeting summary / technical report
Topic:
Extension of unified TCI framework for MTRP, multi-TRP UL and DL transmission
Document purpose:
Discussion and decision
Contributors:
Ericsson, Samsung, Docomo, vivo, Qualcomm, ZTE, MTK, CATT, NEC, Lenovo, Intel, Huawei, Apple, Nokia, OPPO, Futurewei, Spreadtrum, Sony, LGE, ITRI, TransHold, Fraunhofer, Fujitsu, CMCC, CEWiT
Targeted devices:
CPE, FWA, vehicle, industrial devices
Key focus:
Rel-17 and Rel-18 MTRP schemes, UL and DL TCI state updates, single and multi-DCI operation
Year:
2018
Region / City:
Geneva
Topic:
Telecommunication Standards
Document Type:
Report
Organization / Institution:
International Telecommunication Union
Author:
ITU-T
Target Audience:
ITU-T members, telecommunication professionals
Period of Validity:
N/A
Approval Date:
26 February - 2 March 2018
Date of Amendments:
N/A