№ files_lp_4_process_2_61299
File format: docx
Character count: 6782
File size: 50 KB
Notification of retirement of copper network facilities by an incumbent local exchange carrier with details on affected locations, planned fiber replacement, and procedures for filing objections or comments with the FCC.
Year:
2025
Region / City:
Hamilton, OH; New Miami Village, OH
Subject:
Copper network retirement and fiber upgrade
Document Type:
Network change notification
Organization:
Federal Communications Commission (FCC)
Author:
Cincinnati Bell Telephone LLC d/b/a altafiber Network Solutions
Target Audience:
Information service providers and telecommunications service providers
Implementation Date:
On or after April 18, 2025
Contact:
Julia M. Riess, Regulatory Manager—Government Relations, Cincinnati Bell Telephone LLC, [email protected]
Note:
, (859) 653-0220
Network Disclosure Number:
25-006
Change Type:
Copper retirement and fiber-to-the-premises installation
Affected Locations:
Addresses served by the Hamilton wire center (HMTNOHHM) impacted by upgrade and road construction projects
Filing Method:
Public notice on Internet and service to interconnecting providers
Comment Filing Instructions:
FCC Electronic Comment Filing System (ECFS) or email to [email protected]
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / city:
Washington
Subject:
Procurement of Ethernet Wireline or Fixed Wireless Services
Document Type:
Request for Quotation (RFQ)
Organization / Institution:
Washington Technology Solutions (WaTech)
Author:
Not specified
Target Audience:
Contractors specializing in network services
Period of validity:
Until the award of contract
Approval Date:
Not specified
Date of Changes:
Not specified
Project:
Eden Geothermal Project
Tender reference:
EGL-ITT-C057
Revision:
Ver 1.0
Release Date:
5th October 2020
Issuer:
Eden Geothermal Limited (“EGL”)
Supplier Response Date:
10th November 2020 at 16:00 hours
Year:
2021
Region / city:
Shale Hills Valley
Theme:
Hydrology, Geosciences
Document Type:
Data file
Organization / Institution:
The Pennsylvania State University
Author:
Dr. Xin Gu, Dr. Susan Brantley
Target Audience:
Researchers, Geoscientists
Period of Validity:
Data collected in 2019
Approval Date:
2021-03-11
Date of Changes:
N/A
Description:
Data file containing detailed descriptions of wireline logs from the Shale Hills CZO borehole, including various geophysical measurements.
Year:
2023
Region:
Southwest, Midwest, West, Southeast
Topic:
Telecommunications services, wireline and wireless
Document Type:
Service description
Organization:
AT&T
Author:
AT&T
Target Audience:
Wholesale customers, telecom providers
Period of Effect:
Not specified
Approval Date:
Not specified
Change Date:
Not specified
Document Status:
Active
Year:
2021
Region / City:
Puerto Rico
Topic:
Broadband and voice service support
Document Type:
Public Notice
Agency:
Federal Communications Commission
Author:
Wireline Competition Bureau
Target Audience:
Telecommunications service providers, local government, and regulatory authorities
Effective Period:
10-year period starting from the date of announcement
Approval Date:
June 21, 2021
Amendment Date:
N/A
Year:
2022
Region / City:
Uniontown, PA / Pittsburgh, PA
Topic:
Network Change Notification
Document Type:
Certification / Report
Organization:
Verizon Pennsylvania LLC
Author:
Jennifer E. Pelzman
Target Audience:
Interested parties, regulatory bodies
Effective Period:
February 1, 2022 and onwards
Approval Date:
January 19, 2022
Amendment Date:
N/A
Year:
2022
Region / City:
United States
Subject:
Supply chain reporting
Document type:
Public Notice
Agency / Organization:
Federal Communications Commission (FCC)
Author:
Office of Economics and Analytics, Wireline Competition Bureau
Target audience:
Providers of advanced communications services
Effective period:
From February 4, 2022
Approval date:
February 4, 2022
Amendment date:
None
Year:
2024
Region / City:
USA
Topic:
Cybersecurity
Document Type:
Report and Order
Organization / Institution:
Federal Communications Commission
Author:
Federal Communications Commission
Target Audience:
Telecommunications professionals
Effective Period:
September 20, 2024
Approval Date:
September 13, 2024
Modification Date:
N/A
Year:
2025
Region / City:
Hamilton, OH
Subject:
Copper network retirement
Document Type:
Regulatory filing
Organization:
Federal Communications Commission (FCC)
Author:
Cincinnati Bell Telephone LLC d/b/a Altafiber Network Solutions
Target Audience:
Telecommunications service providers, network operators
Effective Date:
May 1, 2025
Date of Approval:
February 3, 2025
Date of Last Modification:
N/A
Date:
June 20, 2024
Region / City:
Washington, USA
Type:
Government correspondence
Organization:
Washington Technology Solutions
Author:
Susan Steele, RFQ Coordinator
Recipients:
All Master Services Agreement - Wireline Ethernet and Fixed Wireless Vendors
Purpose:
Provide site drawings for RFQ locations
Relevant Sites:
DORRCH0301, ESD2002, DSHS6023, DSHS4052, DOLC2723, VE-TAC2708/DSHS5011/ESD2712, DFWTucan, DSHS6006, DSHS2072, DOLD1802, DFWSTAR
Document Type:
Amendment
Year:
2024
Region / City:
Washington, D.C.
Subject:
Broadband Deployment, Infrastructure Investment
Document Type:
Order
Agency / Organization:
Federal Communications Commission
Author:
Trent B. Harkrader
Target Audience:
Utilities, Industry Associations, Stakeholders in Broadband Deployment
Effective Period:
Until March 13, 2024
Approval Date:
February 23, 2024
Amendment Date:
February 23, 2024
Contextual Description:
Document provides an official extension for filing reply comments in a regulatory proceeding related to broadband infrastructure investment rules.
Year:
2026
Region / City:
Washington
Topic:
Procurement / Telecommunications Services
Document Type:
Request for Quotation (RFQ)
Organization / Institution:
Washington Technology Solutions (WaTech)
Author:
WaTech
Target Audience:
Contractors, Service Providers
Effective Period:
February 11, 2026 - March 4, 2026
Approval Date:
February 11, 2026
Amendment Date:
N/A
Year:
2023
Region / City:
United States
Topic:
Broadband Deployment, Rural Connectivity
Document Type:
Official Report
Agency:
Wireline Competition Bureau
Author:
Federal Communications Commission
Target Audience:
Telecommunications carriers, broadband service providers, regulatory bodies
Period of Validity:
2024-2028
Approval Date:
August 30, 2023
Date of Changes:
N/A
Context:
This is an official FCC report detailing the offer of Enhanced A-CAM support for broadband providers to expand broadband access in rural areas, with a focus on state-level elections for support and related deployment obligations.
Year:
2023
Region / City:
United Kingdom
Subject:
Chemistry
Document Type:
Teacher Instructions
Author:
OCR
Target Audience:
Teachers, Technicians
Period of Validity:
N/A
Approval Date:
N/A
Date of Last Revision:
N/A
CERTIFICATE OF DELIVERYLEAD RESULTS NOTIFICATION FOR LEAD AND COPPER MONITORING PARTICIPANTSPWS NAME
Year:
2007
Region / City:
Kansas
Theme:
Lead & Copper Monitoring
Document Type:
Certificate of Delivery
Organization:
Kansas Department of Health and Environment (KDHE)
Author:
Not specified
Target Audience:
Public Water Supply Systems, Consumers
Period of Validity:
For monitoring period specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
Michigan
Theme:
Water Service Line Replacement, Lead and Copper Rule
Document Type:
Policy
Organization / Institution:
City of East Grand Rapids, Department of Public Works
Author:
City of East Grand Rapids
Target Audience:
Property owners, Contractors, Public Services
Period of validity:
2021-2041
Approval Date:
N/A
Modification Date:
N/A
Note:
Year
Contextual description:
This document outlines the specifications for the installation, testing, and delivery of communications copper horizontal cabling as part of a larger structured cabling system.
Year:
2025
Region / city:
United States
Topic:
Water regulations, lead and copper control
Document type:
Federal regulation
Agency:
Office of Water (4606M)
Author:
Environmental Protection Agency
Target audience:
State and local water authorities, regulatory bodies
Validity period:
Ongoing
Approval date:
July 2025
Date of changes:
October 30, 2024
Description:
Document providing a detailed comparison of federal requirements with state primacy agencies’ authorities related to lead and copper control in drinking water, summarizing rules from multiple revisions.
Year:
2021
Region / City:
United States
Topic:
Water Safety, Lead Exposure, Public Health
Document Type:
Template
Institution / Organization:
U.S. Environmental Protection Agency (EPA)
Author:
U.S. Environmental Protection Agency
Target Audience:
Public Water Systems, Property Owners, Residents
Effective Period:
Ongoing
Approval Date:
2021
Date of Modifications:
N/A
Year:
2021
Region / City:
United States
Topic:
Water Safety, Lead Exposure
Document Type:
Template
Organization / Institution:
Environmental Protection Agency (EPA)
Author:
Environmental Protection Agency (EPA)
Target Audience:
Public water systems, households with lead service lines
Effective Period:
Ongoing
Approval Date:
2021
Date of Changes:
N/A
Contextual description:
Document provides templates for water systems to notify customers about known or potential lead-contaminated service lines in compliance with the 2021 Lead and Copper Rule Revisions.