№ files_lp_3_process_9_37614
File format: docx
Character count: 104947
File size: 3176 KB
The document provides an analysis of the compatibility and sharing conditions between Maritime Broadband Radio (MBR) and several other systems in the 5850-5900 MHz frequency band, including Fixed Satellite Service and Broadband Fixed Wireless Access.
Year:
2017
Region / city:
Europe
Topic:
Frequency spectrum compatibility studies
Document type:
ECC Report
Organization / institution:
ECC (Electronic Communications Committee)
Author:
ECC
Target audience:
Regulatory bodies, maritime operators, communications professionals
Period of validity:
Not specified
Approval date:
27 January 2017
Date of amendments:
None
Frequency bands:
5850-5900 MHz
Main systems:
Maritime Broadband Radio (MBR), Fixed Satellite Service (FSS), Broadband Fixed Wireless Access (BFWA), Radiolocation, Intelligent Transport Systems
Additional calculations:
MBR systems with reduced maximum e.i.r.p. of 25 dBW
Study focus:
Compatibility and interference between MBR and other systems in the specified frequency range
Interference protection:
Calculated protection distances for various systems
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Document Type:
Template / Guidelines
Audience:
Authors submitting to MBR ECS
Page Length:
5–15 pages
Citation Style:
APA
Content Focus:
Case study development, narrative construction, research rigor, analysis interpretation
Sections Included:
Overview, Instructions, Cover Page, Executive Summary, Case Study, Discussion, Conclusions, References, Reviewer Appendix
Submission Considerations:
Significance, novelty, clarity of analysis, engagement of readers
Year:
2023
Region / city:
N/A
Topic:
Interview format, Business and Managerial Practices
Document type:
Template
Organization / institution:
N/A
Author:
N/A
Target audience:
Academic researchers, Business professionals
Validity period:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2022
Region / City:
Canada
Subject:
Migratory bird research
Document Type:
Scientific permit application
Agency / Institution:
Canadian Wildlife Service
Author:
Not specified
Target Audience:
Wildlife researchers, permit applicants
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Date
contextual description:
Directory form for technology suppliers listing on The MBR Site, requesting specific company details and permission for publishing.
Year:
2022
Region / City:
Gauteng
Subject:
Broadband Network, Telecommunications
Document Type:
Invitation to Bid
Organization / Institution:
SITA
Author:
Not specified
Target Audience:
Bidders
Period of Validity:
120 days from the Closing Date
Approval Date:
26 October 2022
Modification Date:
Not specified
Year:
2026
Region / City:
Utah, USA
Topic:
Healthcare IT Infrastructure and Network Services
Document Type:
Request for Proposal (RFP)
Organization:
Intermountain Healthcare
Administered by:
Fiberutilities Group LLC
Target Audience:
Service providers and network vendors
Program:
FCC Healthcare Connect Fund (HCF)
RFP Number:
100053986
Submission Deadline:
28 days after USAC posting
Contact Person:
Candace DeGraff
Address:
222 Third Avenue SE, Suite 500, Cedar Rapids, IA 52401
Phone:
319-297-6913
Email:
[email protected]
Scope:
Broadband connectivity, managed services, network equipment, and warranties for all consortium sites
Funding:
Partial funding through HCF for NRC and up to three years of MRC
Year:
2026
Region / City:
Zhengzhou, China
Topic:
Optics, Plasmonics, Spectral Sensing
Document Type:
Research Paper
Organization / Institution:
Institute of Physics, Henan Academy of Sciences, Zhejiang Engineering Research Center of MEMS, Foshan University
Authors:
Qilin Zheng, Li Liang, Shunji Yang, Luyang Tong, Wenqiang Wang, Jibo Tang, Yu Zhang, Bintong Huang, Xiaobo He
Target Audience:
Researchers in optics and nanotechnology
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Suzhou, China
Topic:
Optoelectronics, Metasurfaces
Document Type:
Research Article
Institution:
Soochow University, School of Optoelectronic Science and Engineering
Author:
Rui Wang, Chenqian Wang, Ti Sun, Xin Hu, Chinhua Wang
Target Audience:
Researchers, Academics in Optoelectronics
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
The document presents a study on the optimization and calculation of two-dimensional all-dielectric chiral metasurfaces for simultaneous broadband and high circular dichroism, using particle swarm optimization and multipole moment calculations.
Year:
2020
Region / City:
Burke County, NC
Subject:
Broadband Expansion
Document Type:
Request for Proposals (RFP)
Organization:
Burke Development Inc. (BDI)
Author:
Burke Development Inc. (BDI)
Target Audience:
Internet Service Providers (ISPs), potential project partners
Duration:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2022
Region / City:
Connecticut
Topic:
Broadband Infrastructure Programs
Document Type:
Template
Agency / Institution:
Department of Energy and Environmental Protection (DEEP)
Target Audience:
Broadband service providers, government agencies, organizations
Submission Deadline:
August 26, 2022
Contact Information:
[email protected]
Program:
Broadband Infrastructure Program
Supplemental Documents:
Maps, data sets, research reports, financial documents
Year:
2015
Region / City:
Bellevue
Topic:
Telecommunications, Internet and Cable TV Services
Document Type:
Survey Report
Organization / Institution:
City of Bellevue, Northwest Research Group, LLC
Author:
Northwest Research Group, LLC
Target Audience:
Residents of Bellevue, Telecommunication Service Providers
Period of Validity:
October 29 - November 29, 2015
Approval Date:
03/04/2016
Date of Changes:
None
Program:
BEAD
Document Type:
Evidence Template Instructions and Schema
Purpose:
Guidance for completing the Unlicensed Fixed Wireless Service Evidence Template
Applicable Policy:
NTIA BEAD Restructuring Policy Notice
Issue Date:
June 6, 2025
Target Audience:
BEAD applicants
Submission Requirements:
All fields in Tabs 2–8 must be completed with supplemental evidence files
Content:
Network design assumptions, tower sites, sectors, BSLs, uplink/downlink MCS tables, logical network diagram
Technology Focus:
Unlicensed Fixed Wireless (ULFW)
Network Specifications:
Throughput, latency, coverage, oversubscription, RAN configurations, interference mitigation, system redundancy
Year:
2025
Region / City:
Dover, United Kingdom
Topic:
Electronic Communications
Document Type:
Notice
Authority / Institution:
Dover District Council
Author:
Michael Tayler
Target Audience:
Local Planning Authority
Period of Action:
28 days from receipt of this letter
Date of Approval:
26/03/2025
Date of Changes:
N/A
Context Description:
A notice regarding the intention to install broadband apparatus near 14 Mill Road, Wingham, in compliance with the Electronic Communications Code and relevant Planning Acts.
Year:
2010
Region / city:
Australia
Topic:
Mobile broadband services
Document type:
Terms and conditions
Organization:
Telstra
Author:
Telstra
Target audience:
BigPond Mobile Broadband users
Period of validity:
From 17 October 2010
Approval date:
17 October 2010
Amendment date:
25 November 2012
Year:
2021
Region / City:
United States
Theme:
Broadband Connectivity, Emergency Relief
Document Type:
Order
Agency / Institution:
Federal Communications Commission
Author:
Federal Communications Commission, Wireline Competition Bureau
Target Audience:
Consumers, Service Providers, Program Partners
Effective Period:
December 31, 2021
Approval Date:
December 8, 2021
Amendment Date:
N/A
Year:
2023
Region / City:
Oregon, Washington
Topic:
Telecommunications
Document Type:
Public Notice
Agency:
Federal Communications Commission (FCC)
Author:
FCC Wireline Competition Bureau
Target Audience:
Telecommunications industry professionals, regulatory bodies
Effective Period:
2023
Approval Date:
August 31, 2023
Modification Date:
N/A
Year:
2019
Region / City:
Washington, D.C.
Topic:
Telecommunications regulation, forbearance, broadband investment
Document Type:
Memorandum Opinion and Order
Agency:
Federal Communications Commission
Author:
Federal Communications Commission
Target Audience:
Telecommunications service providers, regulators, legal professionals
Period of Effectiveness:
N/A
Date of Approval:
July 26, 2019
Date of Amendments:
N/A
Year:
2021
Region / City:
Washington, D.C.
Topic:
Broadband Services for Low-Income Households
Document Type:
Report and Order
Agency / Institution:
Federal Communications Commission
Author:
Federal Communications Commission
Target Audience:
Low-income households, Broadband providers, Policy makers
Period of Action:
Emergency period related to COVID-19 pandemic
Approval Date:
February 25, 2021
Amendment Date:
February 26, 2021
Date:
September 19, 2023
Time:
10:00 a.m. – 12:20 p.m.
Location:
DEED Headquarters in St. Paul and virtual via Microsoft Teams
Type of document:
Meeting minutes
Organ / Institution:
Governor’s Task Force on Broadband
Chair:
Teddy Bekele
Participating institutions:
Department of Employment and Economic Development; Office of Broadband Development; Minnesota Department of Administration, Data Practices Office; NTIA
Topics:
Broadband infrastructure grants; Digital Equity Program; Infrastructure Investment and Jobs Act (IIJA); Broadband Equity, Access, and Deployment (BEAD); Open Meeting Law; Legislative process
Programs referenced:
Border-to-Border Broadband Grant; Lower Population Density Program; Line Extension Connection Program; Digital Opportunity Plan
Next meeting date:
November 30