№ files_lp_4_process_3_124702
File format: docx
Character count: 27057
File size: 133 KB
Technical meeting contribution summarizing study results and proposed technical points for inclusion in Clause 8.2 of TR 38.769 regarding evaluation assumptions, coverage characteristics, and air-interface design considerations for A-IoT outdoor scenarios in 3GPP RAN1 discussions.
Year:
2026
Location:
Gothenburg, Sweden
Event:
3GPP TSG RAN WG1 #124
Organization:
3GPP TSG RAN Working Group 1
Source:
Moderator (LG Electronics)
Document Type:
Technical meeting contribution
Title Reference:
Clause 8.2 of TR 38.769
Topic:
A-IoT air interface and deployment scenarios in outdoor environments
Agenda Item:
Sub-agenda 9.3 evaluation and technical proposals
Scope:
Conclusions and recommendations for outdoor scenarios
Technological Context:
3GPP Rel-19 and Rel-20 study items
Key Technical Areas:
R2D and D2R communication, coverage evaluation, modulation schemes, waveform design, synchronization signals
Devices Discussed:
Device 2b, Device C
Contributors Mentioned:
Huawei, HiSilicon, Qualcomm
Target Audience:
3GPP RAN1 delegates and technical contributors
Meeting Dates:
9–13 February 2026
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / city:
Hefei, China
Topic:
Wireless communication, IoT
Document Type:
Technical proposal
Organization:
3GPP
Author:
Huawei
Target audience:
Wireless communication engineers, IoT specialists
Validity period:
14th – 18th October, 2024
Approval Date:
N/A
Amendment Date:
N/A
Year:
2024
Region / City:
Fukuoka, Japan
Topic:
Ambient IoT in NR
Document Type:
Technical Report
Source:
Huawei, CMCC
Target Audience:
pCR1
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Gothenburg, SE
Topic:
A-IoT outdoor scenarios, air interface, and L1 procedures
Document Type:
Technical Proposal
Organization:
3GPP TSG RAN WG1
Author:
Moderator (LG Electronics)
Target Audience:
RAN1 members and stakeholders
Period of validity:
2026
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Event:
3GPP TSG-RAN WG1 Meeting #124
Location:
Gothenburg, Sweden
Dates:
February 9–13, 2026
Topic:
Low-power wake-up signal and receiver for NR (LP-WUS/WUR)
Technical area:
5G NR radio access network specifications
Document type:
Meeting discussion and decision summary with text proposals
Organization:
3GPP TSG-RAN WG1
Source:
Moderator (vivo)
Agenda item:
8.6
Related specifications:
3GPP TS 38.211 V19.0.0; 3GPP TS 38.212 V19.0.0; 3GPP TS 38.213; 3GPP TS 38.331
Purpose:
Discussion and decision on maintenance updates
Main content:
Text proposals for updating higher-layer parameter names and related definitions in NR specifications for LP-WUS/LP-SS
Participating companies mentioned:
Qualcomm; Samsung
Technical elements referenced:
LP-WUS; LP-SS; OOK modulation; sequence modulation; RRC parameters; wake-up information coding
Decision process:
Company preference and adoption proposals for technical text proposals TP1–TP6
Year:
2026
City:
Gothenburg
Country:
Sweden
Meeting:
3GPP TSG RAN WG1 #124
Agenda item:
10.5.4.3
Organization:
3GPP TSG RAN Working Group 1
Source:
Moderator (OPPO)
Document number:
R1-2601540
Document status:
Draft
Document for:
Discussion and Decision
Topic:
6G Radio (6GR) HARQ operation
Technical field:
Wireless communications and radio access technology
Related standards:
TR 38.914, TR 38.921, TR 38.922
Frequency scope:
Up to 52.6 GHz including FR1 and FR2-1
Key technologies:
HARQ, OFDM-based waveforms, LDPC, Polar Code, MIMO
Scope:
Physical layer control, data scheduling and retransmission mechanisms
Working group area:
RAN1 physical layer study for 6G radio access
Timeframe of meeting:
09–13 February 2026
Year:
2026
Location:
Gothenburg, Sweden
Document type:
Meeting report
Organization:
3GPP TSG RAN WG1
Author/Moderator:
CMCC, Apple
Agenda item:
11.5.4.1
Purpose:
Discussion & Decision
Version:
V000
Topics covered:
DCI formats, scheduling issues, AI integration, PDCCH monitoring, UE power saving, coverage and capacity challenges, 6GR downlink control design principles
Participants:
Samsung, ZTE, MediaTek, Qualcomm, Spreadtrum, NEC, Lenovo, TCL, Huawei, Sharp, ETRI, CATT, OPPO, Vivo, KT, Nokia, Xiaomi, IDCC, Panasonic, LGE, DOCOMO
Related technologies:
4G, 5G, NR, PDCCH, DL/UL scheduling
Year:
2026
Location:
RAN1_Brk#2, A3, Level 1
Topic:
A-IoT, ISAC, 6G waveform, R19/R20 mobile network features
Document type:
Session timetable
Organizer:
Hiroki
Audience:
Participants of RAN1#124 sessions
Period:
Monday to Friday
Session duration:
08:30–19:45
Breaks:
Morning coffee 10:30–11:00, Lunch 13:00–14:30, Afternoon coffee 16:30–17:00
Mode:
Online and offline
Year:
2026
Location:
Gothenburg, Sweden
Topic:
6G PDCCH Transmission Schemes
Document Type:
Draft Summary / Meeting Document
Organization:
3GPP TSG-RAN WG1
Author:
Moderator (Nokia)
Intended Audience:
3GPP RAN1 participants, industry stakeholders
Meeting Dates:
February 9–13, 2026
Agenda Item:
10.5.2.1
Work Item:
FS_6G_Radio
Contributions:
33 submitted proposals from multiple companies
Covered Technologies:
Sing-TRP, Multi-TRP, TN, NTN, PDCCH, CORESET, CCE, REG, MRSS
Purpose:
Summarize and organize proposals for discussion of downlink control channel transmission schemes
Year:
2026
Location:
Gothenburg, SE
Subject:
6G RAN downlink control and scheduling design
Document type:
Technical meeting report
Organization:
3GPP TSG RAN WG1
Authors:
Moderator (CMCC, Apple)
Intended audience:
RAN1 working group members, technical contributors
Agenda item:
11.5.4.1
Version:
V000
Topics covered:
DCI formats, DL/UL scheduling, AI integration, PDCCH monitoring, UE power saving, coverage and capacity, lessons from 4G/5G design, proposals for 6G
References:
Contributions from Samsung, ZTE, MediaTek, Qualcomm, Spreadtrum, NEC, Lenovo, TCL, Huawei, Sharp, ETRI, CATT, Tejas, Nokia
Meeting dates:
Feb. 9–13, 2026
Related documents:
R1-260XXXX, R1-2601283, R1-2600399, R1-2600575, R1-2600042, R1-2600122, R1-2600154, R1-2600309, R1-2600354
Summary:
Technical meeting report detailing 6G downlink control strategies, DCI format design, PDCCH monitoring, and efficiency considerations based on lessons learned from LTE/NR deployments.
Year:
2026
Location:
Gothenburg, Sweden
Document type:
Technical report
Organization:
3GPP TSG RAN WG1
Author:
Moderator (CMCC, Apple)
Agenda item:
10.5.4.1
Purpose:
Discussion & Decision
Target audience:
RAN1 members
Version:
V000
Topics:
DCI formats, scheduling, UE power saving, PDCCH monitoring, 6GR downlink control design, two-stage DCI, time/frequency domain adaptation
Note:
Year
Year:
2025
Location:
Gothenburg, Sweden
Topic:
5G NR SBFD TX/RX and measurement procedures
Document Type:
Technical report
Organization:
3GPP TSG RAN WG1
Author:
Moderator (Xiaomi)
Intended Audience:
3GPP members, RAN1 working group
Agenda Item:
8.3
Purpose:
Discussion and decision on Rel-19 SBFD procedures
Key Issues:
HARQ process ID determination for multi-PDSCH/PUSCH, collision handling
Related Documents:
R1-2600168, R1-2600863, R1-2600474, R1-2600595, R1-2600617, R1-2600727, R1-2601158, R1-2601235, R1-26001246, R1-2601417
Procedure References:
TS 38.214, Clause 5.1, Clause 6.1
Year:
2026
Location:
Gothenburg, Sweden
Topic:
Low NR band carrier aggregation via switching
Document type:
Technical contribution / meeting summary
Organization:
3GPP TSG RAN WG1
Authors:
Moderator (Apple), contributions from MediaTek, Apple, Ofinno, Qualcomm, Samsung, NTT DOCOMO, INC., Spreadtrum, Ericsson, CATT, Nokia, LG Electronics, ZTE, vivo, Google, OPPO
Target audience:
3GPP RAN working group members
Period:
February 9–13, 2026
Agenda item:
8.8
References:
RP-251315, TS38.213, TS38.133
Key topics:
UE requirements, switching gap, semi-static switching pattern, RRM requirements, carrier frequencies <1 GHz, co-located and synchronized network deployment, SCS 15 kHz, LBCA-SwitchingPattern
Year:
2026
Location:
Gothenburg, Sweden
Subject:
Low NR band carrier aggregation via switching
Document type:
Technical contribution / meeting report
Organization:
3GPP TSG RAN WG1
Author:
Moderator (Apple)
Participating companies:
Apple, MediaTek, Ofinno, Qualcomm, Samsung, NTT DOCOMO, Spreadtrum, Ericsson, CATT, Nokia, LG Electronics, ZTE, vivo, Google, OPPO
Agenda item:
8.8
Period:
Feb. 9–13, 2026
References:
TS 38.213, TS 38.214, TS 38.133, TS 38.331
Purpose:
Discussion/Decision
Sections included:
Introduction, Contact Information, Proposals for Online/Offline Sessions, Summary of Contributions, Appendices A–B
Endorsements:
Various companies’ agreements and preferences for specification changes
Detailed proposals:
Switching patterns, CSI-RS resource measurement, SCell activation procedure
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG RAN WG1
Document type:
Meeting summary
Agenda item:
8.2
Source:
Moderator (ZTE)
Contributors:
Apple, CATT, CEWiT, CMCC, Ericsson, ETRI, Fujitsu, FUTUREWEI, Google, Huawei/HiSilicon, HONOR, Intel, InterDigital, KDDI, LG, MediaTek, Meta, NEC, NICT, Nokia, NTT DOCOMO, OPPO, Panasonic, Qualcomm, Ruijie Networks, Samsung, Sharp, Sony, Spreadtrum, vivo, Xiaomi, ZTE, Lenovo, Ofinno
Topics:
UE-initiated/event-driven beam management, FR2 and sTRP beam reporting, UL signaling procedures, cross-CC measurement, RRC parameter alignment
Period:
Rel-19 maintenance phase
Date of meeting:
February 9–13, 2026
Purpose:
Discussion and decision on proposed changes and company contributions regarding beam management procedures in NR MIMO phase 5
Year:
2026
Location:
Gothenburg, Sweden
Meeting:
3GPP TSG RAN WG1#124
Agenda Item:
8.2
Source:
Moderator (ZTE)
Document Type:
Technical meeting summary
Topic:
UE-initiated/event-driven beam management for NR MIMO phase 5
Companies Involved:
Apple, CATT, CEWiT, CMCC, Ericsson, ETRI, Fujitsu, FUTUREWEI, Google, Huawei/HiSilicon, HONOR, Intel, InterDigital, KDDI, LG, MediaTek, Meta, NEC, NICT, Nokia, NTT DOCOMO, OPPO, Panasonic, Qualcomm, Ruijie Networks, Samsung, Sharp, Sony, Spreadtrum, vivo, Xiaomi, ZTE, Lenovo, Ofinno
Target Audience:
RAN1 delegates and participating companies
Issues Discussed:
Trigger-event detection, UL signaling content, UL signaling medium, Cross-CC measurement/report, RRC parameter alignment
Action Required:
Submission of text proposals and preparation of final company CRs
Contact Persons:
Listed by company with emails
Type of Source:
Technical standardization discussion document
Year:
2026
Date:
February 09–13, 2026
City:
Gothenburg
Country:
Sweden
Organization:
3GPP TSG RAN WG1
Meeting:
RAN WG1 #124
Source:
Moderator (OPPO)
Agenda item:
10.5.4.3
Document type:
Meeting discussion and decision document
Topic:
6G Radio (6GR) HARQ operation aspects
Technical domain:
Radio access technology and physical layer procedures
Technology scope:
6G radio access study and HARQ mechanisms
Frequency scope:
Up to 52.6 GHz including FR1 and FR2-1
Related technologies:
LTE, 5G NR, 6GR
Relevant standards references:
TR38.914, TR38.921, TR38.922, RP-253876, RP-250810
Document purpose:
Summary of contributions and discussion topics
Authoring role:
Meeting moderator
Year:
2026
Event:
3GPP TSG RAN WG1 Meeting #124
Location:
Gothenburg, Sweden
Date:
9–13 February 2026
Agenda Item:
8.7.2
Document Number:
R1-2601117
Organization:
3GPP TSG RAN Working Group 1
Source:
Moderator (Sony)
Moderator:
Martin Beale
Technical Domain:
IoT Non-Terrestrial Networks (IoT-NTN)
Release Version:
Rel-19
Document Type:
Feature Lead Summary / Technical discussion document
Related Specifications:
3GPP TS 36.211; 3GPP TS 36.213
Contributing Organizations:
Sony, Ericsson, Lenovo, LGE, Gatehouse Satcom, Nokia, InterDigital, ETRI, vivo, Sharp, Xiaomi, Spreadtrum (UNISOC), TCL, ZTE, Nordic Semiconductor, CMCC, OPPO
Primary Topics:
IoT-NTN maintenance issues, NPUSCH format 1 enhancements, uplink capacity improvements, OCC schemes, Early Data Transmission signaling reduction, CB-Msg3 and CB-Msg4 procedures
Referenced Contributions:
R1-26002257, R1-2601028, R1-2600076, R1-2600167, R1-2600317, R1-2600732, R1-2601063, R1-2601249, R1-2600478
Purpose:
Discussion
Contact List:
Points of contact from participating companies for the IoT-NTN work item discussion
Year:
2014–2015
Organization:
Department of Housing and Public Works
Document type:
Clause Bank / Legal Reference
Subject:
Standard contracts, alternative clauses, intellectual property, confidentiality
Authors:
Sam Mathers (PTD)
Reviewers:
Kerry Harding (DHPW Legal)
Version history:
V1.0, V1.1, V1.2
Effective period:
As per individual contract execution
Intended audience:
Customers and Suppliers under Government contracts
Date:
2025-07-24
Standard:
IEEE P802.11
Working Group:
IEEE 802.11
Document Type:
Comment resolution contribution
Subject:
Interference mitigation
Clause:
38.3.5
Related Specifications:
P802.11bn D0.1, P802.11be D0.3
Authors:
Shimi Shilo; Rani Keren; Oded Redlich
Affiliation:
Huawei
Revision:
Rev 0
Resolved CIDs:
209; 1620; 2794
Modulation and Coding:
LDPC
Bandwidths Covered:
20 MHz; 40 MHz; 80 MHz; 160 MHz; 320 MHz
Transmission Modes:
UHR PPDU; UHR ELR PPDU
Tables Referenced:
Table 38-11; Table XX-XX; Table ZZ-ZZ; Table QQ-QQ
Technical Scope:
Definition of IM pilots, LDPC tone mapping, UHR-MCS parameter updates