№ files_lp_4_process_2_81945
Summary of technical proposals and workplan for 6GR downlink and uplink control, including scheduling options, DCI format studies, and UE energy considerations within RAN1#124 discussions.
Year: 2026
Location: Gothenburg, Sweden
Document type: Technical report
Organization: 3GPP TSG RAN WG1
Author: Moderator (CMCC, Apple)
Agenda item: 10.5.4.1
Purpose: Discussion & Decision
Target audience: RAN1 members
Version: V000
Topics: DCI formats, scheduling, UE power saving, PDCCH monitoring, 6GR downlink control design, two-stage DCI, time/frequency domain adaptation
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.