№ lp_1_2_70543
File format: docx
Character count: 27259
File size: 1654 KB
This document outlines a general measurement and verification (M&V) plan for quantifying the performance benefits of advanced rooftop-unit control (ARC) retrofit technologies.
Year:
2014
Region / city:
United States
Topic:
Energy savings, HVAC, Building technologies
Document type:
Internal report
Organization:
National Renewable Energy Laboratory (NREL)
Author:
NREL
Target audience:
Industry professionals, researchers, government agencies
Action period:
N/A
Approval date:
August 15, 2014
Modification date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2013
Region / City:
California
Topic:
Photovoltaic Systems, Inspection Guidelines
Document Type:
Inspection Guide
Organization / Institution:
City Government, California
Author:
Unknown
Target Audience:
Inspectors, Engineers, PV System Installers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2021
Region / City:
California
Topic:
Clean Energy, Net Energy Metering, Solar Energy
Document Type:
Letter
Organization:
Coalition for San Francisco Neighborhoods
Author:
Mari Eliza
Target Audience:
California Board of Supervisors, California Public Utilities Commission, Governor Gavin Newsom
Action Requested:
Resolution support for Net Energy Metering policy
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2015
Region / city:
South Asia / India
Sector:
Energy and Extractives
Type of Document:
Program Information Document
Organization / institution:
World Bank
Author:
Not specified
Target Audience:
Government bodies, financial institutions, energy sector stakeholders
Period of validity:
Not specified
Date of approval:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
California
Theme:
Energy Efficiency, Building Codes, HVAC Systems
Document Type:
Draft Ordinance
Organization:
California Energy Commission, California Public Utilities Commission
Author:
California Energy Commission
Target Audience:
Local Government Officials, Building Code Administrators
Validity Period:
August 14, 2025 onwards
Approval Date:
August 14, 2025
Amendment Date:
N/A
Year:
2026
Region / City:
Minneapolis, MN
Topic:
Fall Protection Systems
Document Type:
Technical Specification
Organization:
EDGE Fall Protection, LLC
Author:
EDGE Fall Protection, LLC
Target Audience:
Construction Professionals
Effective Date:
2026
Revision Date:
N/A
Year:
2021
Region / City:
Minneapolis, MN
Topic:
Safety Standards and Fall Protection
Document Type:
Technical Specification
Organization / Institution:
EDGE Fall Protection, LLC
Author:
EDGE Fall Protection, LLC
Target Audience:
Contractors, Safety Engineers, and Construction Workers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2019
Region / City:
India
Topic:
Environmental and Social Assessment, Rooftop Solar Program
Document Type:
Addendum
Organization / Institution:
World Bank
Author:
World Bank, Ministry of New and Renewable Energy (MNRE), State Bank of India (SBI)
Target Audience:
Stakeholders in the residential solar sector, developers, lenders, policymakers
Period of Action:
2019-2022
Approval Date:
July 1, 2019
Date of Revisions:
N/A
Year:
2022
Region / City:
Hubli
Theme:
Solar Energy, Renewable Energy, Public Procurement
Document Type:
Tender Document
Issuing Organization:
HESCOM
Author:
Superintending Engineer (Ele), HESCOM
Target Audience:
Vendors, Bidders
Period of Action:
Phase-II of GCRTS Scheme
Date of Approval:
January 2022
Date of Amendments:
N/A
Year:
2024
Region / City:
India, Bihar
Subject:
Rooftop Solar PV Projects
Document Type:
Request for Qualification (RFQ) and Request for Proposal (RFP)
Organization / Institution:
Ministry of Railways, Government of India
Author:
Railway Board
Target Audience:
Solar project developers and EPC contractors
Project Scope:
Design, procurement, installation, testing, commissioning, and 25-year operation of rooftop solar PV systems
Performance Security:
Rs 16.02 Lakh/MWp
Bid Document Cost:
Rs. 34,810/- (Inclusive of GST)
Bid Security / EMD:
Rs. 10.68 Lakh/MW
Submission Deadline:
As per NIT on e-bidding portal
Pre-Bid Conference Date:
23.01.2024
Technical Bid Opening Date:
12.02.2024, 15:30 hrs
PPA Duration:
25 years
Contact:
Office of the Sr. DEE/G/SEE, DRM Building, Sonpur, Bihar-851126; Mr. Shivendra Kumar, Email: [email protected], Mobile: 9771429300; Mr. Jai Prakash, Email: [email protected], Mobile: 9771429304
Year:
2023
Country:
India
Region / City:
Danapur, Patna, Bihar
Subject:
Rooftop Solar PV Projects
Document Type:
Request for Qualification (RFQ) and Bidding Document
Issuing Authority:
Ministry of Railways, Government of India
Project Scope:
Implementation, operation, and maintenance of rooftop solar PV systems for power generation and supply
Tender Number:
EL/50/DNR/Solar/3.252 MWp/2022-23
Date of Issue:
03.05.2023
Pre-Bid Meeting Date:
11.05.2023
Technical Bid Opening Date:
29.05.2023
Contract Duration:
25 years (Power Purchase Agreement)
Eligibility Criteria:
Technical experience in solar installations and financial capacity including turnover and net worth requirements
Financial Requirements:
Average turnover of Rs.150 lakh/year and positive net worth for last three financial years
Security Requirements:
Performance Bank Guarantee and Bid Security/EMD
Submission Mode:
E-bidding portal with physical document submission
Implementing Agency Role:
Design, procurement, installation, commissioning, and O&M of solar PV systems
Contact Office:
Office of the Sr. DEE/G/DNR, DRM Office, Danapur
Grade:
8
Business area:
Environment
Reporting line:
Programme Manager (Retrofit)
Team:
Retrofit
Note:
Job Purpose
The GMCA’s Retrofit Team has an exciting opportunity for a Project Manager to play a pivotal role in translating and applying the strategic priorities of the GMCA into delivery.The purpose of:
project management, stakeholder management, commissioning, and policy / strategy implementation.
Year:
2023
Region / City:
Greater Manchester
Theme:
Retrofit, Environmental Policy, Local Government
Document Type:
Job Description
Organization:
GMCA (Greater Manchester Combined Authority)
Author:
GMCA Retrofit Team
Target Audience:
Potential applicants for Project Manager position
Duration:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Note:
Year
Description:
A technical application form for retrofitting emission control devices on non-road mobile machinery engines under the NRMM-RAS scheme, detailing required information for approval and compliance with standards.
Year:
2023
Region / City:
Greater Manchester
Theme:
Housing Retrofit, Net Zero, Public Sector Procurement
Document Type:
Framework Agreement
Authority/Organization:
Greater Manchester Combined Authority (GMCA)
Author:
GMCA
Target Audience:
Public sector organizations, housing providers, community organizations, education providers, third sector organizations
Period of Validity:
Ongoing
Approval Date:
N/A
Modification Date:
N/A
Year:
2019
Region / City:
La Plata, Maryland
Theme:
Stormwater Management Retrofit
Document Type:
Bid Form
Institution:
The County Commissioners of Charles County, Maryland
Author:
The County Commissioners of Charles County, Maryland
Target Audience:
Contractors, Bidders
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2022
Region / City:
West of England
Topic:
Retrofit accelerator program, homeowner advice
Document Type:
FAQ
Organization / Institution:
West of England Combined Authority (WECA)
Author:
West of England Combined Authority
Target Audience:
Prospective partners for the retrofit accelerator program
Period of Validity:
Ongoing
Approval Date:
N/A
Modification Date:
N/A
Year:
2026
Region / City:
Geneva
Theme:
Vehicle regulations and automated driving systems
Document type:
UN Working Party Proposal
Organization:
United Nations Economic Commission for Europe, Inland Transport Committee, World Forum for Harmonization of Vehicle Regulations, Working Party on Pollution and Energy
Author:
Task Force on Automated Vehicles Regulations Screening (AVRS)
Target audience:
Contracting Parties to the 1958 Agreement, vehicle regulatory authorities
Scope:
Type approval of vehicles with Automated Driving Systems (ADS)
Amendments:
Updates to UN Regulation Nos. 24, 85, 115, 133, 143, 177
Footnotes updated:
Yes
Vehicle categories introduced:
X and Y
Switching fuel restrictions:
Extended to ADS users
Year:
2026
Region / City:
Philippines
Theme:
Energy efficiency, sustainable buildings, green retrofitting
Document type:
Guide / Reference
Organization:
Baker & McKenzie
Author:
Baker & McKenzie International
Target audience:
Building owners, developers, ecozone operators, industry professionals
Legal framework referenced:
Republic Act No. 11285, RE Act of 2008, Clean Air Act, Philippine Green Building Code
Certification standards:
LEED, BERDE
Award programs:
Energy Efficiency Excellence Awards, Green, Healthy, Smart, and Sustainable Ecozone Award
Eligibility criteria:
Energy consumption thresholds, building age and size, compliance with environmental regulations
Content rights:
Copyright © 2026 Baker & McKenzie
Year:
2026
Jurisdiction:
United States
Program:
Green and Resilient Retrofit Program (GRRP)
Document Type:
Financial Agreement / Promissory Note
Issuing Authority:
U.S. Department of Housing and Urban Development (HUD)
Project Name:
[INSERT PROJECT NAME]
Project Location:
[INSERT PROJECT LOCATION]
Loan Number:
GRRP Loan No. [INSERT]
Effective Date:
[INSERT DATE]
Interest Rate:
1% per annum
Payment Terms:
Annual installments based on Restricted Surplus Cash
Maturity Date:
[INSERT MATURITY DATE]
Relevant Legislation:
Inflation Reduction Act of 2022, Section 30002, Title III
Year:
2026
Region / City:
Philippines
Topic:
Green Building, Energy Efficiency
Document Type:
Guide
Author:
Baker & McKenzie
Target Audience:
Businesses, Government Agencies, Ecozone Developers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Relevant Laws:
Republic Act No. 11285, Republic Act No. 9513, Republic Act No. 8749
Certification Requirements:
LEED, BERDE
Energy Consumption Requirements:
≥100,000 kilowatt-hours per year
Building Area Requirements:
3,000–5,000 square meters (for some categories)
Incentive Type:
Non-fiscal
Award Categories:
Energy Management, Green Building, Retrofits, Ecozone Development
Description:
A guide outlining government-funded initiatives and awards to incentivize energy efficiency and sustainable building practices in the Philippines.
Year:
2026
Region / City:
Detroit, Michigan, USA
Subject:
Military vehicle equipment retrofit
Document Type:
Sources sought notice
Organization / Agency:
Army Contracting Command – Detroit, Product Manager Heavy Tactical Vehicles
Author:
Tyler Croteau, Contract Specialist
Target Audience:
Potential vendors
Period of Validity:
Until further notice
Submission Instructions:
Electronic submission to specified email; attachments must be compatible with Microsoft Windows 10; submissions over 10 MB require DoD SAFE file drop-off
Quantity Required:
Up to 26 retrofit kits
Components:
HIAB 144F B-1 HiDUO crane, mounting hardware, hoses, tubes, brackets, labels, fasteners, electrical tape, and wiring harnesses
Purpose:
Informational planning for potential procurement; not a Request for Proposal (RFP) or binding contract