№ lp_1_2_03823
File format: docx
Character count: 14834
File size: 124 KB
Year:
2013
Region / City:
California
Topic:
Photovoltaic Systems, Inspection Guidelines
Document Type:
Inspection Guide
Organization / Institution:
City Government, California
Author:
Unknown
Target Audience:
Inspectors, Engineers, PV System Installers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Solar Energy, Photovoltaic Systems
Document Type:
Technical Plan
Target Audience:
Contractors, Engineers
Context:
Technical source document outlining standard plans for solar PV system installations for residential properties.
Year:
2016
Region / City:
Poway, California
Topic:
Solar Pool Heating Systems, Building Codes, Inspection Guidelines
Document Type:
Inspection Guide
Organization / Institution:
City of Poway Development Services Department, Building Division
Author:
Poway Building Division
Target Audience:
Contractors, Inspectors, Homeowners
Validity Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / City:
California
Theme:
Electrical Systems, Solar Energy, Battery Storage
Document Type:
Inspection Guideline
Author:
Not specified
Target Audience:
Inspectors, Contractors, Engineers
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
System Type:
Battery Storage System, Solar PV
Required Compliance:
California Building Standards Codes, NEC
Manufacturer Instructions:
Required
Scope of Work:
Inspection Procedures
Technical Details:
DC-coupled, AC-coupled, Overcurrent Protection, Disconnecting Means
Note:
Not for integration with bipolar or hybrid PV systems
Note:
Year
Subject:
Solar Energy, Photovoltaic Systems
Document Type:
Technical Plan
Target Audience:
Contractors, Engineers
Context:
Technical source document outlining standard plans for solar PV system installations for residential properties.
Year:
2016
Region / City:
Poway, California
Topic:
Solar Pool Heating Systems, Building Codes, Inspection Guidelines
Document Type:
Inspection Guide
Organization / Institution:
City of Poway Development Services Department, Building Division
Author:
Poway Building Division
Target Audience:
Contractors, Inspectors, Homeowners
Validity Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / City:
California
Theme:
Electrical Systems, Solar Energy, Battery Storage
Document Type:
Inspection Guideline
Author:
Not specified
Target Audience:
Inspectors, Contractors, Engineers
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
System Type:
Battery Storage System, Solar PV
Required Compliance:
California Building Standards Codes, NEC
Manufacturer Instructions:
Required
Scope of Work:
Inspection Procedures
Technical Details:
DC-coupled, AC-coupled, Overcurrent Protection, Disconnecting Means
Note:
Not for integration with bipolar or hybrid PV systems
Year:
2014
Region / city:
United States
Topic:
Energy savings, HVAC, Building technologies
Document type:
Internal report
Organization:
National Renewable Energy Laboratory (NREL)
Author:
NREL
Target audience:
Industry professionals, researchers, government agencies
Action period:
N/A
Approval date:
August 15, 2014
Modification date:
N/A
Year:
2021
Region / City:
California
Topic:
Clean Energy, Net Energy Metering, Solar Energy
Document Type:
Letter
Organization:
Coalition for San Francisco Neighborhoods
Author:
Mari Eliza
Target Audience:
California Board of Supervisors, California Public Utilities Commission, Governor Gavin Newsom
Action Requested:
Resolution support for Net Energy Metering policy
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2015
Region / city:
South Asia / India
Sector:
Energy and Extractives
Type of Document:
Program Information Document
Organization / institution:
World Bank
Author:
Not specified
Target Audience:
Government bodies, financial institutions, energy sector stakeholders
Period of validity:
Not specified
Date of approval:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
California
Theme:
Energy Efficiency, Building Codes, HVAC Systems
Document Type:
Draft Ordinance
Organization:
California Energy Commission, California Public Utilities Commission
Author:
California Energy Commission
Target Audience:
Local Government Officials, Building Code Administrators
Validity Period:
August 14, 2025 onwards
Approval Date:
August 14, 2025
Amendment Date:
N/A
Year:
2026
Region / City:
Minneapolis, MN
Topic:
Fall Protection Systems
Document Type:
Technical Specification
Organization:
EDGE Fall Protection, LLC
Author:
EDGE Fall Protection, LLC
Target Audience:
Construction Professionals
Effective Date:
2026
Revision Date:
N/A
Year:
2021
Region / City:
Minneapolis, MN
Topic:
Safety Standards and Fall Protection
Document Type:
Technical Specification
Organization / Institution:
EDGE Fall Protection, LLC
Author:
EDGE Fall Protection, LLC
Target Audience:
Contractors, Safety Engineers, and Construction Workers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2019
Region / City:
India
Topic:
Environmental and Social Assessment, Rooftop Solar Program
Document Type:
Addendum
Organization / Institution:
World Bank
Author:
World Bank, Ministry of New and Renewable Energy (MNRE), State Bank of India (SBI)
Target Audience:
Stakeholders in the residential solar sector, developers, lenders, policymakers
Period of Action:
2019-2022
Approval Date:
July 1, 2019
Date of Revisions:
N/A
Year:
2022
Region / City:
Hubli
Theme:
Solar Energy, Renewable Energy, Public Procurement
Document Type:
Tender Document
Issuing Organization:
HESCOM
Author:
Superintending Engineer (Ele), HESCOM
Target Audience:
Vendors, Bidders
Period of Action:
Phase-II of GCRTS Scheme
Date of Approval:
January 2022
Date of Amendments:
N/A
Year:
2024
Region / City:
India, Bihar
Subject:
Rooftop Solar PV Projects
Document Type:
Request for Qualification (RFQ) and Request for Proposal (RFP)
Organization / Institution:
Ministry of Railways, Government of India
Author:
Railway Board
Target Audience:
Solar project developers and EPC contractors
Project Scope:
Design, procurement, installation, testing, commissioning, and 25-year operation of rooftop solar PV systems
Performance Security:
Rs 16.02 Lakh/MWp
Bid Document Cost:
Rs. 34,810/- (Inclusive of GST)
Bid Security / EMD:
Rs. 10.68 Lakh/MW
Submission Deadline:
As per NIT on e-bidding portal
Pre-Bid Conference Date:
23.01.2024
Technical Bid Opening Date:
12.02.2024, 15:30 hrs
PPA Duration:
25 years
Contact:
Office of the Sr. DEE/G/SEE, DRM Building, Sonpur, Bihar-851126; Mr. Shivendra Kumar, Email: [email protected], Mobile: 9771429300; Mr. Jai Prakash, Email: [email protected], Mobile: 9771429304
Year:
2023
Country:
India
Region / City:
Danapur, Patna, Bihar
Subject:
Rooftop Solar PV Projects
Document Type:
Request for Qualification (RFQ) and Bidding Document
Issuing Authority:
Ministry of Railways, Government of India
Project Scope:
Implementation, operation, and maintenance of rooftop solar PV systems for power generation and supply
Tender Number:
EL/50/DNR/Solar/3.252 MWp/2022-23
Date of Issue:
03.05.2023
Pre-Bid Meeting Date:
11.05.2023
Technical Bid Opening Date:
29.05.2023
Contract Duration:
25 years (Power Purchase Agreement)
Eligibility Criteria:
Technical experience in solar installations and financial capacity including turnover and net worth requirements
Financial Requirements:
Average turnover of Rs.150 lakh/year and positive net worth for last three financial years
Security Requirements:
Performance Bank Guarantee and Bid Security/EMD
Submission Mode:
E-bidding portal with physical document submission
Implementing Agency Role:
Design, procurement, installation, commissioning, and O&M of solar PV systems
Contact Office:
Office of the Sr. DEE/G/DNR, DRM Office, Danapur