№ lp_1_05517
File format: docx
Character count: 57923
File size: 2451 KB
The document provides the detailed specifications for a 48V PSU within the Open Rack V3 standard for power supply units, including electrical, mechanical, and environmental requirements.
Year:
2022
Region / City:
Global
Theme:
Power Supply Unit, Open Compute Project
Document Type:
Specification
Organization / Institution:
Open Compute Project
Authors:
Hamid Keyhani, Ted Tang, Dmitriy Shapiro, John Fernandes, Ben Kim, Tiffany Jin, Rommel Mercado
Target Audience:
Engineers, Technical Experts, System Designers
Effective Period:
N/A
Approval Date:
11/10/2022
Revision Date:
11/10/2022
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
Global
Subject:
Solar Charge Controllers
Document Type:
Technical Specifications Sheet
Manufacturer:
SUNRISE
Model:
MPPT12V-10A-Li-Ioni-boost, MPPT24V-10A-Li-Ioni-boost, MPPT36V-10A-Li-Ioni-boost, MPPT48V-10A-Li-Ioni-boost
Rated Panel Current:
10 A
Maximum Input Panel Voltage:
65 V
Battery Voltage:
12 V, 24 V, 36 V, 48 V
Charge Profile:
CC/CV with CAN BUS BMS integration
Efficiency:
Peak 98%, MPP Tracking > 99%
Operating Temperature:
-40°C to 85°C
Protection:
Battery Fuse 20A, Polarity Inversion, Over Temperature, Overload
Enclosure:
IP22 standard, IP65 optional
Dimensions:
146 x 96 x 38 mm (IP22), 148 x 94 x 34 mm (IP65)
Weight:
300 g
Communication Ports:
Dual CAN-bus, analog and digital I/O channels
Context:
Technical specification sheet detailing electrical parameters, protection features, and physical characteristics of MPPT SUNRISE solar charge controllers across four voltage configurations.
Year:
2025
Region / City:
United States
Subject:
F&A Waivers, Sponsored Programs, Cost-Sharing
Document Type:
FAQ
Organization:
Penn State University
Author:
Penn State University Administration
Target Audience:
Researchers, Sponsored Programs Staff
Effective Period:
Ongoing
Approval Date:
01-30-2025
Date of Changes:
None
Document Type:
Curriculum Vitae Template
Institution:
PSU
Intended Users:
Faculty Members
Content Structure:
Education; Employment; Dissertation; Refereed Publications or Other Creative Achievements; Non-Refereed Publications or Other Creative Achievements; Presentations at Professional Meetings; Honors, Grants, and Fellowships; Other Research and Other Creative Achievements; Teaching, Mentoring and Curricular Achievements; Community Outreach Achievements; Scholarly Works in Progress; Significant Professional Development Activities; Governance Activities; Professionally-related Service; Memberships in Professional Societies
Instructional Notes:
Information to be provided in reverse chronological order
Academic Coverage:
Degrees, Publications, Research, Teaching, Service, Professional Activities
Year:
2018
Region / city:
Australian Capital Territory, New Zealand, Northern Territory, Queensland, South Australia, Tasmania, Victoria, Western Australia
Topic:
Electric shock incidents from PSUs with integral pins
Document type:
Safety guidance
Agency / institution:
Not specified
Author:
Not specified
Target audience:
Manufacturers, regulators, and relevant stakeholders
Validity period:
May 2018 - 5 June 2024
Date of approval:
Not specified
Date of amendments:
Not specified
Context:
Guidance document detailing safety standards and testing methods for power supply units to prevent electric shock incidents.
Policy Reference:
NC SBOE Policy SHLT-003
Document Type:
School Mental Health Planning Template
Issuing Body:
North Carolina State Board of Education
Related Frameworks:
MTSS, SEL Standards, WSCC Framework
Required Assessments:
SHAPE Quality Assessment, Local Needs Assessment, Resource Mapping
Key Components:
SEL Integration, Mental Health Prevention, Early Intervention, Treatment and Referral, Data Evaluation
Required Attachments:
Detailed Training Plan; Suicide Risk Referral Protocol
Target Institutions:
Public School Units (PSUs)
Focus Areas:
Social and Emotional Learning (SEL); School Mental Health (SMH); Crisis Response; Physical Activity Integration
Data Sources Referenced:
FAM-S; YRBS; School Health Services Report; Healthy Active Children Report; PowerSchool; Infinite Campus; Say Something; SHAPE; ECATS; District Report Cards
Year:
2021-2022
Region / City:
Virtual
Topic:
Supply Chain Management, Professional Development
Document Type:
Course Announcement
Organization / Institution:
VA Acquisition Academy (VAAA)
Author:
VA Acquisition Academy
Target Audience:
VA staff, Supply Chain professionals
Period of Validity:
2021-2022
Approval Date:
N/A
Date of Changes:
N/A
Year:
2026
Location:
Hat Yai, Songkhla, Thailand
Event:
Thai Cultural Camp
Organizer:
Prince of Songkla University, Global Affairs and Corporate Communication Center
Document Type:
Application Form
Participants:
University students
Submission Deadline:
Not specified
Required Materials:
Completed form, passport copy, bank transfer slip
Contact Email:
[email protected]
Contact Phone:
+66 74 446824, +66 74 282253
Camp Dates:
July 12–25, 2026
Camp Activities:
Cultural exchange, workshops, local experiences
Form Fields:
Personal information, academic information, T-shirt size, medical/food requirements
Document Language:
English
Application Format:
Digital submission via email
Year:
2017
Region / City:
Canada
Subject:
Occupational Health and Safety, Workplace Safety
Document Type:
Inspection Checklist
Organization:
WorkSafeBC
Author:
WorkSafeBC
Target Audience:
Employers, Qualified Personnel
Effective Period:
N/A
Approval Date:
October 2017
Amendment Date:
N/A
Year:
2022
Region / city:
Not specified
Topic:
Power monitoring, technical specifications
Document type:
Technical specification
Organization:
Open Compute Project (OCP)
Author:
Hamid Keyhani, Dmitriy Shapiro, David Sun
Target audience:
Engineers, technical staff, system integrators
Effective period:
Not specified
Approval date:
08/24/2022
Amendment date:
Not specified
Note:
Year
Year:
2020
Region / City:
United States, Australia, New Zealand, Indonesia, Malaysia, Singapore, Romania, Egypt, Bahrain, Croatia, Greece, Qatar, UAE, Ghana, Saudi Arabia, Nigeria, Turkey, Austria, Benelux, Czech Republic, France, Germany, Hungary, Ireland, Italy, Poland, Russia, Spain, Sweden, Switzerland, UK, South Africa
Topic:
Cooling Solutions, Safety Instructions, Equipment Installation and Maintenance
Document Type:
User Manual
Organization:
Vertiv Group Corp.
Author:
Vertiv Group Corp.
Target Audience:
Qualified personnel for equipment installation and maintenance
Period of validity:
No specific period mentioned
Approval date:
March 18, 2020
Date of changes:
Not specified
Version:
V1.2
Revision date:
Mar 18, 2020
BOM:
31014128
Note:
Copyright by Vertiv Group Corp.
Romania:
800477000
Egypt, Bahrain:
390499717744
Croatia:
800989019
Greece:
80044146622
Qatar:
800100439
UAE:
800035702985
Ghana:
242426263
Saudi Arabia:
8008446628
Nigeria:
7080601125
Non-listed Countries:
49872327750
Turkey:
800448826888
(Austria, Benelux, Czech Republic, France, Germany, Hungary, Ireland, Italy, Poland, Russia, Spain, Sweden, Switzerland, UK, South Africa):
80011554499
Website:
www.vertiv.com
Note:
Year
Topic:
Audio Equipment
Document Type:
Product Specification
Year:
2023
Region / City:
Australia
Topic:
Telecommunications, Power and Rack Deployment
Document Type:
Technical Requirement Document
Organization / Institution:
Telstra
Author:
Telstra Network Infrastructure Team
Target Audience:
Network Technicians, Infrastructure Planners, and Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
1990s
Region / City:
Oakland, California
Theme:
Education, Comics
Document type:
Personal narrative
Author:
Gene Luen Yang
Target audience:
Educators, students, comic enthusiasts
Period of action:
1990s - present
Approval date:
Not specified
Date of changes:
Not specified
Year:
2022
Region / City:
Little Rock Air Force Base
Subject:
Garment Rack Rental Procurement
Document Type:
Sources Sought Notice
Organization:
U.S. Air Force
Author:
Camille Drackette, SSgt Abigail Hebert
Target Audience:
Small Businesses, Government Contractors
Period of Action:
Planning Phase
Approval Date:
Not Provided
Change Date:
Not Provided
Year:
2026
Company:
Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP)
Location:
Nghi Son, Vietnam
Document Type:
Procurement Survey / Questionnaire
Subject:
Supply and Repair of Sea Water Intake Trash Rack
Target Audience:
Potential suppliers of marine equipment and services
Scope:
Replacement and repair of damaged trash rack screens and associated structural works
Deadline for Response:
24 February 2026, 11:59 PM
Service Period:
Before 2026 storm season
Standards Required:
ISO 9001 Series or equivalent certification
Work Environment:
Near-shore and marine conditions
End Goal:
Fully operational and reliable sea water trash rack system
Year:
2019
Region / City:
Not specified
Subject:
Vehicle accessory installation
Document Type:
Installation manual
Manufacturer / Organization:
rAMbOX
Target Audience:
Ram 1500 owners with Crew Cab or Mega Cab
Tools Required:
9/16” end wrench, 9/16” socket & ratchet, 7/32” Allen Key, T-25 Torx driver, 10mm Socket, Carpenter’s Square or measuring tape, 3/16” Allen Key, 3/16” Screw-Retaining Hand Driver
Included Hardware:
Rack bolts, nuts, washers, crossbar bolts, Loctite 242/243 Blue
Installation Steps:
Pre-installation, RamBox removal, rack placement, fastening, final adjustments
Safety Notes:
Anti-seize usage, torque specifications, careful handling of stainless fasteners