№ lp_1_2_46499
File format: docx
Character count: 4883
File size: 72 KB
Year:
2023
Region / City:
New York
Topic:
Bi-Directional EV chargers, UL 1741 SB certification
Document Type:
Waiver
Organization:
Joint Utility
Author:
Not specified
Target Audience:
Electric Vehicle sector stakeholders
Effective Period:
Until July 1, 2024
Approval Date:
January 1, 2023
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
July 19, 2023
Topics:
UL 1741 SB Exception, V2G Inverters, EV Chargers, ESS, Flex IX, DERMS, Utility Coordination
Type of Document:
Meeting Notes
Organization:
ITWG
Attendees:
SI, JU, DPS, CHGE, NGrid, ConEd, NYSERDA
Relevant Standards:
UL 1741 SA and SB
Effective Date for Exception:
July 1, 2024
Implementation Considerations:
Inverter settings, Volt-Var settings, system expansions, feeder-specific charge/discharge windows, pilot projects
Year:
2023
Region / City:
New York
Topic:
Electric Vehicles, Certification
Document Type:
Waiver
Organization:
New York State Joint Utilities
Author:
Joint Utility Position
Target Audience:
Electric Vehicle Sector Stakeholders
Action Period:
Until July 1st, 2024
Approval Date:
September 1st, 2023
Modification Date:
January 1st, 2023
Expiration Date:
July 1st, 2024
Conditions:
Bi-directional EV chargers, UL 1741 certification waiver
Special Considerations:
No microgrid-interface-device required for operation
Implementation Date:
September 1st, 2023
Waiver Expiration Date:
July 1st, 2024
Description:
Document outlines the temporary waiver for bi-directional EV chargers in New York, detailing UL 1741 SB certification requirements and conditions for applications approved before July 1st, 2024.
Year:
2025
Region / City:
United Kingdom
Topic:
Gas transmission and infrastructure
Document Type:
Legal Document
Institution:
Independent Gas Transporter
Author:
Not specified
Target Audience:
Gas transporters, shippers, system operators
Period of Validity:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
California
Topic:
Electric School Bus Bi-Directional Infrastructure
Document Type:
Grant Solicitation
Agency:
California Energy Commission (CEC)
Author:
California Energy Commission (CEC)
Target Audience:
School Districts, Project Applicants
Approval Date:
April 3, 2023
Modification Date:
September 27, 2023
Year:
2013
Region / City:
Not specified
Theme:
Religious Studies, Biblical Analysis
Document Type:
Article
Organization / Institution:
Not specified
Author:
Chong Ho Yu
Target Audience:
Scholars, theologians, students of religious studies
Period of Validity:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
New York
Topic:
Electric Vehicles, Certification
Document Type:
Waiver
Organization:
New York State Joint Utilities
Author:
Joint Utility Position
Target Audience:
Electric Vehicle Sector Stakeholders
Action Period:
Until July 1st, 2024
Approval Date:
September 1st, 2023
Modification Date:
January 1st, 2023
Expiration Date:
July 1st, 2024
Conditions:
Bi-directional EV chargers, UL 1741 certification waiver
Special Considerations:
No microgrid-interface-device required for operation
Implementation Date:
September 1st, 2023
Waiver Expiration Date:
July 1st, 2024
Description:
Document outlines the temporary waiver for bi-directional EV chargers in New York, detailing UL 1741 SB certification requirements and conditions for applications approved before July 1st, 2024.
Year:
2026
Region / City:
Chidambaram, Tamil Nadu, India
Subject:
Photovoltaic energy systems, intelligent control, battery management
Document Type:
Research paper
Institution:
Annamalai University, Department of EEE
Authors:
K. Vinoth Bresnav, Dr. S. Singaravelu
Target Audience:
Electrical engineering researchers and practitioners
Methodology:
ANN-based MPPT, bi-directional DC-DC converter, three-level NPC inverter, PI control
Simulation Environment:
MATLAB/Simulink
Key Components:
Standalone PV system, lithium-ion battery, DC link, three-phase AC load
Applications:
Off-grid renewable energy systems, dynamic load management
Performance Metrics:
MPPT efficiency, battery management effectiveness, AC output stability
Keywords:
ANN, MPPT, PV system, Bi-Directional Converter, NPC Inverter, DC Link, PI Controller
Year:
2018
Region / City:
Canada
Subject:
Electric vehicle charging infrastructure
Document Type:
Technical specification
Organization / Agency:
Department of National Defence (DND)
Standards Referenced:
CSA C22.1-18, CSA C22.2 No. 280-16, CSA C22.2 No. 107.1-16(R2021), NEMA 250-2014
Target Audience:
Contractors, installation personnel, and maintenance staff
Effective Period:
Ongoing until updated
Approval Date:
Not specified
Maintenance Requirements:
Training and on-site support for DND personnel
Warranty:
Minimum 1-year standard, extended up to 5 years covering internal components, connectors, and labor
Power Supply:
Single- or three-phase, voltages according to station specifications
Connectivity:
Wired (ANSI/TIA-568, Cat 6) and wireless (Xbee, ZigBee, cellular)
Access Control:
RFID card system with open protocol, DND vehicles free access
Installation Environment:
Outdoor use, -40°C to +40°C, up to 95% humidity
Housing Requirements:
Metal structure, NEMA 3R or higher, locked or sealed access to internal components
Cables and Connectors:
SAE J1772 for Level 2, SAE J1772 Combo and CHAdeMO for DCFC, minimum 5 m cable length
Anchoring and Bases:
Concrete pads, factory prefabricated or cast-in-place with proper anchoring and reinforcement
Year:
2023
Region / City:
New York
Topic:
Electric Vehicles, Certification
Document Type:
Waiver
Organization:
New York State Joint Utilities
Author:
Joint Utility Position
Target Audience:
Electric Vehicle Sector Stakeholders
Action Period:
Until July 1st, 2024
Approval Date:
September 1st, 2023
Modification Date:
January 1st, 2023
Expiration Date:
July 1st, 2024
Conditions:
Bi-directional EV chargers, UL 1741 certification waiver
Special Considerations:
No microgrid-interface-device required for operation
Implementation Date:
September 1st, 2023
Waiver Expiration Date:
July 1st, 2024
Description:
Document outlines the temporary waiver for bi-directional EV chargers in New York, detailing UL 1741 SB certification requirements and conditions for applications approved before July 1st, 2024.
Year:
2026
Region / City:
International
Subject:
Warranty for electric vehicle charging equipment
Document Type:
Terms and Conditions
Organization:
Heliox
Audience:
Customers purchasing Chargers and Mobile Chargers
Warranty Period:
26 months for Charger Systems or 24 months after SAT, 12 months for Mobile Chargers
Limitations:
Excludes damages from improper use, third-party software, non-approved locations, or exceeding specified charging sessions
Procedure:
Claims must be submitted within 10 days of discovery with proof of purchase and device details
Costs:
Heliox covers replacement parts, transport, and direct labor; other costs borne by Customer
Year:
2026
Region / City:
Pretoria
Subject:
Solar system, electric vehicle chargers
Document Type:
Bid invitation
Organization / Institution:
SSA (South African government agency)
Author:
Not specified
Target Audience:
Potential service providers for solar system installation and maintenance
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified