№ files_lp_4_process_2_47480
File format: docx
Character count: 9394
File size: 40 KB
Comprehensive technical specification for contractors detailing installation, compliance, operational, and maintenance requirements for EVCS infrastructure, including power, connectivity, housing, and safety standards.
Year:
2018
Region / City:
Canada
Subject:
Electric vehicle charging infrastructure
Document Type:
Technical specification
Organization / Agency:
Department of National Defence (DND)
Standards Referenced:
CSA C22.1-18, CSA C22.2 No. 280-16, CSA C22.2 No. 107.1-16(R2021), NEMA 250-2014
Target Audience:
Contractors, installation personnel, and maintenance staff
Effective Period:
Ongoing until updated
Approval Date:
Not specified
Maintenance Requirements:
Training and on-site support for DND personnel
Warranty:
Minimum 1-year standard, extended up to 5 years covering internal components, connectors, and labor
Power Supply:
Single- or three-phase, voltages according to station specifications
Connectivity:
Wired (ANSI/TIA-568, Cat 6) and wireless (Xbee, ZigBee, cellular)
Access Control:
RFID card system with open protocol, DND vehicles free access
Installation Environment:
Outdoor use, -40°C to +40°C, up to 95% humidity
Housing Requirements:
Metal structure, NEMA 3R or higher, locked or sealed access to internal components
Cables and Connectors:
SAE J1772 for Level 2, SAE J1772 Combo and CHAdeMO for DCFC, minimum 5 m cable length
Anchoring and Bases:
Concrete pads, factory prefabricated or cast-in-place with proper anchoring and reinforcement
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
New York
Topic:
Bi-Directional EV chargers, UL 1741 SB certification
Document Type:
Waiver
Organization:
Joint Utility
Author:
Not specified
Target Audience:
Electric Vehicle sector stakeholders
Effective Period:
Until July 1, 2024
Approval Date:
January 1, 2023
Amendment Date:
Not specified
Year:
2023
Region / City:
New York
Topic:
Electric Vehicles, Certification
Document Type:
Waiver
Organization:
New York State Joint Utilities
Author:
Joint Utility Position
Target Audience:
Electric Vehicle Sector Stakeholders
Action Period:
Until July 1st, 2024
Approval Date:
September 1st, 2023
Modification Date:
January 1st, 2023
Expiration Date:
July 1st, 2024
Conditions:
Bi-directional EV chargers, UL 1741 certification waiver
Special Considerations:
No microgrid-interface-device required for operation
Implementation Date:
September 1st, 2023
Waiver Expiration Date:
July 1st, 2024
Description:
Document outlines the temporary waiver for bi-directional EV chargers in New York, detailing UL 1741 SB certification requirements and conditions for applications approved before July 1st, 2024.
Year:
2026
Region / City:
International
Subject:
Warranty for electric vehicle charging equipment
Document Type:
Terms and Conditions
Organization:
Heliox
Audience:
Customers purchasing Chargers and Mobile Chargers
Warranty Period:
26 months for Charger Systems or 24 months after SAT, 12 months for Mobile Chargers
Limitations:
Excludes damages from improper use, third-party software, non-approved locations, or exceeding specified charging sessions
Procedure:
Claims must be submitted within 10 days of discovery with proof of purchase and device details
Costs:
Heliox covers replacement parts, transport, and direct labor; other costs borne by Customer
Year:
2026
Region / City:
Pretoria
Subject:
Solar system, electric vehicle chargers
Document Type:
Bid invitation
Organization / Institution:
SSA (South African government agency)
Author:
Not specified
Target Audience:
Potential service providers for solar system installation and maintenance
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Region / city:
Australia
Theme:
Sewage pumping station design
Document type:
Template
Organization:
Urban Utilities
Author:
Harald Kemmetmuller
Target audience:
Design and engineering teams, project managers
Effective period:
2020-2025
Approval date:
29/06/2020
Revision date:
28/01/2025
Year:
2020
Region / City:
Not specified
Subject:
Medicine Prescription and Administration Record
Document Type:
Medical Record
Institution:
Not specified
Author:
Not specified
Target Audience:
Healthcare professionals, particularly nurses and medical practitioners
Validity Period:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
United States
Topic:
Environmental Monitoring, Air Quality
Document Type:
Standard Operating Procedure
Organization / Institution:
U.S. Environmental Protection Agency
Author:
U.S. Environmental Protection Agency
Target Audience:
Air quality monitoring personnel, laboratory technicians
Period of Application:
Ongoing
Approval Date:
January 2020
Date of Changes:
None
Year:
Not specified
Region / City:
North Karanpura
Theme:
Price breakdown for construction and engineering services
Document Type:
Contract / Tender
Organization:
Not specified
Author:
Not specified
Target Audience:
Contractors and service providers in the construction and engineering field
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Document type:
Liaison Statement
Working Group:
WG FM
Project Team:
FM56
Addressee:
ECC PT1
Sender:
WG FM Chairman
Date:
09 February 2018
Reference:
WGFM#90
Related documents:
SE(18)049, FM(18)059 Annex 021
Frequency bands:
918–925 MHz; 1900–1920 MHz
Radio technologies:
GSM-R; LTE; 5G
Subject area:
Spectrum coexistence and harmonised technical conditions
Requested studies:
BEM conditions; EIRP considerations; coexistence with MFCN
Deployment scenarios:
Macro coverage; local coverage
Deadline for results:
End of 2018
Year:
2019
Region / City:
Melbourne, Australia
Theme:
Environmental audit, Infrastructure development
Document Type:
Environmental audit report
Organization:
Rail Projects Victoria (RPV)
Author:
Aurecon Jacobs Mott MacDonald Joint Venture (AJM JV)
Target Audience:
General public, environmental auditors, project stakeholders
Period of Validity:
2019
Approval Date:
10 February 2022
Date of Changes:
N/A
Year:
YYYY
Region / city:
Europe
Topic:
Satellite communication, frequency bands, NGSO FSS systems
Document Type:
ECC Decision
Organization:
European Conference of Postal and Telecommunications Administrations (CEPT)
Author:
N/A
Target audience:
Telecommunications administrators, regulatory bodies, satellite operators
Period of validity:
N/A
Approval date:
DD MM YYYY
Date of amendments:
N/A
Year:
2014
Region / City:
North Hampton, MA
Topic:
Installation of fire alarm pull stations
Document Type:
Solicitation/Contract/Order
Organization / Institution:
Department of Veterans Affairs
Author:
Freida McClain
Target Audience:
Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Hucknall, Nottinghamshire
Topic:
Election of District Councillors
Document Type:
Election Notice
Organization:
Ashfield District Council
Author:
Ashfield District Council
Target Audience:
Voters in Hucknall North
Period of Validity:
4 May 2023
Approval Date:
4 May 2023
Year:
2026
Region / City:
Global
Theme:
Energy efficiency, Compressed air systems
Document Type:
Product Information
Organization / Institution:
Kaeser Kompressoren
Author:
Kaeser Kompressoren
Target Audience:
Companies using compressed air systems
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Queensland, Australia
Topic:
Environmental compliance, sewage treatment, pumping stations
Document type:
Checklist
Organization / institution:
Unitywater
Author:
Not specified
Target audience:
Developers installing Sewage Pumping Stations within Unitywater’s sewerage network
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Year
Region / city:
USA/Caribbean, Europe/Africa/Middle East, Asia/Pacific
Topic:
GMDSS Equipment Testing, DSC Frequencies
Document Type:
Technical guide
Target Audience:
Maritime professionals, ship operators, GMDSS radio operators
Context:
Technical guide on GMDSS equipment testing procedures and station locations for DSC testing.
Year:
2023
Region / City:
United Kingdom
Topic:
Military Airfields, Royal Air Force
Document Type:
Research Guide
Organization:
RAF Museum
Author:
RAF Museum
Target Audience:
Researchers, Historians
Period of Validity:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Heysham
Topic:
Nuclear Regulatory Inspection
Document Type:
Site Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector - Heysham 1
Target Audience:
General public, Heysham Local Community Liaison Committee (LCLC)
Period of Action:
01 October – 31 December 2024
Approval Date:
February 2025
Date of Last Update:
Not specified