№ lp_1_2_22078
File format: docx
Character count: 41613
File size: 132 KB
This document presents various proposals and revisions for integrating AI technologies into the architecture of 6G networks, specifically focusing on AI agents, distributed AI, and federated learning within the 6G network.
Year:
2025
Region / city:
Wuhan, China
Topic:
AI for 6G architecture
Document Type:
Meeting Contribution
Organization:
Huawei, China Mobile, HiSilicon, Vivo, Oppo, Boost Mobile Network, NEC, Futurewei, Deutsche Telekom, Oracle
Author:
Huawei, China Mobile, HiSilicon, Vivo, Oppo, Boost Mobile Network, NEC, Futurewei, Deutsche Telekom, Oracle
Target Audience:
Telecom industry professionals, AI researchers, 6G developers
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Dallas, USA
Topic:
6G Network for AI
Document Type:
Technical Contribution
Organization / Institution:
3GPP TSG SA WG2
Author:
China Mobile, AT&T, KPN, Boost Mobile Network, China Unicom, Rakuten, TNO, CATT, ZTE, OPPO, vivo, CATT, Tencent, Intel, NEC, TCL, Tejas Network Limited, Transsion Holdings, CAICT, China Telecom, Samsung, LG Electronics, ETRI, Apple, Huawei, Hisilicon, NTT DOCMO, Interdigital, Nokia, Xiaomi, Lenovo, Philips International B.V.
Target Audience:
Industry Professionals, Telecommunications Engineers
Period of Validity:
17 – 21 November 2025
Approval Date:
TBD
Date of Changes:
Revision of S2-2509792
Year:
2025
Region / City:
Goteborg, SE
Subject:
6G System Architecture
Document Type:
Meeting Agenda
Organization / Institution:
SA WG2
Author:
Not specified
Target Audience:
SA2 Working Group members and contributors
Period of Validity:
Aug 2025
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2025
Region / city:
Wuhan, China
Theme:
3GPP Working Group agenda and discussions
Document type:
Meeting agenda
Organization / institution:
3GPP
Author:
RAN2 Chair (InterDigital)
Target audience:
Delegates of 3GPP Working Group
Period of validity:
Apr. 7th – 11th, 2025
Approval date:
Not specified
Date of changes:
Not specified
Year:
2022
Region / City:
Wuhan, China and Geneva, Switzerland
Theme:
Wetlands conservation, Youth involvement
Document Type:
Draft resolution
Organization / Institution:
Ramsar Convention
Author:
Australia, Costa Rica
Target Audience:
Contracting Parties to the Ramsar Convention
Period of validity:
Not specified
Approval Date:
Not specified
Amendments Date:
Not specified
Year:
2025
Location:
Wuhan, China
Topic:
AI/ML-assisted Positioning Data Collection
Document Type:
Meeting Report / Technical Summary
Organization:
3GPP TSG-RAN WG3
Author:
CATT (moderator)
Intended Audience:
3GPP Working Group Members
Agenda Item:
20.2
Case Studies Covered:
Case 3a and Case 3b
Referenced Documents:
R3-251509, R3-251510, R3-251617, R3-251618, R3-251692, R3-251719, R3-251770, R3-251800, R3-251801, R3-251867, R3-251868, R3-251953, R3-251957, R3-252001, R3-252018, R3-252027, R3-252306, R3-252420, R3-252427
Key Technologies:
LMF, gNB, NRPPa, NGAP, AI/ML Positioning, TS 38.305, TS 38.455, TS 38.473
Meeting Outcome:
Agreements on data collection procedures, signaling flows, and recommendations for proactive and opportunistic collection methods
Year:
2010
Date:
June 11, 2010
Loan Number:
7864-CN
Project Title:
Wuhan Second Urban Transport Project
Type of Document:
Project Agreement
Parties:
International Bank for Reconstruction and Development and Wuhan Municipality
Related Agreement:
Loan Agreement between the People’s Republic of China and the International Bank for Reconstruction and Development dated June 11, 2010
Borrower:
People’s Republic of China
Project Implementing Entity:
Wuhan Municipality
Location of Signature:
Beijing, People’s Republic of China
Signatories:
Klaus Rohland; Lei Dechao
Financial Institution:
International Bank for Reconstruction and Development
Project Components:
Road corridors, transfer terminals and interchanges, road section construction and rehabilitation, public transport facilities
Institutional Arrangements:
Project Leading Group; Wuhan Project Management Office (WPMO); Wuhan Urban Construction Fund Management Office (WUCFMO)
Compliance Requirements:
General Conditions; Anti-Corruption Guidelines; Resettlement Action Plan (RAP); Environmental Management Plan (EMP)
Implementation Period:
Fiscal Year 2010 and subsequent annual work plans
Addresses:
1818 H Street, N.W., Washington, D.C., United States of America; 40 Chang Qing Road, Wuhan, Hubei Province, People’s Republic of China
Year:
2025
Location:
Wuhan, China
Organization:
3GPP TSG-RAN WG4
Document type:
Meeting report / Technical summary
Subject:
Ambient IoT (A-IoT) in NR Rel-19
Agenda item:
7.24.5
Source:
Moderator (Huawei)
Contributors:
Huawei, HiSilicon, Xiaomi, CMCC, CATT, Qualcomm, Spreadtrum, UNISOC, vivo, OPPO, ZTE Corporation, Sanechips, Ericsson, LG Electronics UK
Target audience:
Technical experts and stakeholders in 5G and Ambient IoT
Period covered:
RAN4 meetings #106–#114bis
Key topics:
RF requirements for A-IoT base stations and carrier waves, transmitter power, modulation quality, occupied bandwidth
Reference documents:
R4-2500687, R4-2502859, RP-243326, RP-250796
Institution:
Wuhan Institute of Virology, Chinese Academy of Sciences
Department:
Graduate Student Department
Document Type:
Agreement
Subject:
Overseas visit of postgraduate students for study, international cooperation, academic conference, or research visit
Parties:
Graduate Student Department of Wuhan Institute of Virology (Party A) and Postgraduate Student (Party B)
Purpose:
Regulation of conditions for overseas research visit by postgraduate students
Country of Visit:
To be specified
Receiving Organization:
To be specified
Visit Period:
From ___ to ___ (d/m/y)
Responsible Advisor:
Research advisor of the postgraduate student
Financial Conditions:
Living, visit, travel, insurance expenses borne by Party B or receiving organization
Legal Compliance:
Laws of the destination country, regulations of the receiving organization, and Chinese regulations on overseas students
Reporting Requirements:
Monthly progress reports to research advisor and communication with Party A
Embassy Registration:
Reporting to the Chinese embassy or consulate within one month of arrival
Completion Requirement:
Return to WIV for graduation oral defense and submission of work conclusion within three months after return
Year:
2025
Location:
Wuhan, China
Organization:
3GPP TSG RAN WG2
Authors:
Xiaomi, Ericsson, ZTE, T-mobile, CMCC
Document type:
Technical meeting report
Agenda Item:
8.1.x
Deadline for Phase 1 comments:
March 11, 2025, 10:00 UTC
Deadline for Phase 2 comments:
March 21, 2025, 10:00 UTC
Intended outcome:
Identify options for OTA and non-OTA model transfer
Discussion areas:
A1: Model size, A2: Transfer continuity, A3: Network controllability, A4: QoS and priority, A5: Model visibility
Candidate solutions:
Options 1–5 for model transfer/delivery
Contributors contact information:
Listed per company in document
Year:
2017
Region / City:
N/A
Topic:
Healthcare Integration
Document Type:
Technical Specification
Organization / Institution:
athenahealth, Inc.
Author:
N/A
Target Audience:
Healthcare Providers, IT Managers, Project Managers
Effective Period:
N/A
Approval Date:
N/A
Date of Amendments:
N/A
Year:
2025
Region / City:
Geneva
Topic:
Vehicle Regulations, Driver Assistance Systems
Document Type:
Proposal
Organization:
United Nations Economic Commission for Europe
Author:
Task Force on Advanced Driver Assistance System
Target Audience:
Type Approval Authorities, Vehicle Manufacturers
Period of Validity:
Ongoing
Approval Date:
9 April 2025
Date of Changes:
N/A
Year:
2025
Organization:
United Nations Economic Commission for Europe (ECE)
Committee:
Inland Transport Committee, World Forum for Harmonization of Vehicle Regulations (WP.29/GRVA)
Document type:
Proposal / Regulatory amendment
Language:
English
Location:
Geneva, Switzerland
Session:
Twenty-first session
Dates of session:
20–24 January 2025
Topic:
Advanced Driver Assistance Systems (ADAS), Driver Control Assistance Systems (DCAS)
Submitted by:
Task Force on Advanced Driver Assistance System (ADAS) experts
Reference:
ECE/TRANS/WP.29/GRVA/2025/xx
Year:
2024
Region / city:
United Nations
Theme:
Driver Control Assistance Systems (DCAS)
Document type:
Guidance Document
Organization / institution:
United Nations Economic Commission for Europe (UNECE)
Author:
TF on ADAS Chair
Target audience:
Type Approval Authorities
Effective period:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2022
Region / city:
United States
Topic:
Medical imaging, VIX system
Document type:
Technical guide
Organization / institution:
Department of Veterans Affairs, Office of Information and Technology (OIT)
Author:
VA IT VistA Imaging Technical team
Target audience:
IT professionals in the Department of Veterans Affairs
Period of validity:
November 2022 onwards
Approval date:
November 2022
Revision date:
November 2022
Year:
2014
Region / city:
International
Subject:
MedDRA terminology
Document Type:
Guide
Organization / Institution:
ICH (International Council for Harmonisation)
Author:
Working Group of ICH Steering Committee
Target Audience:
MedDRA users
Period of validity:
Since September 2014
Approval Date:
1 September 2014
Date of Changes:
September 2014
Contextual description:
Guide detailing changes and updates in MedDRA Term Selection for users, including updates for congenital and acquired conditions, medication errors, and examples based on MedDRA version 17.1.
Year:
2025
Date of issuance:
8 April 2025
Session:
Twenty-second session
Meeting date:
24 June 2025
Location:
Geneva
Agenda item:
6(a) Advanced Driver Assistance Systems: Driver Control Assistance Systems
Document symbol:
ECE/TRANS/WP.29/GRVA/2025/29
Distribution:
General
Original language:
English
Organization:
United Nations Economic Commission for Europe
Governing body:
Inland Transport Committee, World Forum for Harmonization of Vehicle Regulations (WP.29)
Working party:
Working Party on Automated/Autonomous and Connected Vehicles (GRVA)
Submitting body:
Task Force on Advanced Driver Assistance System
Related regulation:
UN Regulation No. 171
Subject:
Use of the secure internet database “DETA” for exchange of information on DCAS-related incidents between Type Approval Authorities
Legal framework:
1958 Agreement
Related documents:
ECE/TRANS/WP.29/2024/37; ECE/TRANS/WP.29/2024/146; ECE/TRANS/WP.29/2025/7; DETA-52-03-Rev.3; ECE/TRANS/WP.29/2022/61
Type of document:
Proposal and guidance document
Year:
2022
Date:
October 11, 2022
Series:
What the Hell Is Going On? Podcast
Episode Number:
171
Topic:
Nuclear escalation risks in the Russia–Ukraine war and U.S. political discourse
Type of Document:
Podcast transcript
Organization:
American Enterprise Institute
Hosts:
Danielle Pletka; Marc Thiessen
Guest:
Frederick Kagan
Country Focus:
United States; Russia; Ukraine
Key Figures Discussed:
Joe Biden; Vladimir Putin
Political Context:
U.S. domestic politics and the war in Ukraine
Format:
Recorded discussion transcript