№ lp_2_2_01546
File format: docx
Character count: 17970
File size: 40 KB
This document outlines specifications for the installation, furnishing, and connection of exterior lighting fixtures, poles, and supports in accordance with applicable electrical and lighting standards.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Not specified
Subject:
Insulation Materials, Construction Specifications
Document Type:
Specification Guide
Organization / Institution:
Owens Corning
Author:
Owens Corning
Target Audience:
Construction professionals, architects, engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Aurora, Colorado
Topic:
Exterior property improvements
Document Type:
Guidelines
Organ / Institution:
Residential Improvement Guideline Committee
Author:
N/A
Target Audience:
Homeowners in the Inspiration Metropolitan District
Effective Period:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2023
Region / City:
Global
Theme:
Exterior Paint Warranty
Document Type:
Warranty Terms
Organization:
Asian Paints LTD
Author:
Asian Paints
Target Audience:
Homeowners, Painters, Contractors
Validity Period:
3 years (Ace & Ace Advanced), 1 year (Ace Advanced for anti-algae)
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
Not specified
Theme:
Construction, Painting
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, architects
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Section Number:
079513.16
Standard:
CSI MasterFormat
Revision Date:
10/23
Discipline:
Division 07 – Thermal and Moisture Protection
Related Sections:
077129 Manufactured Roof Expansion Joints; 079100 Preformed Joint Seals; 079513.13 Interior Expansion Joint Cover Assemblies; 079513.19 Parking Deck Expansion Joint Cover Assemblies; 09 91 00 Field Painting
Manufacturer:
Nystrom
Manufacturer Address:
9300 73rd Avenue N, Minneapolis, MN 55428
Manufacturer Phone:
(800) 547-2635
Products Referenced:
Nystrom Model EJN-RJX; EJN-RJXw; EJN-EWN; EJN-EWNw; EJN-SES; SER
Material:
Aluminum; Silicone bellows with foam sealant; Santoprene
Finish:
Clear anodized; Mill
Performance Standards:
ASCE/SEI 7; UL 2079; ASTM E 1966
Application:
Exterior vertical expansion joint covers; wall and ceiling systems
Movement Types:
Thermal; Wind sway; Seismic
Document Type:
Technical specification
DS939OUTSULATION® PLUS MD SYSTEMAn Exterior Wall Insulation and Finish System with Moisture Drainage
Year:
2026
Region / City:
N/A
Theme:
Insulation Systems
Document Type:
Guide Specification
Organization / Institution:
Dryvit Systems, Inc.
Author:
Dryvit Systems, Inc.
Target Audience:
Design and construction professionals
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
North America
Topic:
Construction Materials, Exterior Systems
Document Type:
Guide Specification
Organization / Institution:
United Gilsonite Laboratories
Author:
United Gilsonite Laboratories
Target Audience:
Specifiers, Contractors, Construction Professionals
Effective Period:
Ongoing
Approval Date:
2023-09-24
Modification Date:
Not provided
Year:
2015
Region / City:
Grandview, MO
Topic:
Sun control devices
Document Type:
Product specification
Organization:
Ruskin Company
Author:
Ruskin Company
Target Audience:
Specifiers, Architects
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2026
Region / City:
General
Theme:
Exterior Lighting Systems
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, Engineers
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
Context description:
A technical specification for the installation, materials, and maintenance requirements of exterior and garage lighting systems, including poles, fixtures, and associated hardware.
Year:
2021
Region / City:
West Warwick, RI
Topic:
Exterior Insulation and Finish Systems (EIFS)
Organization:
Dryvit Systems, Inc.
Author:
Dryvit Systems, Inc.
Target Audience:
Design and construction professionals
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Related Standards:
ASTM B 117, ASTM C 67, ASTM C 150, ASTM C 297, ASTM C 510, ASTM C 518, ASTM C 639, ASTM C 661
Construction Phases:
Design, Specification, Installation
Safety Warning:
Adherence to specification necessary to prevent water intrusion
Contextual Description:
This document provides detailed manufacturer’s guidelines and specifications for installing the Outsulation MD System, an exterior insulation and finish system with moisture drainage, intended for use by design and construction professionals.
Year:
2026
Location:
Long Melford, Suffolk, UK
Subject:
Residential property exterior cladding
Document Type:
Planning statement
Authority:
Local planning authority
Applicant:
Private homeowner
Property Type:
Two-storey end-terrace dwelling
Planning Reference:
DC/21/05517, DC/21/00056
Proposed Material:
Hardie plank fibre cement board
Scope:
Full exterior boarding and thermal insulation improvement
Conservation Status:
Not in a designated conservation area
Note:
Year
Year:
2026
Region / City:
United States
Subject:
Exterior insulation and finish system design and installation
Document Type:
Technical specification
Organization / Institution:
Sika Corporation US, Senergy® Brand
Author:
Sika Technical Department
Target Audience:
Architects, engineers, specifiers, and contractors
Design Responsibility:
Specifier and purchaser
Installation Requirements:
Substrate preparation, moisture control, impact resistance, color selection, system joints, grade condition, projecting features
Applicable Standards:
ASTM C1325, ASTM C1177, ASTM C79, ASTM C1396, ASTM C1382
Period of Validity:
Ongoing until updated
Date of Issue:
2026
Year:
2018
Region / City:
Greater London
Topic:
Environmental noise pollution
Document Type:
Research Supplementary Figure
Institution:
Not specified
Author:
Not specified
Target Audience:
Researchers, Environmental Scientists
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Ohio, USA
Topic:
Pedestrian Access Control Equipment
Document Type:
Product Specifications
Organization:
Controlled Access, Inc.
Author:
Controlled Access, Inc.
Target Audience:
Architects, Security Professionals, Engineers, Facility Managers
Effective Period:
N/A
Approval Date:
N/A
Revision Date:
N/A
Application:
Interior & Exterior
Product Type:
Full-Height Turnstiles
Year:
2021
Department:
625
Unit:
3300
Location:
06
Activity:
4260
Function:
fd52
Sub function:
008
Program:
8842201d
Fund:
12fo
Contact:
Keri Ross
File format:
.dgn, .pdf, .xls
Document type:
Design guide
Lighting type:
Conventional, High mast
Approval required:
Traffic Engineering
Service:
Electric, Underground, Overhead
Software:
Microstation, ProjectWise, ORD
Procedure:
Design, Field visit, Utilities check
Tools:
AGI32
Project name format:
Item Number + Road Name + Year
References:
Geometrical layout, utilities plan, roadway sheets
Issuing authority:
County of Alameda
Department:
General Services Agency
RFQ number:
902534
Subject:
Electrical and Lighting Supplies
Document type:
Bidders Conference Attendees List
Event type:
Networking/Bidders Conference
Event date:
October 23, 2024
Program referenced:
Small Local Emerging Business (SLEB) Program
Distribution method:
Electronic issuance via email and website posting
Conference participation:
No participants
Year:
2021
Region / City:
Ethiopia
Theme:
Energy, Electrification, Rural Development
Document Type:
Stakeholder Engagement Plan
Organization / Institution:
Ethiopian Electric Utility
Author:
Ethiopian Electric Utility
Target Audience:
Stakeholders in the energy sector, local communities, government, and private sector partners
Period of Validity:
January 2021 – ongoing
Approval Date:
January 2021
Date of Changes:
Not specified
Document type:
Construction specification section
Division:
Division 26 Electrical; Division 23 HVAC; Division 01 General Requirements
Subject:
Commissioning of electrical, lighting, lighting controls, HVAC, and related systems
Applicable standards and codes:
NETA; NEMA; ASTM; IEEE; ANSI; NESC; CBC; CEC; CalGreen; CHPS; IPCEA; OSHA; NIST; NFPA; ANSI/NFPA 70B; NFPA 70E; ANSI/NFPA 101
Geographic applicability:
California
Project phase:
Construction and system commissioning
Involved parties:
Owner; Contractor; Commissioning Services Provider; Engineer of Record; Architect
Referenced plans:
Construction Documents; Commissioning Plan (CxP)
Scope of work:
Installation verification; start-up; testing; pre-functional and functional performance testing; documentation
Systems covered:
Electrical lighting systems; lighting controls; HVAC line voltage components; environmental controls interfaces; photovoltaic systems
Submittal requirements:
Manufacturer data; checklists; testing reports; warranty information
Quality control requirements:
Owner quality control specifications; manufacturer commissioning procedures
Source type:
Technical specification for building systems
Note:
Year
Region / City:
Dublin
Topic:
Public Lighting Documentation
Document Type:
Guidelines
Organization:
Dublin City Council
Target Audience:
Contractors, Public Lighting Service Providers