№ lp_1_2_18975
File format: docx
Character count: 2679
File size: 21 KB
A set of guidelines for homeowners in the Inspiration Metropolitan District to follow when seeking approval for exterior property improvements such as landscaping, fencing, decks, and lighting.
Year:
2023
Region / City:
Aurora, Colorado
Topic:
Exterior property improvements
Document Type:
Guidelines
Organ / Institution:
Residential Improvement Guideline Committee
Author:
N/A
Target Audience:
Homeowners in the Inspiration Metropolitan District
Effective Period:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Not specified
Subject:
Insulation Materials, Construction Specifications
Document Type:
Specification Guide
Organization / Institution:
Owens Corning
Author:
Owens Corning
Target Audience:
Construction professionals, architects, engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Global
Theme:
Exterior Paint Warranty
Document Type:
Warranty Terms
Organization:
Asian Paints LTD
Author:
Asian Paints
Target Audience:
Homeowners, Painters, Contractors
Validity Period:
3 years (Ace & Ace Advanced), 1 year (Ace Advanced for anti-algae)
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
Not specified
Theme:
Construction, Painting
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, architects
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Section Number:
079513.16
Standard:
CSI MasterFormat
Revision Date:
10/23
Discipline:
Division 07 – Thermal and Moisture Protection
Related Sections:
077129 Manufactured Roof Expansion Joints; 079100 Preformed Joint Seals; 079513.13 Interior Expansion Joint Cover Assemblies; 079513.19 Parking Deck Expansion Joint Cover Assemblies; 09 91 00 Field Painting
Manufacturer:
Nystrom
Manufacturer Address:
9300 73rd Avenue N, Minneapolis, MN 55428
Manufacturer Phone:
(800) 547-2635
Products Referenced:
Nystrom Model EJN-RJX; EJN-RJXw; EJN-EWN; EJN-EWNw; EJN-SES; SER
Material:
Aluminum; Silicone bellows with foam sealant; Santoprene
Finish:
Clear anodized; Mill
Performance Standards:
ASCE/SEI 7; UL 2079; ASTM E 1966
Application:
Exterior vertical expansion joint covers; wall and ceiling systems
Movement Types:
Thermal; Wind sway; Seismic
Document Type:
Technical specification
DS939OUTSULATION® PLUS MD SYSTEMAn Exterior Wall Insulation and Finish System with Moisture Drainage
Year:
2026
Region / City:
N/A
Theme:
Insulation Systems
Document Type:
Guide Specification
Organization / Institution:
Dryvit Systems, Inc.
Author:
Dryvit Systems, Inc.
Target Audience:
Design and construction professionals
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
North America
Topic:
Construction Materials, Exterior Systems
Document Type:
Guide Specification
Organization / Institution:
United Gilsonite Laboratories
Author:
United Gilsonite Laboratories
Target Audience:
Specifiers, Contractors, Construction Professionals
Effective Period:
Ongoing
Approval Date:
2023-09-24
Modification Date:
Not provided
Year:
2015
Region / City:
Grandview, MO
Topic:
Sun control devices
Document Type:
Product specification
Organization:
Ruskin Company
Author:
Ruskin Company
Target Audience:
Specifiers, Architects
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2026
Region / City:
General
Theme:
Exterior Lighting Systems
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, Engineers
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
Context description:
A technical specification for the installation, materials, and maintenance requirements of exterior and garage lighting systems, including poles, fixtures, and associated hardware.
Year:
2021
Region / City:
West Warwick, RI
Topic:
Exterior Insulation and Finish Systems (EIFS)
Organization:
Dryvit Systems, Inc.
Author:
Dryvit Systems, Inc.
Target Audience:
Design and construction professionals
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Related Standards:
ASTM B 117, ASTM C 67, ASTM C 150, ASTM C 297, ASTM C 510, ASTM C 518, ASTM C 639, ASTM C 661
Construction Phases:
Design, Specification, Installation
Safety Warning:
Adherence to specification necessary to prevent water intrusion
Contextual Description:
This document provides detailed manufacturer’s guidelines and specifications for installing the Outsulation MD System, an exterior insulation and finish system with moisture drainage, intended for use by design and construction professionals.
Year:
2026
Location:
Long Melford, Suffolk, UK
Subject:
Residential property exterior cladding
Document Type:
Planning statement
Authority:
Local planning authority
Applicant:
Private homeowner
Property Type:
Two-storey end-terrace dwelling
Planning Reference:
DC/21/05517, DC/21/00056
Proposed Material:
Hardie plank fibre cement board
Scope:
Full exterior boarding and thermal insulation improvement
Conservation Status:
Not in a designated conservation area
Note:
Year
Year:
2026
Region / City:
United States
Subject:
Exterior insulation and finish system design and installation
Document Type:
Technical specification
Organization / Institution:
Sika Corporation US, Senergy® Brand
Author:
Sika Technical Department
Target Audience:
Architects, engineers, specifiers, and contractors
Design Responsibility:
Specifier and purchaser
Installation Requirements:
Substrate preparation, moisture control, impact resistance, color selection, system joints, grade condition, projecting features
Applicable Standards:
ASTM C1325, ASTM C1177, ASTM C79, ASTM C1396, ASTM C1382
Period of Validity:
Ongoing until updated
Date of Issue:
2026
Year:
2018
Region / City:
Greater London
Topic:
Environmental noise pollution
Document Type:
Research Supplementary Figure
Institution:
Not specified
Author:
Not specified
Target Audience:
Researchers, Environmental Scientists
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Ohio, USA
Topic:
Pedestrian Access Control Equipment
Document Type:
Product Specifications
Organization:
Controlled Access, Inc.
Author:
Controlled Access, Inc.
Target Audience:
Architects, Security Professionals, Engineers, Facility Managers
Effective Period:
N/A
Approval Date:
N/A
Revision Date:
N/A
Application:
Interior & Exterior
Product Type:
Full-Height Turnstiles
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Year:
2016
Region / City:
Sheffield
Topic:
Healthcare, Autism and Neurodevelopmental Services
Document Type:
Procurement Invitation
Authority:
NHS Sheffield Clinical Commissioning Group
Target Audience:
Potential Service Providers
Period of Validity:
2 years (with potential 12-month extension)
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2018
Period:
1 April 2018 to 30 March 2022 with option to extend once until 31 March 2024
Date of Review:
30 October 2021
Commissioner Lead:
Merton and Wandsworth CCGs
Provider Lead:
Subject to Any Qualified Provider Selection (AQP) Process
Population Needs:
National context and evidence base
Service Scope:
Diagnostic tests and clinical decision-making
Geographical Areas:
NHS Merton CCG, NHS Wandsworth CCG
NHS Merton CCG Population:
226,532
NHS Wandsworth CCG Population:
390,786
Total Population:
617,318
Local Context:
South West London Sustainability & Transformation Plan
Service Delivery Area:
London Borough of Merton and Wandsworth
Provider Participation:
Standardised referral form for MRI and Non Obstetric Ultrasound Scan
Framework:
AQP Direct Access Diagnostic Framework
AQP Framework Prices:
Public sector austerity considerations
Contract Review:
Year 3 of contract for price adjustments
Service Improvement:
Annual commissioner and provider diagnostic services forum, biannual audit programme
Outcomes:
NHS Outcomes Framework Domains & Indicators (Domain 1 to Domain 5)
Links to South West London Sustainability Transformation Programme:
Improved care standards, diagnostics, and financial sustainability
Year:
2026
Region / city:
Singapore
Subject:
Legal agreement, Securities, Investment
Document type:
Legal Agreement, Financial Instrument
Institution:
Company incorporated in Singapore
Author:
[Company Name]
Target audience:
Investors, Legal professionals, Financial institutions
Effective period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
Not specified
Region / City:
Not specified
Subject:
Software Licensing Agreement
Document Type:
Legal Agreement
Organization / Institution:
Schrödinger, L.L.C.
Author:
Schrödinger, L.L.C.
Target Audience:
Licensee, Users
Effective Period:
3 years
Approval Date:
Not specified
Amendment Date:
Not specified
License Type:
Not specified