№ files_lp_4_process_1_36609
File format: docx
Character count: 6312
File size: 20 KB
Letter presenting a detailed referral arguing that the proposed Edgar Dam strengthening will have significant environmental impacts on threatened species, ecological communities, and the integrity of the Tasmanian Wilderness World Heritage Area, urging full assessment.
Year:
2026
Region / City:
Tasmania, Australia
Subject:
Environmental impact, dam strengthening, World Heritage Area
Document Type:
Referral letter / Environmental assessment submission
Organization / Institution:
Independent environmental review / concerned stakeholders
Author:
Unspecified (addressed to Minister Plibersek)
Target Audience:
Government authorities, environmental regulators
Relevant Period:
Ongoing project assessment
Date Submitted:
2026
Project Reference:
ENTURA23902C
Key Environmental Concerns:
Threatened species, ecological communities, natural and wilderness values, World Heritage Area integrity
Impacted Infrastructure:
Edgar Dam, Scotts Peak Dam, worker camp sites, access roads
Species Mentioned:
Tasmanian devil, eastern quoll, spotted-tailed quoll, white-bellied sea-eagle, Tasmanian masked owl, White-throated needletail, swamp galaxias, Ouse River caddisfly, Tyenna River freshwater snail, Chiloglottis valida orchid
Mitigation and Consultation Issues:
Incomplete assessment of alternatives, inadequate flora and fauna surveys, insufficient community and Aboriginal consultation, untested roadkill mitigation
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2007
Authors:
S. J. Lee, T. C. Reeves
Source:
Educational Technology, 47(6), 56
Subject:
Educational technology, audiovisual learning, instructional design
Type:
Scholarly article / book chapter
Focus:
Edgar Dale, Cone of Experience, learning through media
Publisher:
Educational Technology Publications
Influences:
John Dewey, Pestalozzi, Froebel, Bruner
Related concepts:
Enactive, iconic, symbolic learning; audiovisual methods in teaching
Year:
1917
Region / City:
Waikerie, South Australia
Subject:
Military history, World War I
Document Type:
Memorial
Organization:
Australian War Memorial, Waikerie RSL Sub-branch
Author:
Not specified
Target Audience:
General public, descendants of soldiers, historians
Period of Validity:
1917 onwards
Approval Date:
1917
Modification Date:
Not applicable
Contextual Description:
A memorial document honoring Edgar Reginald Packer, an Australian soldier killed during World War I, commemorating his life, service, and the places where he is remembered.
Organization:
Followers of IESO
Website:
www.ieso.co.za
Author:
Edgar Phillips
Document type:
FAQ commentary
Religious tradition:
Followers of IESO’s Ekklesia
Subject:
Meaning of the title “Master” (kurios) in the Prophetic Scriptures (New Testament)
Referenced texts:
Romans 10:9–10; Ioanne 4:11
Key terms:
IESO; Aleim; IEUE; kurios
Copyright:
©2020 Followers of IESO
Nonprofit status:
Followers of IESO is a nonprofit organization
Year:
1809-1849
Region / city:
Virginia, USA
Theme:
Literature, American History, War, Performance Adaptations
Document type:
Biography, Literary Analysis
Organization / institution:
N/A
Author:
Lauren McNeel
Target audience:
Students, scholars, literature enthusiasts
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2018
Region / City:
Not specified
Theme:
Theatre, Drama, Comedy
Document Type:
Script
Organization / Institution:
Scripts for Stage
Author:
Edgar Allan Poe (original work), Peter Nuttall (adaptation)
Target Audience:
Theatre performers, directors, and enthusiasts
Period of Action:
Contemporary
Approval Date:
Not specified
Revision Date:
Not specified
Year:
1845
Author:
Edgar Allan Poe
Genre:
Poem
Language:
English
Type of document:
Literary text
Target audience:
General readership
Original publication:
The Evening Mirror, January 29, 1845
Themes:
Grief, loss, supernatural, melancholy
Setting:
Midnight, speaker’s chamber
Characters:
Narrator, Lenore, Raven
Literary devices:
Alliteration, assonance, internal rhyme, personification, repetition, refrain
Document type:
Personal letter
Genre:
Personal correspondence
Language:
English
Sender:
Unnamed writer
Recipient:
Marilyn M. Matroniss
Recipient address:
1198 Lansdowne Road, Coquitlam, BC V3B 7Y8
Place mentioned:
Coquitlam, British Columbia, Canada
Literary reference:
Edgar Allan Poe’s “The Raven”
Timeframe mentioned:
Until Thanksgiving
Form:
Written message with postal address format
Context of communication:
Apology and request for reconciliation after a conflict
Year:
1843
Author:
Edgar Allan Poe
Genre:
Short story
Literary period:
American Romanticism
Audience:
General readership
Themes:
Guilt, paranoia, psychological horror
Type of source:
Literary text extract
Setting:
Unspecified domestic interior
Narrative perspective:
First-person
Note:
Date
Context:
This document is a record related to the preparation, review, and approval process for an institutional policy or administrative matter.
Year:
1843–1845
Author:
Edgar Allan Poe
Type of document:
Literary analysis
Genre:
Gothic fiction
Themes:
Symbolism, guilt, fear, loss, evil
Works discussed:
The Tell-Tale Heart, The Raven
Symbols analyzed:
Heartbeat, eye, Raven, Lenore
Target audience:
Students, literary scholars
Publication context:
Early American Gothic literature
Note:
Year
Jurisdiction:
California
Subject:
Dam safety and emergency action planning
Document type:
Regulatory guidance
Governing legislation:
Senate Bill 92 (Statutes of 2017)
Responsible authority:
California Governor’s Office of Emergency Services
Participating agencies:
Department of Water Resources, Division of Safety of Dams; Federal Energy Regulatory Commission
Affected entities:
Owners of state-regulated dams
Key document referenced:
Emergency Action Plan
Hazard classifications:
Low, Significant, High, Extremely High
Update requirement:
At least every ten years or upon significant change
Submission deadlines:
January 1, 2018; January 1, 2019; January 1, 2021
Submission recipients:
California Governor’s Office of Emergency Services; Division of Safety of Dams
Review period:
60 days from receipt of approved inundation map
Statutory references:
California Water Code Sections 6160 and 6161; Government Code Section 8589.5
Source type:
Government informational guidance outlining statutory obligations, procedural requirements, hazard classifications, submission timelines, and review processes for Emergency Action Plans for state-regulated dams in California.
Note:
Year
Topic:
Dam Safety, Operations and Maintenance
Document Type:
Template
Agency/Institution:
Dam Safety Office
Target Audience:
Dam owners, engineers, safety officers
Year:
2024
Region / City:
Southern Africa
Topic:
Infrastructure Rehabilitation, Dam Safety
Document Type:
Report
Organization / Institution:
African Development Bank (AfDB), European Union (EU), World Bank (WB), Swedish Embassy
Author:
Unknown
Target Audience:
Stakeholders in dam rehabilitation projects, financial and technical experts
Period of Validity:
Until December 2026 (extension requested)
Approval Date:
October 28, 2024
Date of Changes:
October 2024
Date:
Expires: (two years from original or revision date)
Note:
Går
Year:
20__
Region / City:
Maryland
Subject:
Dam Safety, Waterway Construction, Environmental Regulation
Document Type:
Legal Agreement
Organization / Institution:
Maryland Department of the Environment
Author:
Maryland Department of the Environment
Target Audience:
Property owners, legal representatives, and entities involved in dam or reservoir construction
Validity Period:
As per permit issuance or renewal
Approval Date:
________
Date of Changes:
As per amendments to permit terms
Year:
2025
Region / City:
Ontario
Topic:
Dams, Geospatial Data
Document Type:
User Guide
Organization:
Ministry of Natural Resources
Author:
Geospatial Ontario
Target Audience:
Users of Ontario Dam Inventory (ODI)
Effective Period:
From June 14, 2012
Approval Date:
2025-09-17
Revision Date:
Not provided
Note:
Year
Organization / Institution:
Maryland Department of the Environment
Context:
A form detailing requirements for obtaining a dam safety permit or small pond approval from the Maryland Department of the Environment, including project information, hazard classification, structural specifications, and required documentation.
Year:
2007
Region / city:
British Columbia
Topic:
Dam Safety, Flood Inundation, Consequence Classification
Document Type:
Guideline
Institution:
Ministry of Forests, Lands and Natural Resource Operations
Author:
Unknown
Target Audience:
Dam safety officers, engineers, dam owners
Period of validity:
Not specified
Approval Date:
Not specified
Date of amendments:
Not specified