№ lp_2_3_47506
File format: docx
Character count: 50152
File size: 123 KB
This document provides detailed specifications for rehabilitating existing storm water pipes or culverts using various pipe liner systems listed in the NCDOT APL.
Year:
2025
Region / City:
Not specified
Theme:
Pipe rehabilitation
Document Type:
Special provision
Agency / Institution:
NCDOT
Author:
Not specified
Target Audience:
Contractors, engineers
Effective Period:
From 11-2-22 to 1-21-25
Approval Date:
Not specified
Amendment Date:
9-19-25
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2017
Region / City:
Baghdad
Topic:
Water Infrastructure, Environmental Assessment
Document Type:
Environmental and Social Impact Assessment Report
Organization / Institution:
Baghdad Water Authority
Author:
N/A
Target Audience:
Stakeholders involved in water infrastructure projects, environmental agencies
Duration:
Project Phase
Approval Date:
N/A
Modification Date:
N/A
Year:
2023
Region / City:
Global
Topic:
HVAC Systems, Heat Pumps
Document Type:
Technical Guide
Organization / Institution:
LG
Author:
LG
Target Audience:
HVAC professionals, engineers
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2000
Region / City:
N/A
Topic:
Pipe manufacturing and testing specifications
Document Type:
Technical specification
Organization:
Underground Solutions, Inc.
Author:
N/A
Target Audience:
Contractors, pipe manufacturers, fusion technicians
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Note:
Contextual Description
Year:
2024
Note:
Region / City
Theme:
Engineering, Construction
Document Type:
Construction Specification
Description:
This document provides detailed guidelines for the installation and testing of ductile iron pipes and fittings in construction projects, focusing on materials, pipe laying, jointing, pressure testing, and backfilling procedures.
Year:
2023
Region / City:
China
Topic:
Prestressed Concrete Cylinder Pipe, Monitoring, Reinforcement
Document Type:
Research Paper
Author:
Not specified
Target Audience:
Researchers, Engineers, Industry Professionals
Period of Action:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Contextual Description
Section:
22 05 29 (implied)
Part:
1 – General; 2 – Products; 3 – Execution
Work Included:
Pipe and Equipment Hangers, Supports, Anchors, Sleeves, Seals, Flashing
Related Sections:
22 05 10 Basic Plumbing Requirements; 22 00 19 Plumbing Piping Insulation; 22 10 00 Plumbing Piping; 23 11 23 Facility Natural-Gas Piping; 22 30 10 Plumbing Equipment; 23 21 00 Hydronic Piping; 23 23 00 Refrigerant Piping and Specialties
Document Type:
Technical construction specification
Discipline:
Mechanical / Plumbing
Specified Manufacturers:
B-Line Systems; Grinnell; F and S Central; Other as approved by Architect/Engineer (A/E)
Submittals:
Shop drawings for pipe supports
Materials:
Carbon steel; galvanized steel; cast iron; copper plated steel; stainless steel (316); polyester resin; vinyl ester resin; fiberglass; glass reinforced polyurethane; sheet lead; butyl flashing; silicone sealant
Standards Referenced:
UL Listed fire rated sleeves
Application:
Commercial or institutional building construction
Scope:
Requirements for fabrication, materials, installation, spacing, and support of piping systems including hydronic, plumbing, natural gas, and refrigerant piping
Year:
2025
Region/City:
Kernersville
Subject:
CCTV inspection and cleaning services for the Municipal Separate Storm Sewer System (MS4)
Document Type:
Invitation to Bid
Agency:
Town of Kernersville
Author:
Not specified
Target Audience:
Contractors, service providers
Period of Validity:
1 year, with an option to extend for 3 years
Approval Date:
Not specified
Amendment Date:
Not specified
Date:
August 26, 2009
To:
Laboratory Group A
From:
Tony Butterfield
Title:
Engineering Training Supervisor
Subject:
Double Pipe Heat Exchanger
Organization:
Laboratory Group A
Document Type:
Internal Memorandum
Equipment:
Double Pipe Heat Exchanger
Reference Data Year:
1996
Meeting Deadline:
On or before Wednesday, September 9th, 2009
Technical Focus:
Heat transfer capacity, overall heat transfer coefficient, convection coefficients, fouling assessment
Operating Conditions:
Various steam pressures and cold side flow rates
Assumptions:
Perfect insulation, fully developed flow, constant cold-side heat capacity, steam condensation with latent heat method
Requested Analysis:
Comparison of steam-side and cold-side heat transfer rates; determination of overall and theoretical heat transfer resistances; evaluation of scale buildup
Year:
2017
Region / City:
Mackay
Theme:
Construction, Civil Engineering
Document Type:
Inspection and Testing Plan (ITP)
Agency / Organization:
Mackay Regional Council
Author:
Not specified
Target Audience:
Contractors, Engineers, Inspectors
Effective Period:
Not specified
Approval Date:
Not specified
Date of Modifications:
Not specified
Note:
Year
Note:
Year
Topic:
Structural analysis of buried pipes
Document Type:
Input Data
Organization / Institution:
Amiblu Holding GmbH
Target Audience:
Engineers, construction professionals
Year:
2026
Region / City:
Stoystown, PA, USA
Subject:
Fire suppression water storage systems
Document Type:
Product guide specification
Organization / Institution:
Highland Tank & Mfg. Co., Inc.
Author:
Highland Tank & Mfg. Co., Inc. Engineering Department
Target Audience:
Architects, Engineers, Contractors
Standards Referenced:
CSI MasterFormat 2014, AASHTO, AISC, ANSI, ASME, ASTM, AWS, AWWA, IBC, NEC, NEMA, NFPA, NSF, OSHA, PEI, SSPC, STI, UL
Model:
02000HGSWHDFPTBDCSI64
Application:
Underground water storage for fire suppression
Construction Requirements:
Bottom drain pipe, anti-vortex plate, single-wall steel, NSF/ANSI Standard 61 compliance
Submittals Required:
Shop drawings, product data, structural calculations, manufacturer certification, warranty documentation
Manufacturing Location:
United States of America
Installer Qualifications:
Minimum 5 years experience in installation of similar tanks
Year:
2026
Region / City:
United States, Utah
Subject:
Electric heating cables for pipe tracing and roof/gutter de-icing
Document Type:
Technical specification
Organization / Institution:
Warmzone
Author:
Warmzone Engineering Department
Target Audience:
Electrical contractors, HVAC and plumbing engineers
Effective Period:
Construction project duration
Approval Date:
Not specified
Revision Date:
Not specified
Standards Compliance:
NFPA 70, UL, IEEE 515, CSA, ETL
Section:
00 00 00
Document Type:
Technical Specification
Material:
Polyvinyl Chloride (PVC) Pipe and Fittings
Application:
Storm Sewer, Sanitary Sewer, Nonpressure Sewer Service
Pipe Diameter Range:
3-inch to 60-inch
Standards Referenced:
ASTM D1784, ASTM D2321, ASTM D3034, ASTM D3212, ASTM F477, ASTM F1336, ASTM F1417, ASTM F3058, UNI-B-6, UNI-PUB-6, UNI-PUB-12, UNI-PUB-20
Industry Organization:
Uni-Bell PVC Pipe Association
Installation Standards:
ASTM D2321, UNI-PUB-6
Joint Type:
Gasketed Push-On
Pipe Color:
Green or White
Deflection Limit:
7.5% Maximum Long-Term
Testing Method:
Low-Pressure Air Testing
Scope of Work:
Supply and Installation of PVC Pipe and Fittings
Related Sections:
Trenching, Backfilling, Compaction, Submittals
Year:
2026
Region / City:
United States
Subject:
Inpatient Rehabilitation Facility (IRF) Prospective Payment System (PPS) & Quality Reporting Program (QRP)
Document Type:
Supporting Statement
Agency:
Centers for Medicare & Medicaid Services (CMS)
Author:
U.S. Department of Health and Human Services
Target Audience:
Healthcare professionals, policymakers, and administrators in rehabilitation facilities
Effective Date:
October 1, 2026
Date of Approval:
Not specified
Date of Revision:
March 29, 2024
Expiration Date:
Not specified
Year:
2019
Region / City:
Gandhinagar, India
Conference:
13th Meeting of the Conference of the Parties (COP13)
Agenda Item:
26.1
Type of Document:
Report / Draft Revision
Prepared by:
Secretariat of the Convention on Migratory Species (CMS)
Subject:
Illegal Killing, Taking and Trade of Migratory Birds
Geographical Focus:
Mediterranean, East Asian-Australasian Flyway, South and Central America, Caribbean
Task Forces:
MIKT (Mediterranean), ITTEA (East Asian-Australasian Flyway)
Related Resolutions:
Resolution 11.16 (Rev.COP12)
Decisions Covered:
12.26–12.30
Date of Original:
10 October 2019
Meeting Dates:
17–22 February 2020
Observers:
Multilateral Environmental Agreements, NGOs, BirdLife International
Year:
2016–2023
Region / State:
New Jersey
Subject Area:
English Language Arts
Education Level:
K–12
Document Type:
Standards crosswalk
Issuing Body:
New Jersey Department of Education
Purpose:
Comparison of revisions between standards versions
Content Scope:
Foundational Skills and Reading Language
Revision Focus:
Technical revisions and indicator text changes
Source Type:
Official education standards reference
Year:
2023
Region / City:
[not specified]
Topic:
Public Procurement
Document Type:
Template
Organization / Institution:
[not specified]
Author:
[not specified]
Target Audience:
Public bodies involved in procurement processes
Validity Period:
[not specified]
Approval Date:
[not specified]
Date of Changes:
2023
Context:
A document providing revisions to the standard Request for Proposal (RFP) template, ensuring alignment with updated procurement regulations and introducing several modifications to the RFP process.
Program:
Home and Community-based Services (HCS)
Document type:
Billing requirements
Governing body:
Health and Human Services Commission
Jurisdiction:
Texas
Legal basis:
40 TAC §9.170
Provider obligations:
Service claim preparation and submission
Effective dates:
January 1, 2023; March 1, 2023; November 15, 2019; September 1, 2021
Revision identifiers:
Revision 19-1; Revision 21-3; Revision 23-1; Revision 23-2
Service components covered:
Professional therapies, residential assistance, respite, nursing, employment services, adaptive aids, home modifications, dental treatment, transition assistance
Compliance oversight:
Provider Fiscal Compliance Reviews
Appendices included:
Provider Fiscal Compliance Review Protocol, forms, revisions, contact information