№ lp_2_1_19311
File format: docx
Character count: 6658
File size: 700 KB
Year:
2022
Location:
Watford FC Training Ground, Bell Lane, London Colney, AL2 1BZ
Theme:
Strength and Conditioning, Football
Document Type:
Job Profile
Organization:
Watford FC Community Sports & Education Trust
Author:
N/A
Target Audience:
Coaches, Sports Professionals, Job Applicants
Effective Date:
November 2022
Review Date:
November 2023
Salary:
Dependent on qualifications
Job Type:
Sessional Staff
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Awarding organisation:
City & Guilds
Qualification level:
Level 3
End-point assessment standard:
Refrigeration, Air Conditioning and Heat Pump Engineering Technician
Standard reference:
ST0322
Qualification number:
6090-51
Document type:
End-point assessment recording forms
Intended users:
Providers, employers, EPA customers, apprentices
Assessment tasks covered:
Retrofit and retrofill; fault finding and system repair
Version:
V1.2
Previous version:
V1.1
Date last modified:
January 2025
Usage status:
For external use
Associated document:
EPA Pack for Providers and Employers
Year:
Not specified
Region / City:
Waikato
Topic:
Mechanical Ventilation, Air Conditioning Systems, Compliance Schedule
Document Type:
Building Consent Application Form
Organization / Institution:
Waikato City Council
Author:
Not specified
Target Audience:
Property owners, contractors, building consent applicants
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2021
Organization:
Military Sealift Command
Document Type:
Combined Synopsis/Solicitation
Solicitation Number:
N3220521Q2197
NAICS Code:
336611
PSC/FSC Code:
2090
Location:
Norfolk Naval Station, Pier 12; MSC BATS Warehouse, San Diego, CA
Period of Performance:
TBD
Delivery Date:
01 March 2021
Equipment/Services:
Inspection, testing, repair, and operational verification of AC, domestic, cargo refrigeration plants, and refrigerated container box
Requirements:
COVID-19 negative test, PPE, safe transportation for technicians
Contract Type:
Firm-fixed price purchase order
Small Business Set-Aside:
Applicable
Document type:
Affirmation letter
Program:
Registered Strength and Conditioning Coach (RSCC)
Organization:
National Strength and Conditioning Association
Purpose:
Verification of full-time strength and conditioning employment and experience
Employment status:
Full-time
Professional role:
Strength and conditioning coach
Applicable sectors:
Professional sports, collegiate sports, high school sports, tactical training units
Credential references:
CSCS, CSCCA, ASCA, UKSCA
Required attachments:
Statement of work, updated resume, formal job description
Signatories:
Candidate, supervisor or program administrator
Verification criteria:
Program definition of full-time status
Contact information required:
Yes
Year:
2025
Region / City:
Ugu District, KwaZulu-Natal, South Africa
Type of document:
Tender / Bid Invitation
Contract Number:
UGU-07-1694-2025
Organization:
Ugu District Municipality
Target audience:
Service providers in water treatment and chemical supply
Bid closing date:
13 June 2025
Bid opening time:
12H00
Contract duration:
36 months
Evaluation criteria:
Functionality, Price, Specific Goals
Contact person:
Sanele Tenza
Email:
[email protected]
Note:
Year
Topic:
Air Conditioning
Document Type:
Product Specification
Year:
2019/2020
Note:
Program Outcomes
Outcome #1:
Demonstrate safe work practices
Outcome #2:
Identify different types of air conditioning and their functions
Outcome #3:
Perform basic maintenance of an air conditioning system
Outcome #4:
Perform basic troubleshooting of an air conditioning system
Outcome #5:
Demonstrate the ability to properly recover, vacuum and charge an air conditioning system
Year of report:
2019/2020
Region / city:
Not specified
Theme:
Mobile Air Conditioning Program
Document type:
Assessment Report
Institution:
Not specified
Author:
Joseph Jensen
Target audience:
Faculty, VPAA, Deans
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2026
Region / City:
International
Topic:
Marathon training, endurance running
Document type:
Training plan
Organization / Institution:
GH Training
Author:
GH Training team
Target audience:
First-time and intermediate marathon runners
Training period:
7 weeks
Date of publication:
2026-02-26
Exercise focus:
Running, conditioning, cross-training
Intensity guidance:
Rate of perceived exertion (RPE) scale
Supplementary resources:
GH Training video library
Year:
2026
Region / City:
UK
Topic:
Sports Education, Teaching Role
Document Type:
Job Specification
Institution:
Myerscough College and University Centre
Author:
Myerscough College
Target Audience:
Applicants for Practical Skills Tutor role in Rugby Coaching and Strength & Conditioning
Period of Activity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
Melbourne, Australia
Topic:
Strength and Conditioning Education
Document Type:
Research Study Information Sheet
Organisation:
La Trobe University, Sport and Exercise Science
Authors:
Dr Lachlan James, Dr Charlie Davids, Professor Paul Gastin, Assoc. Professor Matt Driller, Dr Minh Huynh, Mr Maris Lidums
Funding:
In-kind support by La Trobe University
Target Audience:
Performance staff and recruiters in professional, semi-professional, elite, sub-elite, or school sport
Data Retention Period:
5 years
Ethics Reference Number:
HEC21371
Year:
2025
Country:
United Kingdom
City:
London
Region / Borough:
Lambeth
Address:
458–460 Brixton Road, SW9 8EA
Document type:
Heritage Statement
Planning application type:
Full planning application
Applicant / Organization:
Tesco Stores Ltd
Property type:
Ground floor retail unit
Previous use of premises:
Costa coffee shop
Proposed use:
Tesco Express convenience store
Planning designation:
Brixton Conservation Area
Flood zone classification:
Flood Zone 1
Planning reference (Certificate of Lawfulness):
24/03207/LDCP
Certificate approval date:
9 December 2024
Supporting assessment:
Noise Impact Assessment by Noise Solutions Ltd
Noise assessment date:
21 October 2025
Planning policy references:
Lambeth Local Plan 2020–2035 (2021); Brixton Conservation Area Statement (2012); National Planning Policy Framework (2024)
Proposed development elements:
2 roof-level air conditioning units and 2 wall-mounted air conditioning units
Fiscal Year:
FY2025
State:
Georgia
Program:
Sources of Strength Program (STR)
Department:
Georgia Department of Human Services
Division:
Division of Family and Children Services
Section:
Prevention and Community Support Section
Document Type:
Grant application cover form
Applicant Type:
Non-Profit or Public Entity
Purpose:
Submission of applicant and project information for funding consideration
Project Scope:
New, continuation, expansion, or modified projects
Legal Framework:
Compliance with applicable federal and state laws and regulations
Required Identifiers:
FEI, DUNS, SAM Unique Entity ID
Authorization:
Applicant authorized signatures required
Funding Request:
Project amount requested
Source Type:
Government administrative form for funding applications
Year:
2013, 2019
Region / City:
United States
Topic:
Signal Strength, Installation Standards, Communication Systems
Document Type:
Standard
Organization / Institution:
National Fire Protection Association (NFPA)
Author:
National Fire Protection Association (NFPA)
Target Audience:
Engineers, designers, and professionals in the field of fire alarm systems and communication enhancements
Period of Validity:
Ongoing
Approval Date:
Not specified
Amendments Date:
Not specified
Year:
2023
Region / City:
N/A
Theme:
Construction, Concrete, Bridge Decks
Document Type:
Special Provision
Agency / Institution:
N/A
Author:
N/A
Target Audience:
Contractors, Engineers
Effective Period:
N/A
Approval Date:
N/A
Revision Date:
N/A
Year:
2022
Region / City:
Not specified
Theme:
Concrete Overlay, Bridge Deck Repair
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
Not specified
Subject:
Education, School Programs
Document Type:
Assurance Form
Agency / Organization:
Department of Human Services, Division of Family and Children Services
Author:
Not specified
Target Audience:
School representatives, administrators
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified