№ files_lp_4_process_2_63468
File format: docx
Character count: 2553
File size: 38 KB
Year:
2025
Region / City:
Florida
Topic:
Stormwater Infrastructure, Highway System Maintenance
Document Type:
Official Report
Organization / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation (FDOT)
Target Audience:
Government agencies, transportation planners, public infrastructure professionals
Period of Action:
Fiscal Years 2026/27 - 2030/31
Approval Date:
N/A
Date of Amendments:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2000
Region / City:
Florida
Topic:
Portland Cement Concrete Specifications
Document Type:
Technical Specification
Organization / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation (FDOT)
Target Audience:
Contractors, Engineers, Construction Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Date
Year:
2013
Region / City:
Florida
Topic:
Road Construction
Document Type:
Specification
Author:
Florida Department of Transportation
Target Audience:
Contractors, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2024
Region / City:
Florida, USA
Type of Document:
Construction Specification / Regulatory Guidance
Governing Body:
Florida Department of Transportation (FDOT)
Reference:
Applicant Handbook Vol. I, Section 11.2; NPDES CGP 62-621.300(4), F.A.C.
Scope:
Erosion and Sediment Control Plans for construction sites exceeding 1 acre
Related Manuals:
FDOT Construction Project Administration Manual (CPAM) Section 8.2
Audience:
Contractors performing FDOT projects
Project Requirements:
Site-specific Erosion and Sediment Control (E&SC) Plan, compliance with water quality standards, adherence to BMPs
Note:
Year
Year:
2013
Region / City:
Florida
Topic:
Excavation, Foundation Construction, Trench Safety
Document Type:
Technical Specification
Organ / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation
Target Audience:
Contractors, Engineers, Construction Professionals
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Subject:
Traffic Engineering / Signal Systems
Document Type:
Compliance Matrix
Organization / Institution:
Florida Department of Transportation (FDOT)
Target Audience:
Manufacturers of traffic signal systems
Description:
A compliance matrix for evaluating signal priority and preemption systems based on FDOT specifications for use in Florida.
Year:
2026
Region / City:
Florida, USA
Subject:
Traffic engineering equipment compliance
Document Type:
Compliance matrix
Organization:
Florida Department of Transportation (FDOT)
Author:
FDOT Traffic Engineering Research Laboratory
Intended Audience:
Equipment manufacturers and applicants for road use approval
Applicable Standards:
FDOT Standard Specifications Sections 684 and 996, CFR Section 200.216, IEEE 802 networking standards
Document Scope:
Managed Field Ethernet Switch (MFES) technical and regulatory compliance
Date:
2026-03-12
Revision Status:
Initial submission
Test Methods:
Physical inspection, document review, functional inspection, TERL test cases
Organization:
Florida Department of Transportation (FDOT)
Laboratory:
Traffic Engineering Research Laboratory (TERL)
Document Type:
Compliance Matrix
Subject:
Automated Flagger Assistance Device (AFAD) Requirements
Related Standard:
FDOT Standard Specifications for Road and Bridge Construction, Section 990
Referenced Standard:
Manual on Uniform Traffic Control Devices (MUTCD)
Applicable MUTCD Sections:
6L.03.02, 6L.03.03, 6L.03.04, 6D.02.07, 6D.02.08, 6D.02.09, 4S.01.03, 6L.04.02, 6L.04.04
Jurisdiction:
Florida, United States
Intended Users:
AFAD manufacturers and applicants submitting products for evaluation
Purpose:
Determination of product compliance and acceptability for use on Florida roads
Evaluation Methods:
Document Review, Physical Inspection, Functional Inspection, Compliance Matrix Review
Required Applicant Information:
Applicant Name, Manufacturer, Item Model Number, Signature, Date
Product Category:
Work Zone Traffic Control Devices
Regulatory Context:
Road and Bridge Construction Standards Compliance
Year:
2014
Organization:
Florida Department of Transportation (FDOT)
Document Type:
Technical Requirements Document
Target Audience:
FDOT Developers and Vendors
Technology Stack:
C# 4.0, JavaScript, MVC 3.0+, ASP.Net Webforms 4.0+, .NET Framework Libraries
Database Systems:
Oracle, IBM DB2, Microsoft SQL Server
Testing Environments:
Unit Test, System Test, Production
Enterprise Library Versions:
FEL 2, FEL 3, FEL 4
Infrastructure Requirements:
Windows Server 2012 w/ IIS 8
Publication Process:
Unit Test, System Test, Production
Optional Components:
Helper Functions, Business Day Calculations, Logging
Approved Libraries:
Ninject, Automapper, Glimpse, Moq, Open XML SDK, iText#, Muhimbi PDF Converter Services, Log4Net, Newtonsoft JSON.Net, Sharp Serializer
CSS Frameworks:
960 Grid, Bootstrap
jQuery:
Allowed with source and license review
Source Control:
Subversion Repository
Code Standards:
Microsoft C# Coding Conventions, FDOT Coding Standards, .NET Framework Guidelines
Note:
Year
Type of Document:
Transmittal / Project Record
Included Forms and Certifications:
Schedule of Values, Fuel Adjustment Certifications, Load Rating Calculations, Asphalt LOT Submittal Packages, Bituminous Certifications, MOT Certifications, Buy America Certifications, SAs & Work Orders, Shop Drawings, As-Built Drawings, Final CPPR Document, Pay Item Summary & Certification, Overruns and Underruns, Earthwork Survey Waiver, Final Acceptance of Traffic Signal Installation, Pending Agreements, Inspection Reports, Composite Pay Factor Summary, Adjustment Summaries, Warranty Bonds
Year:
Not specified
Region / City:
India
Topic:
Angiogenic factors, Pregnancy complications, Fetal death
Document Type:
Research Data / Supplementary Table
Organization:
Not specified
Author:
Not specified
Target Audience:
Researchers, Medical professionals
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
Year:
2023
Region / City:
Novosibirsk, Moscow
Topic:
Transcription factor binding sites, ChIP-seq, plant genomes
Document type:
Research article
Organization / Institution:
Novosibirsk State University, Institute of Cytology and Genetics, Siberian Branch of the Russian Academy of Sciences, Moscow Witte Financial University, Financial Academy under the Government of the Russian Federation, Moscow State Technical University of Civil Aviation, Agrarian and Technological Institute, Peoples’ Friendship University of Russia, I.M. Sechenov First Moscow State Medical University
Author:
A.I. Dergilev, N.G. Orlova, O.B. Dobrovolskaya, Y.L. Orlov
Target audience:
Researchers, bioinformaticians, molecular biologists
Period of validity:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2024
Region / City:
New York City
Theme:
Public Finance
Document Type:
Financial Projection
Organization:
New York City Office of the Comptroller
Author:
New York City Office of the Comptroller
Target Audience:
Financial Analysts, City Budget Planners, Policymakers
Effective Period:
July 1, 2024 – July 1, 2027
Approval Date:
Not provided
Amendment Date:
Not provided
Year:
2023
Region / City:
Atlanta, Georgia
Topic:
Public Reporting Burden Estimation
Document Type:
Information Collection Request
Organization / Institution:
CDC
Author:
Centers for Disease Control and Prevention
Target Audience:
Government agencies, researchers, public health professionals
Effective Period:
Until February 28, 2026
Approval Date:
Not specified
Amendment Date:
Not specified
Authors:
Sam Sprik; Dani Murphy; Taichi Kuroki; Danny Terlip; Josh Eichman; Michael Penev; Jennifer Kurtz
Organization:
National Renewable Energy Laboratory
Document type:
Technical report
Subject area:
Hydrogen fueling infrastructure
Model name:
Hydrogen Station Capacity Evaluation (HySCapE)
Purpose:
Estimation of hydrogen station capacity
Simulation time step:
One second
Fueling standard referenced:
CSA HGV 4.9
Assumed vehicle storage pressure:
70 MPa
Assumed ambient temperature:
20 °C
Assumed fueling demand profile:
“Friday” profile from Hydrogen Delivery Infrastructure Options Analysis
Publication period:
circa 2018
Software environment:
Compiled MATLAB executable
Year:
2025
Region / city:
Australia
Subject:
Clinical guidelines, Anti-epileptic drugs, Epilepsy treatment
Document type:
Report
Organization:
Pharmaceutical Benefits Advisory Committee (PBAC)
Author:
Not specified
Target audience:
Healthcare professionals, policymakers, pharmaceutical industry stakeholders
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
April 2025
Note:
Year
Year:
2024
Region / City:
Global
Theme:
Actuarial Practice, IFRS
Document Type:
Educational Document
Organization:
International Actuarial Association (IAA)
Author:
International Actuarial Association
Target Audience:
Actuaries, financial practitioners
Period of Validity:
N/A
Approval Date:
May 2024
Amendment Date:
N/A
Scope:
Measurement of Investment and Service Contracts under IFRS
Contact Information:
+1-613-236-0886, [email protected]
Website:
www.actuaries.org
Note:
Year
Contextual description:
A document detailing instructions for reviewing various aspects of PS&E and RTL for compliance with environmental requirements and project specifications.