№ files_lp_4_process_1_33909
File format: docx
Character count: 18160
File size: 97 KB
Structured source listing MFES technical requirements, regulatory conformance, and evaluation methods for equipment approval on Florida roads.
Year:
2026
Region / City:
Florida, USA
Subject:
Traffic engineering equipment compliance
Document Type:
Compliance matrix
Organization:
Florida Department of Transportation (FDOT)
Author:
FDOT Traffic Engineering Research Laboratory
Intended Audience:
Equipment manufacturers and applicants for road use approval
Applicable Standards:
FDOT Standard Specifications Sections 684 and 996, CFR Section 200.216, IEEE 802 networking standards
Document Scope:
Managed Field Ethernet Switch (MFES) technical and regulatory compliance
Date:
2026-03-12
Revision Status:
Initial submission
Test Methods:
Physical inspection, document review, functional inspection, TERL test cases
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2000
Region / City:
Florida
Topic:
Portland Cement Concrete Specifications
Document Type:
Technical Specification
Organization / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation (FDOT)
Target Audience:
Contractors, Engineers, Construction Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Date
Year:
2013
Region / City:
Florida
Topic:
Road Construction
Document Type:
Specification
Author:
Florida Department of Transportation
Target Audience:
Contractors, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2024
Region / City:
Florida, USA
Type of Document:
Construction Specification / Regulatory Guidance
Governing Body:
Florida Department of Transportation (FDOT)
Reference:
Applicant Handbook Vol. I, Section 11.2; NPDES CGP 62-621.300(4), F.A.C.
Scope:
Erosion and Sediment Control Plans for construction sites exceeding 1 acre
Related Manuals:
FDOT Construction Project Administration Manual (CPAM) Section 8.2
Audience:
Contractors performing FDOT projects
Project Requirements:
Site-specific Erosion and Sediment Control (E&SC) Plan, compliance with water quality standards, adherence to BMPs
Note:
Year
Year:
2013
Region / City:
Florida
Topic:
Excavation, Foundation Construction, Trench Safety
Document Type:
Technical Specification
Organ / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation
Target Audience:
Contractors, Engineers, Construction Professionals
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Subject:
Traffic Engineering / Signal Systems
Document Type:
Compliance Matrix
Organization / Institution:
Florida Department of Transportation (FDOT)
Target Audience:
Manufacturers of traffic signal systems
Description:
A compliance matrix for evaluating signal priority and preemption systems based on FDOT specifications for use in Florida.
Organization:
Florida Department of Transportation (FDOT)
Laboratory:
Traffic Engineering Research Laboratory (TERL)
Document Type:
Compliance Matrix
Subject:
Automated Flagger Assistance Device (AFAD) Requirements
Related Standard:
FDOT Standard Specifications for Road and Bridge Construction, Section 990
Referenced Standard:
Manual on Uniform Traffic Control Devices (MUTCD)
Applicable MUTCD Sections:
6L.03.02, 6L.03.03, 6L.03.04, 6D.02.07, 6D.02.08, 6D.02.09, 4S.01.03, 6L.04.02, 6L.04.04
Jurisdiction:
Florida, United States
Intended Users:
AFAD manufacturers and applicants submitting products for evaluation
Purpose:
Determination of product compliance and acceptability for use on Florida roads
Evaluation Methods:
Document Review, Physical Inspection, Functional Inspection, Compliance Matrix Review
Required Applicant Information:
Applicant Name, Manufacturer, Item Model Number, Signature, Date
Product Category:
Work Zone Traffic Control Devices
Regulatory Context:
Road and Bridge Construction Standards Compliance
Year:
2025
Region / City:
Florida
Topic:
Stormwater Infrastructure, Highway System Maintenance
Document Type:
Official Report
Organization / Institution:
Florida Department of Transportation (FDOT)
Author:
Florida Department of Transportation (FDOT)
Target Audience:
Government agencies, transportation planners, public infrastructure professionals
Period of Action:
Fiscal Years 2026/27 - 2030/31
Approval Date:
N/A
Date of Amendments:
N/A
Year:
2014
Organization:
Florida Department of Transportation (FDOT)
Document Type:
Technical Requirements Document
Target Audience:
FDOT Developers and Vendors
Technology Stack:
C# 4.0, JavaScript, MVC 3.0+, ASP.Net Webforms 4.0+, .NET Framework Libraries
Database Systems:
Oracle, IBM DB2, Microsoft SQL Server
Testing Environments:
Unit Test, System Test, Production
Enterprise Library Versions:
FEL 2, FEL 3, FEL 4
Infrastructure Requirements:
Windows Server 2012 w/ IIS 8
Publication Process:
Unit Test, System Test, Production
Optional Components:
Helper Functions, Business Day Calculations, Logging
Approved Libraries:
Ninject, Automapper, Glimpse, Moq, Open XML SDK, iText#, Muhimbi PDF Converter Services, Log4Net, Newtonsoft JSON.Net, Sharp Serializer
CSS Frameworks:
960 Grid, Bootstrap
jQuery:
Allowed with source and license review
Source Control:
Subversion Repository
Code Standards:
Microsoft C# Coding Conventions, FDOT Coding Standards, .NET Framework Guidelines
Note:
Year
Topic:
Industrial Ethernet Switch
Document Type:
Technical Specification
Organization / Institution:
DYMEC
Target Audience:
Engineers, Industrial Network Designers
Year:
2026
Region / city:
Washington
Subject:
Procurement of Ethernet Wireline or Fixed Wireless Services
Document Type:
Request for Quotation (RFQ)
Organization / Institution:
Washington Technology Solutions (WaTech)
Author:
Not specified
Target Audience:
Contractors specializing in network services
Period of validity:
Until the award of contract
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / city:
Hangzhou, P.R. China
Topic:
Electronic Safety and Security
Document Type:
Product Guide Specification
Organization / Institution:
Construction Specifications Institute
Author:
ZHEJIANG DAHUA VISION TECHNOLOGY CO., LTD.
Target Audience:
Architects, Engineers, Manufacturers
Validity Period:
Indefinite
Approval Date:
2016
Amendment Date:
None
Year:
2023
Region / City:
N/A
Topic:
Industrial Ethernet Switches
Document Type:
Procurement Specification
Organization:
Rockwell Automation
Author:
N/A
Target Audience:
Engineers, Procurement Specialists
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2016
Region / City:
Hangzhou, China
Topic:
Electronic Safety and Security, Network Video Recorders, Ethernet Switch
Document Type:
Product Guide Specification
Organization / Institution:
Zhejiang Dahua Vision Technology Co., Ltd.
Author:
Zhejiang Dahua Vision Technology Co., Ltd.
Target Audience:
Architects, Engineers, Installers, Manufacturers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Year
Region / City:
Texas, Austin
Subject:
Telecommunications
Document Type:
Order Form
Organization:
Texas Department of Information Resources - Telecommunications Division
Author:
Texas Department of Information Resources
Target Audience:
Agencies
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2009-2012
Region / City:
Geneva
Document type:
Liaison Statement
Organization:
ITU-T Study Group 15
Author:
Ghani Abbas, Ericsson UK
Intended recipients:
IEEE 802.1, Metro Ethernet Forum, Broadband Forum
Approval date:
11 June 2010
Deadline:
30 September 2010
Study period:
2009-2012
Question number:
9/15
Title:
Lab - Use Wireshark to Examine Ethernet II Frames
Subject:
Networking
Topic:
Ethernet II Frame Analysis
Focus Protocols:
Ethernet II, ARP, ICMP, IPv4
Software:
Wireshark
Operating System:
Windows
Required Equipment:
PC with internet access and Wireshark installed
Network Environment:
LAN
IP Address (Example Host):
192.168.1.147
Default Gateway (Example):
192.168.1.1
Frame Type Values:
0x0800 (IPv4), 0x0806 (ARP)
Document Type:
Educational Lab Exercise
Structure:
Objectives, Background / Scenario, Required Resources, Instructions, Questions
Year:
2021
Region / City:
Global
Topic:
Industrial Ethernet Network Systems
Document Type:
Procurement Specification
Organization:
Rockwell Automation
Author:
Rockwell Automation
Target Audience:
Engineers, procurement specialists, and system integrators in industrial sectors
Effective Period:
Ongoing
Approval Date:
2021-01-01
Revision Date:
N/A
Year:
2021
Region / City:
Not specified
Subject:
Ethernet cabling system for Category 5E data communication
Document type:
Specification
Author:
Not specified
Target audience:
Contractors, engineers
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified