№ files_lp_3_process_7_078182
File format: docx
Character count: 1652
File size: 733 KB
This document provides a comprehensive guide for CISOs to manage application security programs, referencing best practices and OWASP resources.
Year:
2013
Region / city:
N/A
Subject:
Application Security
Document Type:
Guide
Organization / Institution:
OWASP Foundation
Author:
Marco Marona
Target Audience:
Chief Information Security Officers (CISOs)
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Document ID:
BPM-015 Appendix GMISO
Version:
Draft v0.1
Revision date:
June 3, 2025
Revision history:
First draft for stakeholder review
Document type:
Technical requirements appendix
Issuing organization:
Midcontinent Independent System Operator (MISO)
Subject:
Inverter-Based Resource modeling requirements
Applicable standards:
FERC Order 2023; NERC Reliability Standards; IEEE 2800-2022
Applicable resources:
Solar PV, battery energy storage systems, wind plants type III and IV, hybrid and co-located plants
Model types covered:
PSS®E standard library models; PSS®E user-defined models; TSAT™ user-defined models; PSCAD™ models
Simulation focus:
Fault ride-through capability; converter-driven stability
Process scope:
Interconnection Request through Commercial Operation Date
Intended audience:
Interconnection customers; generator owners; power system model developers
Regulatory context:
Generator interconnection and system impact studies within MISO
Year:
2026–2027
Location:
Goa, India
Organization:
3rd Generation Partnership Project (3GPP)
Working Group:
SA4 Audio SWG
Meeting:
TSG-SA WG4 Meeting #135
Document Identifier:
S4-260202
Agenda Items:
7.6 / 15.3
Document Type:
Work plan / technical coordination document
Work Item:
ATIAS_Ph3-MED (Terminal Audio quality performance and Test methods for Immersive Audio Services, Phase 3)
Source:
Rapporteur ATIAS_Ph3-MED
Status:
For Agreement
Related Specifications:
26.260 (Objective test methodologies); 26.261 (Performance requirements and objectives)
Approval Target:
TSG-SA #115, March 2027
Meetings Referenced:
SA4#135, SA4#135-bis-e, SA4#136, SA4#137-e, SA4#138, SA4#139
Scope:
Development schedule and review activities for immersive audio testing methods and performance requirements within 3GPP SA4
Year:
2025
Region / City:
Not specified
Theme:
Fertility treatment support in the workplace
Document Type:
Guidance document
Author:
People Services
Target Audience:
Employees undergoing fertility treatment
Period of Validity:
Not specified
Approval Date:
24.04.2025
Date of Changes:
Not specified
Institution:
Not specified
Year:
2013
Region / city:
United States
Topic:
Patient classification, healthcare resource allocation
Document type:
Handbook
Organization:
Veterans Health Administration (VHA)
Author:
Allocation Resource Center (ARC)
Target audience:
VHA staff, healthcare administrators
Period of validity:
2013
Approval date:
2013
Date of changes:
2013
Year:
2013
Region / City:
United States
Topic:
Laboratory Information Management System (LIMS), VistA
Document Type:
User Guide
Organization / Institution:
Department of Veterans Affairs (VA), Office of Information and Technology (OIT)
Author:
Project Development Team
Target Audience:
Information Resource Management (IRM), system administrators, operations staff, LIMS/Configuration staff, Laboratory Automated Data Processing Application Coordinators (ADPACS), Laboratory Information Managers (LIM), authorized laboratory staff
Effective Period:
Not specified
Approval Date:
September 2013
Modification Date:
Not specified
Note:
Description
Year:
2013
Region / City:
Washington, DC
Subject:
Federal Financial Participation (FFP) in ADP Equipment and Services
Document Type:
Supporting Statement
Institution:
U.S. Department of Health and Human Services, Administration for Children and Families
Author:
U.S. Department of Health and Human Services
Target Audience:
State officials and related government entities
Period of Effectiveness:
Ongoing (Annual updates required)
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2013
Jurisdiction:
Texas, USA
Topic:
Prescriptive authority delegation for nurse practitioners and physician assistants
Document type:
Guidance and form
Legal basis:
SB 406, 83rd Texas Legislature; Texas Occupations Code Section 157; Texas Administrative Code Chapter 193
Applicable settings:
All practice settings except facility-based practices (hospitals and long-term care facilities)
Requirements included:
Written agreement, signatures, license numbers, practice locations, drug categories, consultation and referral plan, emergency plan, communication plan, supervision delegation, quality assurance plan, periodic face-to-face meetings
Effective date:
November 1, 2013
Review period:
Initial 3 years monthly, then quarterly; exceptions for experienced NP/PAs with previous prescriptive authority
Organization:
Department of Veterans Affairs
Facility:
Veterans Affairs Medical Center, San Francisco
Document type:
Infection control policy manual
Author:
C. Diana Nicoll, M.D., PhD
Role of author:
Medical Center Director
Committee:
Infection Control Committee
Revision date:
April 2013
Original publication date:
June 2011
Subject area:
Infection prevention and control in healthcare settings
Target audience:
Medical center employees and clinical staff
Scope:
Patient care, employee health, environmental controls, and outbreak management
Includes sections on:
Standard Precautions, PPE, isolation practices, waste disposal, occupational health, emergency and outbreak management
Year:
2013
Region / City:
Hines, IL, United States
Document Type:
Contract Amendment / Modification
Issuing Agency:
Department of Veterans Affairs
Contracting Officer:
Patricia Gibson-Anderson
Contractor:
Not specified
Effective Date:
August 19, 2013
Proposals Due Date:
September 11, 2013
Subject:
Great Lakes TCA Site Visit Responses and Documentation
Attached Documents:
Questions and answers from TCA site visit August 30, 2013; TCA May–July 2013; TCA detailed formulary; 1-dimensional barcode
Year:
2013
Region / City:
North America
Subject:
Commercial printing standards
Document type:
Technical standard
Author:
Ron Ellis, Joe Fazzi, Don Hutcheson
Target audience:
Printers, designers, print buyers
Period of validity:
Ongoing
Approval date:
2013
Date of changes:
2013
Document type:
Statutory notification form
Form code:
EEA14
Legal basis:
Employment Equity Amendment Act, 2013 (Act No. 47 of 2013), Section 21(4A)
Related legislation:
Labour Relations Act (Sections 189 and 197); Public Finance Management Act, 1999; Municipal Finance Management Act, 2003
Issuing authority:
Director-General, Employment Equity Registry
Responsible institution:
Department of Labour
Country:
South Africa
Intended respondents:
Designated employers
Purpose stated:
Notification of inability to submit Employment Equity Report(s)
Reporting year:
As specified by the employer
Submission channel:
Employment Equity online reporting system
Pages:
2
Year:
2013
Region / City:
Not specified
Subject:
Professional responsibility in legal practice
Document Type:
Outline
Organization / Institution:
Not specified
Author:
Stephen Gillers
Target Audience:
Legal professionals, law students
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Modifications:
Not specified
Year:
2025
Region / city:
West Virginia
Topic:
Employment Law
Document Type:
Legislative Bill
Author:
Delegates Hanshaw and Hornbuckle
Target Audience:
State Employees and Government Officials
Effective Date:
July 1, 2025
Date of Approval:
April 8, 2025
Date of Amendments:
None
Year:
2013
Region / City:
N/A
Topic:
Accessibility
Document Type:
Checklist
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Users creating accessible documents
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2012
Region / City:
Global
Topic:
SharePoint Server 2013, Test Lab Guide
Document Type:
Technical Guide
Organization / Institution:
Microsoft Corporation
Author:
James Morey
Target Audience:
IT professionals, system administrators, and developers
Period of validity:
Not specified
Approval Date:
July 2012
Date of updates:
April 2013
Description of Changes:
Updated instructions, links, and simplifications
Context:
Technical guide for configuring an intranet and team sites environment using SharePoint Server 2013 in a test lab scenario.
Year:
2013
Country:
Kingdom of Bahrain
Type of document:
Law
Legal field:
Civil aviation
Issuing authority:
King of the Kingdom of Bahrain
Approving bodies:
Shura Council; Council of Representatives
Date of issuance:
18 June 2013
Hijri date of issuance:
9 Shaaban 1434 A.H.
Place of issuance:
Riffa Palace
Publication status:
Published in the Official Gazette
Effective date:
From the day following publication in the Official Gazette
Replaced legislation:
Civil Aviation Law promulgated by Legislative Decree No. (6) of 1995; Legislative Decree No. (14) of 1986 imposing fees for Departure Services by Flight
Related international instruments:
Convention on International Civil Aviation (Chicago, 1944); Rome Convention (1952)
Responsible ministry for implementation:
Ministry of Transportation
Language of official version:
Arabic
Source of English version:
Legislation & Legal Opinion Commission
Author:
Brad Jarreau
Instructor:
Mrs. Mary Marley
Course:
Expository Writing
Date:
2013-11-24
Document type:
Student essay
Genre:
Reflective academic writing
Subject:
Writing philosophy
Educational level:
Secondary or undergraduate education
Intended audience:
Academic readers
Context:
Writing assignment
Organization:
World Intellectual Property Organization (WIPO) Arbitration and Mediation Center
Jurisdiction:
Netherlands
Regulatory framework:
Dispute Resolution Regulations for .nl Domain Names
Related authority:
Stichting Internet Domeinregistratie Nederland (SIDN)
Document type:
Formal complaint and procedural notice
Subject matter:
Dispute concerning registration of a .nl domain name
Parties:
Complainant and Respondent (domain name registrant)
Procedure:
Administrative dispute resolution with mediation and panel decision
Response deadline:
20 calendar days from notification
Possible outcome:
Transfer of domain name or denial of complaint
Applicable contract:
Registration Contract with SIDN and General Terms and Conditions for .nl Registrants
Communication method:
Electronic correspondence with specified exceptions
Language:
English