№ lp_1_2_26779
Technical requirements appendix defining mandatory simulation models, quality tests, and submission milestones for inverter-based resources connecting to the MISO transmission system.
Document ID: BPM-015 Appendix GMISO
Version: Draft v0.1
Revision date: June 3, 2025
Revision history: First draft for stakeholder review
Document type: Technical requirements appendix
Issuing organization: Midcontinent Independent System Operator (MISO)
Subject: Inverter-Based Resource modeling requirements
Applicable standards: FERC Order 2023; NERC Reliability Standards; IEEE 2800-2022
Applicable resources: Solar PV, battery energy storage systems, wind plants type III and IV, hybrid and co-located plants
Model types covered: PSS®E standard library models; PSS®E user-defined models; TSAT™ user-defined models; PSCAD™ models
Simulation focus: Fault ride-through capability; converter-driven stability
Process scope: Interconnection Request through Commercial Operation Date
Intended audience: Interconnection customers; generator owners; power system model developers
Regulatory context: Generator interconnection and system impact studies within MISO
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.