№ lp_1_2_25713
File format: docx
Character count: 8059
File size: 1262 KB
This document outlines the procedure for requesting electronic plans for facilities access to Telstra ducts, including requirements for contractors and environmental compliance.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
March 31, 2014
Location:
Blackburn Conference Center, 1405 Spring Street, Atlanta, GA
Event:
Dependency and TPR under the New Juvenile Code
Schedule:
8:00-9:00 Check-in, 9:00-10:15 Removal and Preliminary Protective Hearings, 10:15-10:30 Break, 10:30-11:45 Adjudication, Disposition and Reviews, 11:45-12:15 Break – pick up boxed lunch, 12:15-1:15 Ethics, 1:15-1:30 Break, 1:30-2:45 Permanency Hearings and Permanent Guardianship, 2:45-4:00 TPR
Fees:
GACC Member $25.00, Non-Member $125.00
Hotel Subsidy:
GACC will provide hotel rooms for a limited number of members traveling more than 50 miles
Target Audience:
Child’s Attorney/Attorney-GAL, Parent’s Attorney, SAAG, Juvenile Defender, Other
Organizer:
GACC
Contact Information:
[email protected]
Event Type:
Conference
Period:
One day event
Year:
2015
Jurisdiction:
Florida, USA
Case:
J.B. v. DCF, 170 So. 3d 780
Document Type:
Legal guidance / Judicial notice
Relevant Law:
Florida Statutes §39.815; Florida Rule of Juvenile Procedure 8.530
Audience:
Parents involved in termination of parental rights proceedings
Filing Deadline:
20 days after entry of TPR order
Appeal Period:
30 days from denial of motion or TPR order
Required Content:
Case name and number, TPR order date, attorney errors, mailing and contact information
Procedural Notes:
Original motion filed with court clerk, copies to parties, court may schedule hearing
Year:
2017
Region / City:
Oxford, UK
Subject:
Oncology, TNM Classification
Document Type:
Appendix
Institution:
Wiley-Blackwell
Author:
Brierley JD, Gospodarowicz MK, Wittekind C
Target Audience:
Medical professionals, oncologists, pathologists
Period of validity:
1 January 2018 and onward
Date of Approval:
Not specified
Date of Revisions:
Not specified
Document type:
Construction finalisation record
Purpose:
Description of works completed in accordance with FA11, CRA11 or TWA11 Facilities Access to Duct
Subject:
Facilities access to Telstra ducts
Infrastructure owner:
Telstra
Applicable agreements:
Facilities Access Agreement, Customer Relations Agreement, Telstra Wholesale Agreement
Project references:
Study xxxxx CFD01, linked to xxxxx TP01
Scope of works:
Duct construction, sub-duct and fibre installation, breakouts, sealing, labelling
Geographic scope:
A End and B End destinations with state references
Technical components:
Ducts, sub-ducts, bare fibre, splice, loops, MSJ, breakouts
Contractor roles:
Surveying, civils, hauling
Evidence requirements:
As-built plans, manhole sheets, technical documents, photo evidence
Standards referenced:
Telstra standards for duct sealing
Note:
Year
Contextual description:
Detailed report documenting the completed works as part of the facilities access to Telstra ducts agreement.
Note:
Year
Year:
2017
Document Title:
Section 233113 – Metal Ducts
Document Type:
Product MasterSpec Section
Subject:
HVAC metal ductwork specifications
Copyright Holder:
The American Institute of Architects (AIA)
Publisher:
Deltek, Inc.
Licensee:
Nordfab Ducting, LLC
Address:
150 Transit Avenue, Thomasville, NC 27360 USA
Contact Phone:
(800) 532-0830
Website:
https://www.nordfab.com/
Related Standards:
ASHRAE 62.1; LEED 2009; LEED v4; IgCC; ASHRAE 189.1; Green Globes
Section References:
230593 Testing, Adjusting, and Balancing for HVAC; 233116 Nonmetal Ducts; 233119 HVAC Casings; 233300 Air Duct Accessories
Issuing Organization:
The American Institute of Architects (AIA)
Distribution:
Exclusively published and distributed by Deltek, Inc.
Year:
2021
Type of Document:
Technical Specification
Discipline:
Mechanical / HVAC
Applicable Standards:
ASCE, ASTM, NFPA, SMACNA, UL, VA PG-18-10
Scope:
Supply, return, exhaust, make-up, and relief air ducts including fire and smoke dampers, sound attenuators, and accessories
Submission Requirements:
Manufacturer data, submittals, O&M manuals
Audience:
Engineers, contractors, facility managers
Reference Sections:
01 00 00, 01 33 23, 01 81 13, 07 84 00, 23 05 11, 23 05 93, 23 09 23, 23 82 16, 23 40 00
Version:
4.3.0.0
Protocol Posting Date:
June 2025
CAP Laboratory Accreditation Program Protocol Required Use Date:
March 2026
Year:
2025
Region / City:
Not specified
Subject:
Medical/Pathology Protocol
Document Type:
Medical Protocol
Author:
Rondell P. Graham, William V. Chopp, Yue Xue, Dhanpat Jain
Target Audience:
Medical professionals, Pathologists
Period of Validity:
March 2026
Approval Date:
June 2025
Date of Changes:
June 2025
Glossary:
Expert, Expert Contributor, Core Data Elements, Conditional Data Elements
Context:
Medical protocol outlining accreditation requirements for examining specimens from patients with carcinoma of the distal extrahepatic bile ducts.
Year:
2026
Region / City:
GCC, UAE
Subject:
Fire-Resisting Duct Systems
Document Type:
Technical Specification
Organization / Authority:
Civil Defense, Manufacturer
Author:
Not specified
Target Audience:
Contractors, Engineers, Consultants
Standards Referenced:
BS 476 Part 24, EN 1366 Parts 1/8/9, NFPA-96, SMACNA, DW-144
Materials:
G90/Z275 galvanized steel, Carbon Steel, Black Steel, Mild Steel, Stainless Steel
Fire Rating:
Up to 4 hours
Certification:
UKAS accredited test certificate, third-party approvals (LPCB, Certifire, Warringtonfire, BRE)
Installation Requirements:
Civil defense approved contractor, manufacturer-certified supports, hangers, sealants, gaskets, clamps
Inspection:
Third-party conformance inspection report
Pressure Classification:
Class A to D according to DW/144
Reference Code:
UAE Fire & Life Safety Code, Chapter 10 – Table 10.1
Service name:
Telstra Internet Direct Adapt
Service variants:
Telstra Internet Direct Premium Adapt; Telstra Internet Direct Lite Adapt
Type of document:
Service terms and conditions
Provider:
Telstra
Jurisdiction:
Australia
Commencement of service:
On initial supply of service and access
Service term:
Month to month
Availability changes:
15 April 2022; 15 November 2022; 15 November 2025
Access requirements:
Approved Access Service
Pricing reference:
Telstra Connect
IP addressing:
Single static IP address provided
Optional add-ons:
Internet Direct Secondary MX Server; Domain Name Server hosting
Applicable policies:
Acceptable Usage Policy; Australian Consumer Law
Contractual framework:
Our Customer Terms
Year:
Not specified
Region / City:
Australia
Topic:
Health, Safety, Environment
Document Type:
Framework / Policy Guidance
Organization:
Telstra
Audience:
Suppliers of services and high-risk products
Scope:
Suppliers of services and high-risk products to Telstra
References:
Telstra HSE Standards, AS/NZ 3745
Attachments:
Definitions (Attachment 1)
Requirements:
Legal and contractual obligations of suppliers, mandatory HSE elements including Asbestos, Gas Detection, Special Work Locations, Electromagnetic Energy
Emergency Planning:
Compliance with AS/NZ 3745 for facilities management
Monitoring:
Managed and reviewed by Telstra designated contact, network induction mandatory for suppliers and visitors
Risk Management:
Includes hazard identification, inspections, risk assessment, and control measures
Environmental Considerations:
Energy impact, recycling, waste management, visual and flora/fauna protection
Document type:
Construction finalisation record
Purpose:
Description of works completed in accordance with FA11, CRA11 or TWA11 Facilities Access to Duct
Subject:
Facilities access to Telstra ducts
Infrastructure owner:
Telstra
Applicable agreements:
Facilities Access Agreement, Customer Relations Agreement, Telstra Wholesale Agreement
Project references:
Study xxxxx CFD01, linked to xxxxx TP01
Scope of works:
Duct construction, sub-duct and fibre installation, breakouts, sealing, labelling
Geographic scope:
A End and B End destinations with state references
Technical components:
Ducts, sub-ducts, bare fibre, splice, loops, MSJ, breakouts
Contractor roles:
Surveying, civils, hauling
Evidence requirements:
As-built plans, manhole sheets, technical documents, photo evidence
Standards referenced:
Telstra standards for duct sealing
Note:
Year
Contextual description:
Detailed report documenting the completed works as part of the facilities access to Telstra ducts agreement.
Year:
2023
Region / City:
Global
Topic:
Network Services
Document Type:
Terms and Conditions
Organization:
Telstra
Author:
Telstra
Target Audience:
Telstra customers
Period of Validity:
From 30 November 2023 to 16 January 2026
Approval Date:
Not specified
Date of Changes:
16 July 2025