№ lp_2_1_06326
File format: docx
Character count: 76255
File size: 72 KB
Technical construction specification section defining requirements for fabrication, materials, submittals, quality assurance, and installation of single- and double-wall metal duct systems and related HVAC components within a project manual.
Year:
2017
Document Title:
Section 233113 – Metal Ducts
Document Type:
Product MasterSpec Section
Subject:
HVAC metal ductwork specifications
Copyright Holder:
The American Institute of Architects (AIA)
Publisher:
Deltek, Inc.
Licensee:
Nordfab Ducting, LLC
Address:
150 Transit Avenue, Thomasville, NC 27360 USA
Contact Phone:
(800) 532-0830
Website:
https://www.nordfab.com/
Related Standards:
ASHRAE 62.1; LEED 2009; LEED v4; IgCC; ASHRAE 189.1; Green Globes
Section References:
230593 Testing, Adjusting, and Balancing for HVAC; 233116 Nonmetal Ducts; 233119 HVAC Casings; 233300 Air Duct Accessories
Issuing Organization:
The American Institute of Architects (AIA)
Distribution:
Exclusively published and distributed by Deltek, Inc.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2017
Region / City:
Oxford, UK
Subject:
Oncology, TNM Classification
Document Type:
Appendix
Institution:
Wiley-Blackwell
Author:
Brierley JD, Gospodarowicz MK, Wittekind C
Target Audience:
Medical professionals, oncologists, pathologists
Period of validity:
1 January 2018 and onward
Date of Approval:
Not specified
Date of Revisions:
Not specified
Document type:
Construction finalisation record
Purpose:
Description of works completed in accordance with FA11, CRA11 or TWA11 Facilities Access to Duct
Subject:
Facilities access to Telstra ducts
Infrastructure owner:
Telstra
Applicable agreements:
Facilities Access Agreement, Customer Relations Agreement, Telstra Wholesale Agreement
Project references:
Study xxxxx CFD01, linked to xxxxx TP01
Scope of works:
Duct construction, sub-duct and fibre installation, breakouts, sealing, labelling
Geographic scope:
A End and B End destinations with state references
Technical components:
Ducts, sub-ducts, bare fibre, splice, loops, MSJ, breakouts
Contractor roles:
Surveying, civils, hauling
Evidence requirements:
As-built plans, manhole sheets, technical documents, photo evidence
Standards referenced:
Telstra standards for duct sealing
Note:
Year
Contextual description:
Detailed report documenting the completed works as part of the facilities access to Telstra ducts agreement.
Note:
Year
Year:
2021
Type of Document:
Technical Specification
Discipline:
Mechanical / HVAC
Applicable Standards:
ASCE, ASTM, NFPA, SMACNA, UL, VA PG-18-10
Scope:
Supply, return, exhaust, make-up, and relief air ducts including fire and smoke dampers, sound attenuators, and accessories
Submission Requirements:
Manufacturer data, submittals, O&M manuals
Audience:
Engineers, contractors, facility managers
Reference Sections:
01 00 00, 01 33 23, 01 81 13, 07 84 00, 23 05 11, 23 05 93, 23 09 23, 23 82 16, 23 40 00
Version:
4.3.0.0
Protocol Posting Date:
June 2025
CAP Laboratory Accreditation Program Protocol Required Use Date:
March 2026
Year:
2025
Region / City:
Not specified
Subject:
Medical/Pathology Protocol
Document Type:
Medical Protocol
Author:
Rondell P. Graham, William V. Chopp, Yue Xue, Dhanpat Jain
Target Audience:
Medical professionals, Pathologists
Period of Validity:
March 2026
Approval Date:
June 2025
Date of Changes:
June 2025
Glossary:
Expert, Expert Contributor, Core Data Elements, Conditional Data Elements
Context:
Medical protocol outlining accreditation requirements for examining specimens from patients with carcinoma of the distal extrahepatic bile ducts.
Year:
2026
Region / City:
GCC, UAE
Subject:
Fire-Resisting Duct Systems
Document Type:
Technical Specification
Organization / Authority:
Civil Defense, Manufacturer
Author:
Not specified
Target Audience:
Contractors, Engineers, Consultants
Standards Referenced:
BS 476 Part 24, EN 1366 Parts 1/8/9, NFPA-96, SMACNA, DW-144
Materials:
G90/Z275 galvanized steel, Carbon Steel, Black Steel, Mild Steel, Stainless Steel
Fire Rating:
Up to 4 hours
Certification:
UKAS accredited test certificate, third-party approvals (LPCB, Certifire, Warringtonfire, BRE)
Installation Requirements:
Civil defense approved contractor, manufacturer-certified supports, hangers, sealants, gaskets, clamps
Inspection:
Third-party conformance inspection report
Pressure Classification:
Class A to D according to DW/144
Reference Code:
UAE Fire & Life Safety Code, Chapter 10 – Table 10.1
Year:
2024
Region / City:
United Kingdom
Subject:
Structural Integrity of Metal Components in Nuclear Industry
Document Type:
Technical Assessment Guide
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Inspector and Principal Inspector
Target Audience:
ONR Inspectors and Nuclear Industry Stakeholders
Effective Period:
2024–2026
Approval Date:
September 2024
Next Review Date:
April 2026
Year:
Not specified
Region / City:
Not specified
Topic:
Sheet Metal Design and Engineering Checklist
Document Type:
Checklist
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Suppliers
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A checklist for engineers to confirm essential items when preparing drawings for custom sheet metal, ensuring compliance with material, design, and manufacturing standards.
Note:
Year
Year:
2024
Region / City:
Jackson, MI
Subject:
Roofing Replacements
Document Type:
Request for Proposals (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jackson County Parks
Target Audience:
Contractors, Roofing Companies
Period of Action:
2024
Approval Date:
1/19/2024
Date of Changes:
N/A
Authors:
M. P. Browne; C. O’Rourke; Nathan Wells; A. Mills
Affiliation:
School of Chemistry and Chemical Engineering, Queen’s University Belfast
Country:
United Kingdom
Contact email:
[email protected]
Keywords:
Electrochemistry; Sustainable chemistry; Catalysis; Water splitting
Document type:
Scientific research article
Research field:
Electrocatalysis and photoelectrochemistry
Synthesis method:
Adams method using molten sodium nitrate
Materials studied:
RuO2; Mn2O3; Co3O4; NiO
Electrochemical reactions:
Hydrogen evolution reaction; Oxygen evolution reaction
Electrolyte:
1 M NaOH
Electrode preparation:
Solvent-free pressed powder discs with PTFE binder
Energy source:
Silicon solar cell under AM 1.5 G illumination
Source type:
Experimental laboratory study reporting synthesis, characterization, and electrochemical performance of metal oxide catalysts for solar-driven water splitting.
Year:
2026
Region / city:
Australia
Subject:
Roofing systems and associated works
Document type:
Worksection Template / Technical specification
Organization / institution:
NATSPEC, FIELDERS Steel Roofing Pty Ltd
Intended audience:
Engineers, architects, construction companies
Standards referenced:
AS/NZS 1170.2 (2021), AS 4055 (2021), AS/NZS 3500.3 (2021), AS 2312.1 (2014), AS 4312 (2019), AS 1657 (2018), AS/NZS 1170.3 (2003)
Materials covered:
FIELDERS seamed sheet metal, COLORBOND® prepainted steel, roof plumbing, skylights, roof hatches, roof windows, roof ventilators
Environmental considerations:
Bushfire protection, snow load, green roof design, recycled content, corrosion resistance
Responsibilities:
Provide FIELDERS specialised sheet metal roofing system as documented
Design parameters:
Wind pressure, rainfall intensity, R-Value, U-Value
Related worksections:
0193, 0342, 0343, 0411, 0461, 0471, 0472, 0552, 0802, 0423, 0425, 0426, 0427, 0428, 0429, 0311p, 0341p, 0436p, 0437p
Year:
2025
Note:
Region / city
Topic:
Metal fabrication, safety, welding, technical standards
Document type:
Standards
Target audience:
Students, metal fabrication professionals
Effective period:
July 2025
Year:
Not specified
Region / City:
Not specified
Topic:
Metal composite materials, rain screen systems, and performance requirements
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, builders, and engineers involved in construction
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Region / City:
Oakland, CA
Subject:
Architectural Metal Finishes
Document Type:
Specification
Organization:
Móz Designs, Inc.
Manufacturer:
Móz Designs, Inc.
Target Audience:
Architects, Contractors
Warranty:
Yes
Installation Instructions:
Included
Date of Approval:
September 10, 2019
Materials:
Aluminum, Stainless Steel
Thickness:
Various (from .040” to 3/16”)
Finish Options:
Polycoat Gloss, Polycoat Matte, Powder Coat
Custom Options:
Yes
Examination:
Required prior to installation
Humidity Range:
80% or lower
Storage Conditions:
Avoid direct sunlight and moisture
Product Literature:
Yes
Samples:
Required