№ lp_1_2_65005
File format: docx
Character count: 4595
File size: 588 KB
This document outlines a standard set of well paths for use in evaluating clearance calculations, comparing clearance scanning rules, and testing consistency across software implementations.
Year:
2017
Region / city:
Not specified
Theme:
Well path clearance calculations
Document type:
Technical document
Organization / institution:
Not specified
Author:
Not specified
Target audience:
Engineers, geoscientists, and professionals involved in clearance calculations and well path analysis
Period of validity:
Not specified
Approval date:
May 2017
Date of changes:
9 Feb 2017
Revision history:
10 Oct 2012, 10 Oct 2013, 9 Feb 2017
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / City:
Oregon
Topic:
Oregon Community Paths Program, Federal Funding, Construction Projects
Document Type:
Pre-Application Worksheet
Organization / Institution:
Oregon Department of Transportation (ODOT)
Author:
Oregon Department of Transportation
Target Audience:
Local Governments, Transit Agencies, Natural Resource Agencies, School Districts, Tribal Governments
Period of Action:
2022/2023
Approval Date:
August 1, 2022
Amendment Date:
Not specified
Document type:
Process document
Status:
Not a WECC/NERC Standard
Posting:
Posting Two
Region:
Western Interconnection
Organization:
Western Electricity Coordinating Council
Regulatory context:
NERC / FERC
Related standards:
WECC-0141; WECC-0149; FAC-501-WECC-4; FAC-003-4; PRC-023-4
Subject matter:
Bulk Electric System transfer paths
Purpose:
Revision of the Major WECC Transfer Paths table content
Applicability:
Transmission Owners, Transmission Operators, Reliability Coordinators in the Western Interconnection
Decision-making bodies:
WECC Reliability Risk Committee; WECC Board of Directors
Effective date:
First day of the second quarter following regulatory approval of FAC-501-WECC-4 and approval of this Process
Source type:
Regulatory process specification
Year:
Not specified
Region / City:
Not specified
Topic:
Mathematics, Critical Path Method
Document Type:
Educational Guide
Institution:
NESA
Author:
Not specified
Target Audience:
Students (Mathematics Standard 2)
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2024–2025
Region / City:
Bradford, Airedale, Leeds, Calderdale, Kirklees, Wakefield
Subject:
Perinatal mental health, birth trauma, baby loss, severe fear of pregnancy and birth
Document Type:
Referral form
Organization / Institution:
NHS West Yorkshire PATHs Service
Author:
Multidisciplinary team including psychologists, psychological therapists, midwives, and administrative staff
Target Audience:
Women and birthing people experiencing moderate to severe perinatal mental health symptoms
Service Hours:
Monday–Friday, 9am–5pm
Referral Pathways:
Baby loss, birth trauma, severe fear of pregnancy/birth, parent-infant separation at birth (from 2025)
Exclusion Criteria:
Crisis support, self-harm or suicidal ideation, sudden severe mental health onset, parent-infant relationship issues only, current untreated substance misuse
Assessment Timeline:
New referrals assessed within six weeks
Contact Email:
[email protected]
Recommendation number:
ITU-R F.1703-0
Year:
2005
Organization:
ITU Radiocommunication Assembly
Issuing body:
ITU-R
Subject:
Availability objectives for real digital fixed wireless links in 27 500 km hypothetical reference paths and connections
Related Recommendations:
ITU-T G.827; ITU-R F.1668; ITU-R F.1492; ITU-R F.1493; ITU-R F.557; ITU-R F.695; ITU-R F.696; ITU-R F.697; ITU-T G.826; ITU-T M.1010
Supersedes:
ITU-R F.1492; ITU-R F.1493
Annexes:
Annex 1 (application examples); Annex 2 (event definitions)
Applicable systems:
Real digital fixed wireless links in international and national portions of constant bit-rate digital paths
Key parameters:
Availability ratio (AR); Mean time between outage (Mo); Outage intensity (OI); Reference length 2 500 km; Minimum link length 50 km
Year:
2023
Region / City:
Midland, Jandakot
Topic:
Infrastructure
Document Type:
Project Description
Organization / Institution:
Department of Transport
Author:
Not specified
Target Audience:
Local residents, cyclists, pedestrians
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / city:
Ireland, United Kingdom
Field:
Hydrology, Environmental Science
Document Type:
Research Article
Organization / Institution:
UCD Dooge Centre for Water Resources Research, UCD Earth Institute, University College Dublin, University of Bristol
Authors:
Eva M. Mockler, Fiachra E. O’Loughlin, Michael Bruen
Target Audience:
Hydrologists, Environmental Scientists, Researchers
Period of Application:
16 years
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / City:
Not specified
Theme:
Personal achievement, communication skills
Document Type:
Chart, Achievement Tracker
Organization / Institution:
Toastmasters International
Author:
Not specified
Target Audience:
Toastmasters members
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
A document outlining the structure of Toastmasters’ personal achievement levels and associated projects, designed for members to track their progress in the organization’s educational path.
Paths to Black Health (PBH) Work Plan TemplateAFRICAN AMERICAN HEALTH SPECIAL EMPHASIS GRANT PROGRAM
Year:
2023-2025
Region / City:
Not specified
Topic:
Health
Document Type:
Work Plan
Organization:
Not specified
Author:
Not specified
Target Audience:
Grantees
Effective Period:
From grant start through June 30, 2025
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2013
Region / City:
London
Subject:
Train Slot Recasting and Dispute Resolution
Document Type:
Legal Response
Institution:
Network Rail Infrastructure Limited
Author:
Not specified
Target Audience:
Freightliner Heavy Haul Limited, Network Rail, Timetable Panel
Period of Validity:
December 2013 timetable
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2020
Region / City:
Israel, Palestine
Topic:
Israeli-Palestinian Conflict
Document Type:
Report
Organization:
Eurasia Center
Author:
Lucas Miller
Target Audience:
Policymakers, Analysts, General Public
Effective Period:
2020-2050
Approval Date:
April 2020
Date of Changes:
N/A
Project Name:
Newport Pagnell Paths Resurfacing Project
Location:
Newport Pagnell, Milton Keynes and surrounding areas
Document Section:
Appendix A
Document Type:
Tender evaluation and submission form
Issuing Body:
Newport Pagnell Town Council
Subject Area:
Public infrastructure maintenance and procurement
Project Scope:
Resurfacing of paths in various parks in Newport Pagnell
Evaluation Structure:
Technical evaluation, financial assessment, and pricing review
Evaluation Rounds:
Round 1 Headline Questions; Round 2 Contract Specific Questions; Round 3 Financial Assessment
Maximum Technical Score:
60 points
Maximum Pricing Score:
40 points
Total Evaluation Score:
100 points
Financial Requirements:
Submission of audited financial statements for the previous three years
Eligibility Conditions:
Contractor experience, health and safety compliance, administrative capacity, and financial stability
Communication Requirements:
Ability to send and receive electronic communications and access remote internet portals
Health and Safety Oversight:
Compliance with Health and Safety Executive regulations and procedures for work in public open spaces
Procurement Context:
Contractor selection for public works contract
Required Supporting Materials:
Method statement, work schedule, references, financial records
Note:
Year
Region / City:
Montgomery County
Subject:
Transition planning, Disability Services, Education
Document Type:
Educational Guidance
Organization:
Montgomery County DD
Target Audience:
Parents, Educators, Students with Disabilities
Note:
Date
Theme:
Fire Flow Test
Document Type:
Technical Exhibit
Organization / Institution:
Fayetteville Public Works Commission Water Resources Engineering Department
Year:
2024
Region / City:
United States
Topic:
Information Collection, Food Exclusion, Social Security Income
Document Type:
Regulatory Update
Agency:
Social Security Administration
Author:
Social Security Administration
Target Audience:
Social Security Administrators, SSI Applicants and Recipients
Period of Effect:
September 30, 2024 - Ongoing
Approval Date:
March 27, 2024
Date of Changes:
September 30, 2024
Contextual Description:
Document outlines revisions to forms for Supplemental Security Income applications and eligibility due to the exclusion of food from In-Kind Support and Maintenance calculations, effective from September 30, 2024.
Year:
Not specified
Region / City:
Not specified
Subject:
Chemistry
Document Type:
Educational Resource
Institution:
CCEA
Author:
Not specified
Target Audience:
Students, Teachers
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2000
Region / City:
Sweden
Subject:
Ventilation, Energy Efficiency
Document Type:
Technical Report
Organization / Institution:
Svensk Ventilation
Author:
Föreningen V
Target Audience:
Engineers, Building Designers, Ventilation Specialists
Period of Validity:
Ongoing
Approval Date:
2000
Date of Changes:
N/A
Year:
1996
Region / City:
Australia
Subject:
Load Cells, Belt Weighers
Document Type:
Technical Manual
Organization / Institution:
National Measurement Institute
Author:
National Measurement Institute
Target Audience:
Professionals in metrology, engineers, and technicians working with weighing instruments
Effective Period:
Ongoing
Approval Date:
August 1996
Revision Date:
June 2001, July 2004
Context:
Technical manual detailing calculations for the suitability of load cells in belt weighers, aligning with metrological standards for accurate and certified installations of load cells and belt weighers.
Year:
2023
Region / City:
Not specified
Topic:
Drive Wheel Motor Torque Calculation
Document Type:
Technical Report
Organization:
Not specified
Author:
Not specified
Target Audience:
Engineers, Designers, Technical Experts
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified