№ files_lp_3_process_7_015609
File format: docx
Character count: 4936
File size: 74 KB
Memorandum presenting the position of the Joint Utilities of New York regarding proposed revisions to the voltage flicker supplemental screen test under the New York Standardized Interconnection Requirements and outlining recommended future research scope for EPRI and Pterra.
Date:
September 8, 2021
To:
Jason Pause, Electric Distribution Systems, Office of Electric, Gas & Water, Department of Public Service
From:
Joint Utilities of New York – Interconnection Technical Working Group
Subject:
Response to EPRI and Pterra Voltage Flicker Screen Presentations
Related Meeting Date:
June 9, 2021
Location:
Albany, NY
Organization:
Joint Utilities of New York
Agency:
New York Department of Public Service
Referenced Organizations:
EPRI; Pterra Consulting; NYISO
Topic:
Voltage Flicker Test (Screen H) modifications under the Standardized Interconnection Requirements
Technology Scope:
Solar PV; Distributed Energy Resources; Battery Storage
Document Type:
Memorandum
Regulatory Context:
New York Standardized Interconnection Requirements (SIR)
Industry Edit Date:
October 5, 2021
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
International
Subject:
Electromagnetic compatibility limits for harmonics and flicker
Document Type:
Change Proposal Form
Organization / Body:
UNECE GRE IWG
Author:
Not specified (proposer listed with affiliation and email)
Target Audience:
IWG members, electrical engineers, regulatory authorities
Applicable Standards:
JIS C 61000-3-2, JEAG 9702, IEC TR 60725:2012, IEC TR 61000-3-18:2024
Voltage Range:
<16A and 16A–75A
Date Submitted:
2026-01-09
Justification:
Absence of harmonics and flicker limits for non-230V/400V regions in Japan
Proposed Modification:
Addition of conversion formula for harmonics limit adjustment based on test voltage
Implementation Notes:
Harmonization with Japanese national standards; simulation-based correction factors validated
Year:
2024
Region / City:
N/A
Topic:
High Voltage Battery Return Process
Document Type:
Instructional Guide
Organization / Institution:
Ford Motor Company
Author:
N/A
Target Audience:
Service Managers, Parts Managers
Period of Validity:
N/A
Approval Date:
April 22, 2024
Date of Changes:
N/A
Revision:
7 Updated: 30/06/2016
Note:
© Queensland Rail 2016
Year:
2016
Region / City:
Queensland, Australia
Subject:
Electrical Safety
Document Type:
Safety Requirements
Organisation / Institution:
Queensland Rail
Author:
Francisco Siliezar, Gary Smith
Target Audience:
Contractors, Electrical Workers, Safety Personnel
Period of Validity:
Ongoing, review before 30/06/2019
Approval Date:
30/06/2016
Amendments Date:
30/06/2016
Year:
2016
Region / City:
Canada, United States
Subject:
Medium Voltage Distribution Transformer
Document Type:
Technical Specification
Organization:
Hammond Power Solutions
Author:
Not specified
Standards Referenced:
DOE 10 CFR Part 431, NRCan SOR/2018-201, Ontario Green Energy Act ON Reg.404-12, IEEE C57.12.01, CSA C9-02, NEMA ST-20, UL 1562
Voltage Levels:
1.2kV to 5kV
Transformer Type:
Dry-type, single and three-phase
Efficiency Standards:
DOE 2016, NRCan 2019, Ontario 404/12 (2018)
Warranty:
1 year limited
Testing:
Production tests, type tests on request, temperature rise, sound level, short circuit, BIL, partial discharge
Construction:
Convection air cooled, aluminum or copper windings, high-grade silicon steel core
Enclosure:
Type 3R (various options), ANSI 61 Grey finish
Primary & Secondary Voltage Taps:
As per NEMA standards
Target Audience:
Electrical engineers, procurement, and utility professionals
Note:
Year
Topic:
Electrical Installation
Document Type:
Educational Material
Target Audience:
Students, Electrical Technicians
Contextual Description:
Instructional material for selecting wiring systems and cables for low voltage electrical installations, designed for use in vocational training and assessment of electrical skills.
Year:
2025
Region / city:
Not specified
Theme:
Medium-voltage switchgear
Document Type:
Technical Summary
Organization / institution:
Switchgear Resources, inc.
Author:
Not specified
Target audience:
Engineers, technical professionals
Period of validity:
Not specified
Approval date:
May 16, 2025
Modification date:
Not specified
Year:
[Prompt: insert year]
Region / City:
[Prompt: insert region or city]
Topic:
Distribution System Connection Agreement
Document Type:
Agreement
Agency / Institution:
Scottish Hydro Electric Power Distribution PLC
Author:
[Prompt: insert author or organization]
Target Audience:
[Prompt: insert target audience]
Period of Validity:
[Prompt: insert validity period]
Approval Date:
[Prompt: insert approval date]
Amendment Date:
[Prompt: insert amendment date]
Note:
Contextual Description
Year:
2015
Region / city:
Western Interconnection
Subject:
Reliability Standards, Automatic Voltage Regulators
Document type:
Compliance Audit Worksheet
Organization / institution:
WECC
Author:
WECC Compliance Staff
Target audience:
Entities subject to compliance audits for VAR-002-WECC-2
Period of validity:
Ongoing
Approval date:
July 2011
Revision date:
July 2015
Year:
Not applicable
Region / City:
Not applicable
Theme:
Electrical safety and installation
Document type:
Unit descriptor
Author:
Not specified
Target audience:
Participants in vocational training programs
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2021
Region / city:
Tangerang
Topic:
Medium voltage switchgear
Document type:
Price list
Organization / institution:
ABB Electrification Products Division
Author:
ABB
Target audience:
Engineers, procurement managers
Period of validity:
Until February 2022
Approval date:
Not provided
Date of amendments:
Not provided
Note:
Year
Theme:
Electrical Safety
Document Type:
Permit
Target Audience:
Testing Personnel, Electrical Supervisors
Note:
Year
Jurisdiction:
Western Australia
Country:
Australia
Legal basis:
Work Health and Safety (Mines) Regulations 2022
Regulation:
Regulation 675UK
Related legislation:
Work Health and Safety Act 2020
Document type:
Regulatory notification form
Regulatory authority:
Mine safety regulator
Subject:
High risk mining activity
Activity type:
Installation of high voltage electrical equipment
Notification timeframe:
30 days prior to installation
Applicable standards:
Australian Standards AS 2067
Obligated party:
Mine operator (person conducting a business or undertaking)
Associated parties:
Contractors (PCBU), health and safety representatives
Industry:
Mining
Language:
English
Year:
2023
Region / City:
CAISO
Topic:
Interconnection Process, Long Lead-Time Resources, Offshore Wind
Document Type:
Comment Submission
Organization / Institution:
Invenergy
Author:
Invenergy
Target Audience:
Stakeholders in the energy sector, regulatory bodies
Period of Effect:
2023–2027
Approval Date:
N/A
Date of Changes:
N/A
Note:
Audit ID
Regions covered:
North America, NERC compliance
Type of Document:
Compliance Audit Worksheet
Organization:
AT&T
Document type:
Ordering guidelines
Subject:
Access Service Request (ASR) for local interconnection
Version:
70
Geographic scope:
United States (21 states)
Industry:
Telecommunications
Intended users:
Carriers and interexchange customers
Content scope:
ASR ordering options, field descriptions, transport, trunking, billing, contacts, and translation questionnaires
Source type:
Technical and administrative specification
Year:
2025
Region / City:
Southern California
Topic:
Distributed Generation Deliverability
Document Type:
Application
Author:
Southern California Edison
Target Audience:
Distributed Generation Facility Owners, Utility Operators
Period of Validity:
Until April 15, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Description:
Application for deliverability status submission for distributed generation facilities seeking interconnection to investor-owned utility distribution facilities under ISO Tariff Section 40.4.6.3.