№ lp_1_23754
File format: docx
Character count: 3270
File size: 108 KB
This document outlines the procedure for submitting and approving change orders within a Design-Build project, detailing necessary approvals and documentation requirements.
Note:
Date
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
[Insert location]
Topic:
Design-Build Services
Document Type:
Request for Proposal (RFP)
Institution:
[Insert College Name]
Author:
[Insert Name]
Target Audience:
Prospective Proposers
Project Period:
[Insert period]
Approval Date:
[Insert Date]
Date of Changes:
[Insert Date]
Note:
Year
Context:
A procedural checklist for the Missouri Department of Transportation (MoDOT) outlining the steps in the procurement process for a Design-Build project.
Year:
2012
Region / City:
N/A
Subject:
Quality Control in Construction Projects
Document Type:
Specification
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Contractors, Project Managers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Region / City:
Various Locations
Theme:
Design-Build Construction
Document Type:
Request for Proposal (RFP)
Organization / Institution:
OFCC + School District Board
Author:
Not specified
Target Audience:
Short-Listed Firms, Prospective Proposers
Period of Validity:
N/A
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / city:
Not specified
Topic:
Procurement, Design-Build, Competitive Bidding
Document type:
Standard Bidding Document
Organization / institution:
Millennium Challenge Corporation (MCC)
Author:
MCC Program Acquisition & Assistance Practice Group
Target audience:
Accountable Entities, Implementing Entities, Contractors
Validity period:
Not specified
Approval date:
August 19th, 2025
Amendment date:
Not specified
Document Type:
Certification form
Project Delivery Method:
Design-Build
Subject:
Right of way status and compliance
Sector:
Transportation infrastructure
Responsible Entity:
Local Public Agency
Funding Source:
Federal Aid
Project Phase:
Design phase
Regulatory Context:
Real property acquisition and utility coordination
Content Scope:
Right of way acquisition, possession status, utilities, railroads, permits, and clearances
Geographic Scope:
Project-specific parcels and locations
Intended Use:
Project approval and advertisement readiness
Administrative Level:
Public infrastructure project documentation
Year:
Not specified
Organization:
WSDOT (Washington State Department of Transportation)
Document Type:
Checklist / Instruction Manual
Scope:
Conceptual Design Approval (CDA) and Project Development Approval (PDA)
Retention Period:
75 years
Related Regulations:
Design Manual Chapter 300.03, Design Bulletin #21-01
Sections Included:
Introductory Documents, Project Summary Documents, Core Documents, Environmental Documentation, Other Approvals and Justifications, Other Items
Target Audience:
Project Engineers, Assistant State Design Engineers
Year:
2025
Region / City:
West Virginia
Subject:
Environmental Protection, Design-Build Program
Document Type:
Legislative Act
Agency / Institution:
West Virginia Department of Environmental Protection
Author:
West Virginia Legislature
Target Audience:
Government officials, legislators, environmental agencies
Period of Effect:
July 11, 2025 – December 31, 2027
Approval Date:
April 12, 2025
Amendment Date:
Not specified
Year:
2020
Region / City:
Not specified
Subject:
Procurement
Document Type:
Standard Bidding Document
Organization:
Millennium Challenge Corporation
Author:
Not specified
Target Audience:
Bidders, Contractors
Validity Period:
Not specified
Approval Date:
June 1, 2020
Amendments Date:
Not specified
Year:
2020
Region / City:
Florida
Topic:
Design-Build, Construction, Project Proposals
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Florida Department of Transportation
Author:
Florida Department of Transportation
Target Audience:
Design-Build Firms, Contractors, Engineers
Period of Validity:
Until further notice
Approval Date:
2020-01-29
Date of Changes:
Highlighted within document
Year:
2017
Region / location:
New York State, Onondaga County, Madison County, Oneida County, Herkimer County
Project name:
Syracuse Division Bundled Bridges
Contract number:
D800001
Document type:
Request for Proposals appendix and proposal form
Procurement method:
Design-Build
Issuing authority:
New York State Thruway Authority
Amendment number:
1
Date of amendment:
November 8, 2017
Subject matter:
Design and construction of bridge infrastructure
Included forms:
Proposal Form FP and related certification, bonding, and acknowledgment forms
Legal jurisdiction:
State of New York
Target participants:
Proposers and design-build contractors
Year:
2023
Region / City:
Livermore, California
Subject:
Insurance and indemnification provisions
Document Type:
Contract Provisions
Organization:
Lawrence Livermore National Laboratory (LLNL)
Author:
Lawrence Livermore National Laboratory
Target Audience:
Contractors and subcontractors involved in construction services at LLNL
Effective Period:
Ongoing for the duration of the contract
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Document Type:
Annual Meeting Report
Committee:
Design-Build Subcommittee (DBS)
Affiliated Organization:
Washington State Department of Transportation (WSDOT)
Partner Organizations:
American Council of Engineering Companies (ACEC); Associated General Contractors (AGC)
Subject:
Design-Build policy, procedures, and process improvement for state transportation projects
Focus Areas:
Fish Passage Projects; Insurance Requirements; Design-Build Training; Design-Builder Performance Report
Program:
WSDOT Design-Build Program
Contact Persons:
Art McCluskey; Richard Patterson; Phil Larson
Year:
2025
Region / Country:
United States of America / Applicable MCC Partner Country
Topic:
Procurement of Design-Build Projects
Document Type:
Standard Bidding Document
Issuing Organization:
Millennium Challenge Corporation, Program Acquisition & Assistance Practice Group
Department:
Department of Compact Operations, Sector Operations Division
Prepared By:
MCC Program Acquisition & Assistance Practice Group
Target Audience:
Accountable Entities and Implementing Entities
Procurement Method:
Quality and Price-Based Selection (QPBS)
Estimated Project Value:
USD 10 million or greater
Reference Date:
August 19, 2025
Contract Guidelines:
FIDIC Conditions of Contract for Plant and Design-Build, First Edition, 1999
Application:
For projects financed fully or partially by MCC
Effective Date:
January 8, 2025
Program:
MnDOT Design-Build Program
Document Series:
Book 2
Section:
10
Project Identification:
Design-Build Project; Federal Project No. [insert #]; S.P. [insert #]
Subject:
Pavements and Roadway Materials
Document Type:
Technical specification section
Issuing Organization:
Minnesota Department of Transportation
Referenced Standards:
AASHTO Standards; ASTM International Standards; Federal Highway Administration Publications
Related Manuals:
MnDOT Pavement Design Manual; MnDOT Geotechnical Manual; MnDOT Standard Specifications for Construction; MnDOT Road Design Manual; MnDOT Concrete Manual; MnDOT Grading & Base Manual; MnDOT Laboratory Manual
Scope:
Requirements for investigations, materials, design, testing, documentation, and reporting for roadway pavements and materials
Geographic Context:
Minnesota, United States
Contractual Context:
Design-Build delivery method
Required Submittals:
Roadway Subsurface Investigation Plan; electronic roadway boring logs; laboratory test data; Materials Design Recommendation
Testing Requirements:
Atterberg limits; particle size distribution; R value; organic content; Proctor density
Digital Tools Referenced:
Trimble Pathfinder Office; Bentley Systems InSitu; GEOPAK Tech; Trimble ProXR
Facilitating dynamic life cycle assessment for climate change mitigation – Supplementary information
Year:
2023
Region / City:
Montpellier, France
Topic:
Climate change mitigation, Life cycle assessment
Document type:
Supplementary Information
Organization / Institution:
IFP Energies nouvelles, Univ Montpellier, INRAE, Institut Agro
Author:
Duval-Dachary S., Lorne D., Batôt G., Hélias A.
Target audience:
Researchers, Climate scientists
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2014
Region / City:
Zimbabwe
Theme:
Climate Change, Water Resources
Document Type:
Issues Paper
Organization:
World Bank
Author:
World Bank
Target Audience:
Government, Policymakers, Water Resources Planners
Period of Action:
Not specified
Approval Date:
April 25, 2014
Date of Amendments:
Not specified
Note:
Year
Region / City:
Wisconsin
Theme:
Flammable Liquid Storage Tanks, Ownership Change
Document Type:
Form
Organization / Institution:
Wisconsin Department of Agriculture, Trade and Consumer Protection, Division of Trade and Consumer Protection, Bureau of Weights and Measures
Author:
Wisconsin Department of Agriculture, Trade and Consumer Protection
Target Audience:
Tank Owners, Facility Operators
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Date:
16 July 2025
Issue Resolution Proposal:
CRP666
Issues Log ID:
TS1637
Issue Title:
Changes to GBCS & CHTS to Support VW Relay and & CADg
Source:
SMIP
Date Raised:
22 February 2024
Status:
Draft v0_2
Documentation Reference:
GBCS v4.3, CHTS v1.6
Description:
Addressing the changes required to support Internet based WAN communications using Virtual WAN Relay functionality on the HAN in the GBCS and CHTS specs.
Proposed Implementation and Preamble:
On 12 December 2023 SMIP issued a consultation on proposals to establish arrangements whereby communications with Smart Metering Systems installed in premises with no Wide Area Network could be established via the DCC using the internet and the consumer’s broadband. On 24 October 2024 we published a consultation response reflecting the substantial support for the proposals. Upon completion of that consultation, we instructed DCC to produce an SEC Variation Test Approach Document on 24 November, which enabled DCC to formally engage in the necessary development. The solution proposed relies on the use of the consumer’s broadband and consequently requires the consent of the consumer for it to be implemented. In addition, it requires additional device functionality to be installed at the premises, this is to be provided either from a separate device or incorporated into another device such as a PPMID or CAD. That Device will be referred to as the Virtual WAN Device (VWD). DCC have accommodating the changes to WAN provision that are required to implement the proposals. This includes the provision of a Virtual Wan Provider (VWP), some modest changes to DSP but without any DUIS or schema affecting changes and the creation of a CH variant known as the Virtual WAN CH (VWCH), accommodating the Virtual WAN message relay functionality. As per the December 23 consultation, the current use case for Virtual WAN message relay is No WAN areas. The VWCH will be processing Commands that have originated from the internet, via the VWP and a VWD. Virtual WAN message relay is enabled once the VWD is present in the VWCH Device Log, the enablement at installation will be via an automatic Device Command from the VWD. Currently there are no plans for service users to enable the VWD to join with the VWCH, via a service request, hence no DUIS Schema changes are proposed, such that suppliers’ current operational systems and processes are intended to remain unaffected. A design principle for the initiative is to minimise change to deliver a VW message relay as soon as possible. As such functionality that requires significant DCC change such as new Service Requests has been deliberately avoided. For a new installation in a No WAN situation, the VWD will ‘pair’ and ‘join’ with the VWCH automatically as part of the I&C activity. Whilst there is currently no service request as such, DCC will be able to determine whether a VWD is operating in ‘VW Mode’ (i.e., connecting via the VWP rather than though the CSP WAN), or not. Whilst the method for doing this remains outside of the GBCS / CHTS, the intention is to make this information available to service users, which might be appropriate to suppliers following a CoS event. The method involved will be discussed in the Virtual WAN Interface Specification. This CRP sets out the proposed changes to both CHTS and GBCS.
Year:
1995
Region / City:
United States
Topic:
Medicare Appeal Rights
Document Type:
Notice
Organization / Institution:
Centers for Medicare & Medicaid Services (CMS)
Author:
CMS
Target Audience:
Medicare beneficiaries
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified