№ lp_1_2_27034
Comprehensive checklist for managing and organizing design-build documentation packages, detailing required and optional items for CDA and PDA stages, along with filing and approval guidelines.
Year: Not specified
Organization: WSDOT (Washington State Department of Transportation)
Document Type: Checklist / Instruction Manual
Scope: Conceptual Design Approval (CDA) and Project Development Approval (PDA)
Retention Period: 75 years
Related Regulations: Design Manual Chapter 300.03, Design Bulletin #21-01
Sections Included: Introductory Documents, Project Summary Documents, Core Documents, Environmental Documentation, Other Approvals and Justifications, Other Items
Target Audience: Project Engineers, Assistant State Design Engineers
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.