№ lp_1_2_03546
File format: docx
Character count: 18241
File size: 21 KB
Year:
2015-2022
Region / City:
Redmond, WA, USA
Subject:
Security and communication systems
Document Type:
Product Specification
Organization / Institution:
Aiphone Corp.
Author:
Aiphone Corp.
Target Audience:
Specifiers, Engineers, Installers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2015-2022
Region / City:
Redmond, WA, USA
Subject:
IP Video Intercom System
Document Type:
Technical Specification
Organization / Institution:
Aiphone Corp.
Author:
Aiphone Corp.
Target Audience:
Specifiers, Engineers, Installers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2021
Region / City:
Global
Subject:
Operating system, software compatibility, hardware integration
Document Type:
Manual
Author:
Unknown
Target Audience:
Users of SMSQ/E on various platforms
Validity Period:
Ongoing
Approval Date:
2021
Amendment Date:
None
Note:
Context Description
Note:
Year
Contextual description:
Update on the SUSR process, with a focus on outstanding issues, key actions, and the progress of various working groups.
Year:
2017
Document ID:
c05381064
Version:
2
Product:
HP Desktops, Notebooks, and Workstations
Software:
HP TPM Configuration Utility
Operating System:
Windows 7, Windows 8.x, Windows 10
TPM Versions:
1.2, 2.0
Scope:
Supported HP notebook and desktop platforms listed in the document
Release date:
25-Jan-2017
Last updated:
25-Jan-2017
SoftPaq:
81900
Firmware Files:
TPM12 and TPM20 BIN files for upgrade and conversion
Compatibility:
Commercial platforms with Infineon SLB9670 TPM and latest BIOS
Requirements:
Physical presence, administrator privileges, BIOS updates, full disk decryption
Instructions:
Steps for extraction, TPM BIN selection, TPM.MSC check, OS type detection, utility execution, command line options
Document Type:
Technical instruction manual
Subject:
Receiver setup and binding procedures for quadcopters
Related Hardware:
DSM compatible receivers, FrSky receivers, FlySky receivers, Futaba compatible receivers
Supported Transmitters:
Spektrum radios, FrSky Taranis X9D Plus, FlySky radios with AFHDS 2A protocol, Futaba radios with FASST support
Firmware Mentioned:
Cleanflight, Betaflight
Receiver Models Mentioned:
XM+ receiver
Configuration Interface:
CLI command line
Communication Modes:
S.BUS output mode
Functions Described:
Receiver binding, transmitter pairing, fail safe configuration
Applicable Device Type:
Quadcopter flight control systems
Operational Indicators:
LED status indicators for binding and signal state
Year:
2015-2022
Region / City:
Redmond, WA, USA
Subject:
IP Video Intercom System
Document Type:
Technical Specification
Organization / Institution:
Aiphone Corp.
Author:
Aiphone Corp.
Target Audience:
Specifiers, Engineers, Installers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Topic:
Communication Systems, Emergency Messaging, Intercom Systems
Document Type:
Specification
Year:
Not specified
Region / City:
Not specified
Subject:
Communications Systems
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Installers, Contractors
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Global
Theme:
Security Systems
Document Type:
Product Specification
Organization / Institution:
Hanwha Techwin
Author:
Hanwha Techwin
Target Audience:
Security system designers, installers, and specifiers
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2013-2015
Region / City:
Redmond, WA, USA
Topic:
Communication systems, security
Document type:
Product specification
Organization / Institution:
Aiphone Corp.
Author:
Aiphone Corp.
Target audience:
Specifiers, architects, engineers
Effective period:
Ongoing
Approval date:
2013
Amendment date:
N/A
System components:
Master Station, Sub Master Station, Video Door Station, Call Extension Speaker, External Devices
Context:
A product specification document describing the technical features and installation requirements of the Aiphone JP Series video intercom system.
Year:
2023
Region / City:
Global
Topic:
Wireless Communication, Audio Technology
Document Type:
Product Information
Organization:
XTALK
Author:
XTALK
Target Audience:
Professionals in media, events, and live performances
Period of Use:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Organisation:
National Home Builders Registration Council (NHBRC)
Office Location:
Sunninghill
Country:
South Africa
Legislative Framework:
Occupational Health and Safety Act No. 85 of 1993
Project Type:
Request for Quotations (RFQ)
Subject Matter:
Procurement and installation of a wired internal intercom system
Building Description:
Five-storey office building including basement, security control room, guard house and parking area
System Requirements:
One-way wired intercom system with base station and substations
Maintenance Period:
36 months post-installation
Project Duration:
90 days from commencement
Quality Standards:
South African Bureau of Standards (SABS) compliance and Certificate of Compliance (COC)
Briefing Requirement:
Compulsory briefing
Evaluation Method:
Technical mandatory criteria and 80% functionality scoring
Mandatory Experience:
Minimum 5 years intercom installation experience
Required Accreditation:
Valid wireman’s license and/or SAQCC certification
Year:
2013
Region / City:
Long Beach, CA
Topic:
Maintenance and repair of medical equipment
Document Type:
Cooperative Agreement
Agency:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Contractors, healthcare system providers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Black Hawk County, Waterloo, IA
Topic:
Network Switch Acquisition
Document Type:
Request for Proposal
Organization / Institution:
Black Hawk County Information Technology
Author:
Black Hawk County Information Technology
Target Audience:
Potential Bidders / Contractors / Vendors
Period of Validity:
Until May 30, 2023
Approval Date:
May 2, 2023
Modification Date:
Not specified
Description:
A request for proposals for the acquisition of 38 network switches, including technical specifications and proposal submission instructions.
Year:
2011
Region / City:
Allen County
Topic:
Software Requirements, Food Network Management
Document Type:
Software Requirements Specification
Author:
Associated Churches
Target Audience:
Software developers, system designers, IT staff
Period of Effectiveness:
N/A
Approval Date:
09/27/2011
Modification Date:
N/A
Year:
2026
Organization:
Preschool Access for All Learning Network
Document Type:
Mini-Grant Guidance
Target Audience:
Educators, Paraprofessionals, District Inclusion Teams
Age Group:
Children with disabilities, ages 3–5
Focus Areas:
Inclusive opportunities, developmentally appropriate environments, high-quality instruction
Expenditure Categories:
Instructional supplies and materials, in-service/staff development
Contact:
Misty Moody, Assistant Commissioner of Early Learning, [email protected]
Document Purpose:
Provide guidelines for mini-grant expenditures to support inclusion and developmentally appropriate practices
Year:
2017
Region / City:
Queensland
Topic:
Network Access Control, ICT Infrastructure
Document Type:
Guideline
Organization / Institution:
Queensland Government Chief Information Office
Author:
Strategic Transformation
Target Audience:
Queensland Government departments, Solution architects, CIOs, Technical SMEs
Period of Validity:
N/A
Approval Date:
December 2017
Date of Changes:
N/A
Year:
2025
Region / City:
Atlanta, Georgia
Subject:
National Healthcare Safety Network (NHSN) Surveillance Changes
Document Type:
Program Change Explanation
Organization:
Centers for Disease Control and Prevention (CDC), Division of Healthcare Quality Promotion
Author:
Paula Farrell
Target Audience:
Healthcare professionals involved in data collection for NHSN
Effective Period:
Until 06/30/2025
Approval Date:
May 12, 2025
Amendment Date:
N/A
Context:
The document describes changes to a data collection instrument used for healthcare facility surveillance as part of the NHSN system, detailing revisions to data collection and formatting guidelines.
Year:
2019
Region / city:
Alaska
Topic:
Community Care Network (CCN) Services
Document Type:
Sources Sought / Special Notice
Agency / Organization:
U.S. Department of Veterans Affairs, Veterans Health Administration (VHA), Office of Community Care (OCC)
Author:
Veterans Affairs
Target Audience:
Contractors, Healthcare Providers
Period of Action:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Description:
Request for information (RFI) for CCN services and healthcare resources in Alaska
Place of Performance:
Alaska
Additional Information:
Industry Days scheduled for March 26 and March 28, 2019
Year:
2022
Region / City:
Gauteng
Subject:
Broadband Network, Telecommunications
Document Type:
Invitation to Bid
Organization / Institution:
SITA
Author:
Not specified
Target Audience:
Bidders
Period of Validity:
120 days from the Closing Date
Approval Date:
26 October 2022
Modification Date:
Not specified