№ lp_1_01271
File format: docx
Character count: 34770
File size: 74 KB
Year:
2023
Region / City:
Black Hawk County, Waterloo, IA
Topic:
Network Switch Acquisition
Document Type:
Request for Proposal
Organization / Institution:
Black Hawk County Information Technology
Author:
Black Hawk County Information Technology
Target Audience:
Potential Bidders / Contractors / Vendors
Period of Validity:
Until May 30, 2023
Approval Date:
May 2, 2023
Modification Date:
Not specified
Description:
A request for proposals for the acquisition of 38 network switches, including technical specifications and proposal submission instructions.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
Not specified
Region / Location:
Not specified
Subject:
Electrical equipment, manual transfer switches
Document type:
Technical specification / Guide specification
Organization:
Eaton
Standards:
UL 1008, CSA C22.2 No. 178, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Certification:
ISO 9001 or ISO 9002 manufacturer certification, seismic certification as specified
Intended audience:
Engineers, contractors, specification writers
Equipment type:
Low voltage manual transfer switches, molded case type
Installation:
Seismic mounting requirements, field measurements, handling and storage instructions
Submittals:
Product data sheets, schematics, drawings, test reports, installation manuals
Construction:
UL 1008 listed, double throw, mechanical interlocks, fixed mount, molded case switches or circuit breakers
Year:
2021
Region / City:
Sri Lanka
Theme:
Procurement, Contractual Terms
Document Type:
Bidding Documents
Institution:
Eastern University, Sri Lanka
Author:
Eastern University, Sri Lanka
Target Audience:
Bidders, Suppliers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2016
Region / city:
Hangzhou, P.R. China
Topic:
Electronic Safety and Security
Document Type:
Product Guide Specification
Organization / Institution:
Construction Specifications Institute
Author:
ZHEJIANG DAHUA VISION TECHNOLOGY CO., LTD.
Target Audience:
Architects, Engineers, Manufacturers
Validity Period:
Indefinite
Approval Date:
2016
Amendment Date:
None
Year:
2016
Region / City:
Hangzhou, China
Topic:
Electronic Safety and Security, Network Video Recorders, Ethernet Switch
Document Type:
Product Guide Specification
Organization / Institution:
Zhejiang Dahua Vision Technology Co., Ltd.
Author:
Zhejiang Dahua Vision Technology Co., Ltd.
Target Audience:
Architects, Engineers, Installers, Manufacturers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2020
Document type:
Technical amendment
Standard reference:
Global Standard GSH003 Rev. 03 (05/11/2019)
Amendment number:
Amendment 1
Revision:
00
Revision date:
29-07-2020
Organization:
Enel SpA
Business unit:
Global I&N – O&M/NCS
Scope:
Update of specific technical and service requirements
Applicable companies:
Enel Distribuição São Paulo, Enel Distribuição Ceará, Enel Distribuição Goiás, Enel Distribuição Rio
Countries involved:
Argentina, Brazil, Chile, Colombia, Spain, Italy, Peru, Romania
Rated voltage range:
72.5 kV to 245 kV
Rated frequency:
60 Hz
Standards referenced:
IEC 62271-1, IEC 60815
Approval roles:
Elaborated by, Verified by, Approved by
Intellectual property holder:
Enel SpA
Year:
Not specified
Region / City:
Not specified
Subject:
Symbol character formatting
Document type:
Technical Specification
Author:
Not specified
Target audience:
Users working with XML and text formatting
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2021
Region / City:
Global
Topic:
Electrical Equipment
Document Type:
Product Guide
Organization / Institution:
ABB
Author:
ABB
Target Audience:
Engineers, Architects, Contractors
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Global
Topic:
Electrical Equipment
Document Type:
Product Guide Specification
Organization / Institution:
ABB
Author:
Not specified
Target Audience:
Architects, Engineers, Specifiers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / city:
Not specified
Topic:
Electrical circuits, resistance calculations
Document type:
Technical document
Organization / institution:
Not specified
Author:
Not specified
Target audience:
Engineers, researchers in electrical engineering
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2026
Region / City:
Not specified
Subject:
Electrical Equipment – Automatic Transfer Switches
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Applicable Standards:
UL 1008, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Manufacturer:
Generac Power Systems (example listed)
Quality Assurance:
ISO 9001 certified manufacturer, 10 years minimum experience
Target Audience:
Electrical contractors, engineers, project managers
Submission Requirements:
Product data, technical specifications, dimensioned drawings, seismic certification, operation and maintenance manuals, warranty documents
Project Conditions:
Procedures for interruption of existing electrical service
Seismic Requirements:
Certification for equipment and accessories, installation instructions
Equipment Type:
Low voltage automatic transfer switches
Installation Requirements:
Anchorage, mounting, conduit space, and wiring instructions
Operational Features:
Open or open-delayed transition, mechanical and electrical interlocks
Year:
2017
Region / Institution:
University of Iowa
Department:
Biology
Employee:
Ima Hawk
Position:
HR Associate / PGA1
Supervisor:
Ura Boss
Initiated by:
Ura Boss
Date Initiated:
11/6/2017
Date of Last Review:
6/8/2017
Date Signed:
11/13/2017
Type of Document:
Career Development Record
Scope:
Employee responsibilities, performance evaluation, compliance tracking
Note:
Year
Organization / Institution:
Black Hawk County
Target Audience:
Contractors, vendors
Publication date:
September 12, 2024
Organization:
Swindoll, Janzen, Hawk & Loyd, LLC
Abbreviation:
SJHL
Location:
Manhattan, Kansas, United States
Industry:
Accounting
Award:
Accounting Today’s Best Accounting Firms to Work For
Awarding organization:
Accounting Today
Survey partner:
Best Companies Group
Geographic scope:
United States
Evaluation methodology:
Workplace policies review and employee survey
Number of awarded firms:
100
Eligibility requirements:
U.S.-based accounting firm with at least 15 employees and minimum one year in operation
Document type:
Press release
Year:
2022
Region / City:
Grafton
Theme:
Track & Field Meet
Document Type:
Invitation
Organization:
Grafton High School
Author:
Kevin Moore
Target Audience:
Athletic Directors, Track Coaches, and Officials
Event Date:
May 7, 2022
Deadline for Entries:
May 5, 2022 at Noon
Time of Event:
9:30 am (Field Events), 10:00 am (Running Events)
Contact Information:
(262) 376-5515
Year:
N/A
Region / City:
N/A
Theme:
Football Coaching, Tackling Training
Document Type:
Training Guide
Organization / Institution:
N/A
Author:
Coach Cav
Target Audience:
Youth football coaches and players
Period of Action:
N/A
Approval Date:
N/A
Modification Date:
N/A
Context:
A guide detailing the progression of tackling techniques for youth football coaches, focusing on shoulder tackling fundamentals, drills, and leverage progression.
Year:
2023
Date:
June 8, 2023
Time:
10:00 AM
Location:
INRCOG Board Room, 229 East Park Avenue, Waterloo, IA
Region:
Black Hawk County, Iowa
Country:
United States
Document Type:
Meeting Notice and Agenda
Governing Body:
Black Hawk County Metropolitan Area Transportation Policy Board
Topics:
Transportation planning, Transportation Improvement Program (FY 2024–2027), Public input meetings, Bicycle infrastructure, Passenger rail, Transit study, Long-range transportation plan
Related Plan:
FY 2024–2027 Transportation Improvement Program (TIP)
Note:
Related Plan
2050 Long-Range Transportation Plan
Website:
www.bhcmpo.org
Participating Jurisdictions:
City of Cedar Falls; City of Elk Run Heights; City of Evansdale; City of Gilbertville; City of Hudson; City of Raymond; City of Waterloo; Black Hawk County; MET Transit Board; Waterloo Regional Airport Board
Board Chair:
DeAnne Kobliska
Vice-Chair:
Rob Green
Year:
2024
Date:
January 11, 2024
Time:
10:00 AM
Location:
INRCOG Board Room, 229 East Park Avenue, Waterloo, IA
Region:
Black Hawk County, Iowa
Governing Body:
Black Hawk County Metropolitan Area Transportation Policy Board
Document Type:
Meeting notice and agenda
Subject:
Transportation planning and project oversight
Related Program:
FY 2024-2027 Transportation Improvement Program (TIP)
Projects Referenced:
Surface Transportation Block Grant project on Lafayette Rd in Raymond; City Bridge Replacement project on Butterfield Rd over Drainage in Hudson
Action Items:
Approval of agenda; approval of December 14, 2023 minutes; public hearing and approval of TIP amendments
Discussion Items:
Project updates; city and county project updates; MET Transit Study; NEIA NEPA Study; general discussion
Participating Entities:
Member cities of Cedar Falls, Elk Run Heights, Evansdale, Gilbertville, Hudson, Raymond, Waterloo; Black Hawk County; MET Transit Board; Waterloo Regional Airport Board
Public Hearing:
Amendments to FY 2024-2027 TIP
Date:
January 11, 2024
Time:
10:00 AM – 10:27 AM
Location:
Black Hawk County, Iowa
Document Type:
Meeting Minutes
Governing Body:
Black Hawk County Metropolitan Area Transportation Policy Board
Chair:
Lisa Smock
Secretary:
Aldina Dautović
Participating Organizations:
Cities of Elk Run Heights, Gilbertville, Hudson, Raymond, Waterloo, Cedar Falls; Black Hawk County; MET Transit; Iowa DOT; INRCOG; AECOM; MSA
Primary Topics:
Approval of agenda and prior minutes; amendments to FY 2024–2027 Transportation Improvement Program (TIP); project updates; MET Transit Study; NEIA NEPA Study; Midwest Interstate Passenger Rail Commission letter of support; 2050 Long-Range Transportation Plan
Programs Referenced:
Surface Transportation Block Grant (STBG); Transportation Improvement Program (TIP); 2050 Long-Range Transportation Plan (LRTP)
Public Hearing:
Amendments to FY 2024–2027 TIP regarding Lafayette Road in Raymond and Butterfield Road bridge replacement in Hudson
Voting Record:
Motions approved unanimously
Meeting Outcome:
Approval of agenda, prior minutes, TIP amendments, and adjournment
Year:
2024
Region / City:
Black Hawk County, Cedar Falls, Evansdale, Hudson, Waterloo
Topic:
Transportation Planning, Program Approvals, Project Updates
Document Type:
Meeting Minutes
Organization / Institution:
Black Hawk County Metropolitan Area Transportation Technical Committee
Author:
Aldina Dautović
Target Audience:
Local Government Officials, Transportation Planners, Policy Board Members
Effective Period:
2024-2028
Approval Date:
April 11, 2024
Date of Last Revision:
April 11, 2024
Year:
2024
Region / City:
Black Hawk County, Iowa, USA
Topic:
Transportation planning and infrastructure projects
Document Type:
Meeting minutes
Organization / Authority:
Black Hawk County Metropolitan Area Transportation Policy Board
Author:
Aldina Dautović
Participants:
Local mayors, city engineers, transit managers, transportation planners, MPO staff
Agenda Items:
Approval of agenda and previous minutes, project updates, discussion items, letters of support
Key Projects Discussed:
4th–6th Street conversion, Main Street reconstruction, Park Avenue and 11th Street bridges, La Porte Road, Lafayette Road, MET Transit route restructure, NCMM youth shuttle, NEIA NEPA study, SS4A Comprehensive Action Plan
Meeting Date:
August 8, 2024
Meeting Duration:
10:00 AM – 10:36 AM
Approval Motions:
Agenda, previous minutes, Letter of Support for Waterloo project