№ lp_1_2_07168
File format: docx
Character count: 6741
File size: 80 KB
Year:
2026
Note:
Region / City
Topic:
Frontline Worker Program
Document Type:
Instructions
Organization / Institution:
Microsoft
Target Audience:
Partners, Customers
Period of Validity:
Until June 30, 2026
Approval Date:
January 29, 2026
Context:
A set of instructions for partners to complete the Statement of Work (SOW) and Proof of Execution (POE) documentation for the Frontline Worker Program, including detailed requirements for signatures, user adoption thresholds, and deployment types.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / City:
Not specified
Subject:
Cell research, fate mapping, lineage tracing
Document type:
Research paper
Institution:
Not specified
Author:
Not specified
Target audience:
Researchers in cell biology, genomics, and bioinformatics
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2016
Region / City:
South Africa
Theme:
Government services, Monitoring, Public service
Document type:
Report
Agency / Institution:
Department of Planning, Monitoring and Evaluation (DPME)
Author:
Not specified
Target audience:
Government officials, policy makers, public service managers
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Date:
25 June 2020
Jurisdiction:
Queensland, Australia
Subject:
Sentencing reform and human rights in relation to assaults on frontline public officers
Document type:
Submission
Submitting body:
Queensland Human Rights Commission
Recipient body:
Queensland Sentencing Advisory Council
Legislation referenced:
Anti-Discrimination Act 1991 (Qld)
Note:
Legislation referenced
Human Rights Act 2019 (Qld)
International instrument referenced:
International Covenant on Civil and Political Rights
Focus groups:
Police officers; corrective services officers; frontline emergency service workers; public officers
Key issues:
Deterrence; denunciation; proportionality of penalties; equality before the law; rights of the accused; victims’ rights
Geographical scope:
State of Queensland
Human rights engaged:
Right to life; right to equality; right to liberty and security; right to a fair hearing; protection from cruel, inhuman or degrading treatment
Period considered:
Contemporary sentencing framework as at 2020
Year:
2023
Region / City:
Massachusetts
Theme:
Healthcare, Mental Health, COVID-19
Document Type:
Legislative Report
Organization / Institution:
Massachusetts Department of Public Health
Author:
Not specified
Target Audience:
Public Health Officials, Healthcare Workers, Legislators
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
Canada
Topic:
Accessible library services for patrons with print disabilities
Document type:
Training webinar transcript
Organization / Institution:
CELA (Centre for Equitable Library Access)
Author:
N/A
Target audience:
Library staff, public library members
Period of validity:
Ongoing
Approval date:
N/A
Date of last modification:
N/A
Year:
2008–2022
Country:
Italy
Disease:
Waldenström Macroglobulinaemia
Field:
Hematology / Oncology
Study Type:
Retrospective real-life study
Patient Population:
447 treatment-naive WM patients
Treatment Regimens:
Bendamustine-Rituximab (BR); Dexamethasone-Rituximab-Cyclophosphamide (DRC); Other chemo-immunotherapies (R-chemo)
Primary Endpoint:
Progression-Free Survival (PFS)
Secondary Endpoint:
Overall Survival (OS)
Key Variables:
Relative Dose Intensity (RDI); Bendamustine starting dose; Age; Creatinine Clearance
Follow-up:
Long-term follow-up
Statistical Analysis:
Comparative survival analysis with significance testing
Year:
2024
Region / City:
Europe
Topic:
Waldenstrom’s Macroglobulinemia, Treatment Approaches
Document Type:
Clinical Trial Report
Author:
Meletios Dimopoulos, Maria Gavriatopoulou, Efstathios Kastritis, Christian Buske
Target Audience:
Medical Researchers, Oncologists, Hematologists
Study Phase:
Phase II
Date of Approval:
June 2024
Date of Changes:
N/A
Primary Endpoint:
Achievement of CR / VGPR at 12 and 24 months
Secondary Endpoints:
Time to best response, time to first response, time to treatment failure, remission duration, progression free survival, cause specific survival, overall survival, safety, quality of life
Document Type:
Training Session Material
Session Title:
Frontline Training Session Seven
Subject:
Death Benefits and Family Benefits
Scheme Arrangements Covered:
NPA 60 Arrangement, NPA 65 Arrangement, Career Average Arrangement
Benefit Types:
Death Grants, Adult Survivor Pensions, Children’s Pensions
Applicable Statuses:
In Service, Out of Service, Pensioner
Eligibility Conditions:
Two Years’ Qualifying Service for Dependants’ Benefits
Calculation Basis:
Final Average Salary, Full Time Equivalent Salary, Accrued Pension, Total Contributions with Compound Interest
Intended Audience:
Frontline Staff
Year:
2023
Region / city:
Global
Topic:
Electronic Safety and Security, Video Surveillance
Document type:
Specifications
Organization / institution:
OpenEye
Author:
OpenEye
Target audience:
Industry professionals, integrators, and installers of security systems
Period of validity:
Ongoing
Approval date:
N/A
Date of changes:
N/A
Note:
Year
Contextual description:
Technical specification of a 4-channel network video recorder with POE switch for surveillance systems, describing its performance, connectivity, and installation requirements.
Year:
2026
Region / City:
N/A
Topic:
Copilot Agents Voucher Service Agreement Verification
Document Type:
Instructional Guide
Organization / Institution:
Microsoft
Author:
N/A
Target Audience:
Partners, Customers
Effective Period:
N/A
Approval Date:
January 14, 2026
Modification Date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
Frontline Worker Program
Document Type:
Instructions
Organization / Institution:
Microsoft
Author:
Not specified
Target Audience:
Partners, Customers
Validity Period:
June 30, 2026
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Region / City:
Global
Theme:
Electronic Safety and Security
Document Type:
Technical Specification
Organization:
Hanwha Techwin
Author:
Hanwha Techwin
Target Audience:
Security Systems Specifiers
Period of Effect:
Ongoing
Approval Date:
N/A
Modification Date:
N/A
Related Standards:
IEEE802.3 Ethernet Standards, ISO / IEC 23008-2:2013, MPEG-H Part2 (ITU H.265, HEVC)
Product Model:
ARN-810S
Technical Requirements:
ONVIF compliant, supports H.265, H.264, MJPEG compression
Description:
Technical specification for an eight-channel network video recorder with integrated PoE switch, including requirements for installation, performance, and system compatibility.
Year:
2016
Region / City:
Global
Theme:
Electronic Safety and Security
Document Type:
Technical Specification
Organization / Institution:
Hanwha Techwin
Author:
Hanwha Techwin
Target Audience:
Security system specifiers, engineers, installers
Effective Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Contextual description:
A guide for learners on completing and submitting a Portfolio of Evidence for assessment against unit standards, outlining the steps and requirements in an assessment process for customer service training.
Year:
2020
Region / city:
NWU
Theme:
Academic induction, teaching and learning
Document Type:
Guidelines
Institution:
North-West University (NWU)
Author:
Not specified
Target audience:
Academic staff
Period of validity:
2020
Date of approval:
Not specified
Date of revisions:
25 May 2018, 2 November 2018, 15 January 2019, 5 December 2019, 20 January 2020, 29 May 2020
Year:
1809-1849
Region / city:
Virginia, USA
Theme:
Literature, American History, War, Performance Adaptations
Document type:
Biography, Literary Analysis
Organization / institution:
N/A
Author:
Lauren McNeel
Target audience:
Students, scholars, literature enthusiasts
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2026
Type:
Technical datasheet
Category:
Electronic component
Standard compliance:
IEEE 802.3af/bt (PoE)
Input voltage range:
7V–72V
Operating temperature:
-40°C to +85°C
Storage temperature:
-40°C to +125°C
Moisture sensitivity level:
MSL 1
Termination material:
RoHS tin-silver-copper over tin over nickel over phosphor bronze
Frequency range:
up to 300 kHz
Weight:
6.3 g
Package size:
EP13 5+5
Manufacturer part numbers:
LP13P-33L, LP13P-50L, LP13P-12L, LP13P-19L, LP13P-24L, PA1136NL, PA1137NL, PA1138NL, PA1260NL, PA1269NL, PA1276NL, PA1309NL, PA1460NL, PA1528NL, PA1528ANL, PA1769NL, PA2271NL
Isolation voltage:
1500 Vrms
Power ratings:
3.3V–24V output at specified currents