№ lp_1_2_48324
File format: docx
Character count: 114429
File size: 1249 KB
The document provides guidance on preparing for, conducting, and closing out an Integrated Baseline Review (IBR) within NASA projects, including responsibilities, required steps, and lessons learned.
Year:
2023
Region / city:
Washington, D.C.
Topic:
Earned Value Management, Project Management
Document Type:
Handbook
Organization:
NASA
Author:
National Aeronautics and Space Administration
Target Audience:
NASA project managers, suppliers, government partners, academic institutions, and international partners
Effective Period:
Ongoing
Approval Date:
January 2023
Date of Revision:
January 2023
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Document ID:
BPM-015 Appendix GMISO
Version:
Draft v0.1
Revision date:
June 3, 2025
Revision history:
First draft for stakeholder review
Document type:
Technical requirements appendix
Issuing organization:
Midcontinent Independent System Operator (MISO)
Subject:
Inverter-Based Resource modeling requirements
Applicable standards:
FERC Order 2023; NERC Reliability Standards; IEEE 2800-2022
Applicable resources:
Solar PV, battery energy storage systems, wind plants type III and IV, hybrid and co-located plants
Model types covered:
PSS®E standard library models; PSS®E user-defined models; TSAT™ user-defined models; PSCAD™ models
Simulation focus:
Fault ride-through capability; converter-driven stability
Process scope:
Interconnection Request through Commercial Operation Date
Intended audience:
Interconnection customers; generator owners; power system model developers
Regulatory context:
Generator interconnection and system impact studies within MISO
Note:
Year
Subject Matter:
Earned Value Management, Project Management
Document Type:
Notification
Organization / Institution:
NASA
Author:
Project Manager
Target Audience:
Project Team, IBR Participants, Contractors
Year:
2004
Region / City:
Falls Church, VA
Topic:
Data Exchange, Health Care Provider Record
Document Type:
Technical Specification
Organization:
EI/DS Program Office
Author:
Mr. Phil Dederer, Mr. Steve Luhrman, Mr. Jeffrey Lopata, Mr. Allen Johnston
Target Audience:
Technical personnel, EI/DS Program Office members, TRICARE Management Activity-Aurora (TMA-Aurora) staff
Effective Period:
Not specified
Approval Date:
May 7, 2004
Revision Date:
Not specified
Year:
2007
Region / City:
Falls Church, VA
Topic:
Data Exchange, Healthcare Information Systems
Document Type:
Interface Control Document (ICD)
Organization / Institution:
EIDS Program Office
Author:
Not specified
Target Audience:
Military Health System, Healthcare IT Professionals
Effective Period:
Not specified
Approval Date:
March 9, 2007
Revision Date:
Not specified
Year:
2005
Region / City:
Falls Church, VA
Theme:
Data exchange, Customer Satisfaction, Military Health System
Document type:
Interface Control Document (ICD)
Organization / Institution:
EI/DS Program Office
Author:
Mr. Phil Dederer
Target audience:
Military Health System personnel, EI/DS Program Office
Period of validity:
Indefinite
Approval date:
January 28, 2005
Revision date:
None provided
Year:
2026
Region / City:
Global
Topic:
3GPP Specifications
Document Type:
Technical Report
Organization:
3GPP
Author:
Huawei
Target Audience:
Technical professionals involved in 3GPP specifications
Period of validity:
N/A
Approval Date:
15th January 2026
Change Date:
N/A
Document type:
Audit report
Subject:
Indoor air quality assessment
Scope:
Building exterior, HVAC systems, indoor spaces
Methodology:
EPA Indoor Air Quality Building Education and Assessment Model (I-BEAM)
Responsible role:
IAQ Manager
Related program:
LEED
Audit frequency:
Baseline with re-inspection at least once every five years
Issues addressed:
Indoor air quality conditions and remediation measures
Communication process:
Occupant reporting and work order system
Year:
2025
Region / city:
Chattogram, Cumilla, Kalaroa, Bangladesh
Topic:
Water and sanitation services
Document type:
Terms of Reference / Assessment Brief
Organization:
Water & Sanitation for Urban Population (WSUP)
Target audience:
Consultants and consulting firms
Scope:
Community, school, public and private water services, utility capacity, national coordination
Duration:
3-year project
Indicators:
Service access, infrastructure condition, water quality, functionality, social inclusion, gender and disability considerations, financial and time cost, hygiene and sanitation practices
Year:
2024
Region / City:
Kano, Ogun
Subject:
Agricultural development, Agro-Industrial Processing, Baseline study
Document Type:
Terms of Reference
Organ / Institution:
Federal Ministry of Agriculture and Rural Development (FMARD), International Fund for Agricultural Development (IFAD), African Development Bank (AfDB), Islamic Development Bank (IsDB)
Author:
Not specified
Target Audience:
Consulting firms, project implementers, agricultural stakeholders
Period of Implementation:
2024-2029
Approval Date:
19 September 2022
Amendment Date:
27 November 2023
Year:
2022
Region / city:
United Kingdom
Topic:
Social work, Adult services
Document type:
Self-assessment
Organization / institution:
Department of Health and Social Care
Author:
Chief Social Worker for Adults
Target audience:
Newly qualified social workers in adult services
Period of validity:
2022 - ongoing
Approval date:
2022
Date of changes:
Not specified
Year:
2021
Note:
Region / city
Topic:
Tuberculosis Screening
Document type:
Health assessment tool
Target audience:
Health Care Workers (HCWs)
Year:
2023
Region / City:
United Kingdom
Topic:
National Security Vetting, Personnel Security
Document Type:
Application Form
Author:
ADS Group Limited
Target Audience:
Applicants for security clearance, Vetting Points of Contact (VPOC)
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Data Protection:
Yes, under DPA 2018
Context:
Form used for initiating or renewing BPSS and NSV clearance applications for individuals working with ADS Member Companies, to confirm the validity of prior checks and initiate further verification if needed.
Year:
2008
Region / City:
Falls Church, VA
Topic:
Case Management Data Exchange
Document Type:
Interface Control Document (ICD)
Organization:
DHSS Program Office
Author:
Paul Lindsey
Target Audience:
DHSS Program Office, BEA, and MHS personnel involved in data exchange
Period of Validity:
Ongoing
Approval Date:
August 18, 2008
Change Date:
N/A
Year:
2012
Region / City:
Falls Church, VA
Topic:
Data Exchange, Military Health System, Contingency Tracking System
Document Type:
Interface Control Document (ICD)
Organization:
DHSS Program Executive Office
Author:
Ms. Karen Hass, Mr. Scott Dreisigacker, Mr. Quinn Smith, Mr. Imran Shah, Mr. Narinder Saund
Target Audience:
DHSS personnel, DMDC staff, Military Health System operators
Period of Validity:
Ongoing, with periodic updates
Approval Date:
April 12, 2012
Revision Date:
None specified
Year:
2017
Region / City:
United States
Topic:
Technology Setup for VSS Kiosk
Document Type:
Technical Documentation
Author:
REDACTED
Target Audience:
IT Staff, System Administrators
Period of Validity:
Ongoing
Approval Date:
01/03/2017
Modification Date:
01/03/2017
Year:
2012
Region / City:
Falls Church, VA
Theme:
Defense Health Services, Data Management, Health Systems
Document Type:
Interface Control Document (ICD)
Organization:
DHSS Program Executive Office
Author:
Ms. Karen Hass
Target Audience:
DHSS, TMA, MHS Data Management, Health Planning Analysts
Period of Validity:
Not specified
Approval Date:
May 18, 2012
Revision Date:
Not specified
Year:
2012
Document type:
Interface Control Document
Version:
Approved Version
Baseline date:
March 1, 2012
Approval date:
April 24, 2012
Managing organization:
Defense Health Services Systems Program Executive Office
Participating systems:
AHLTA; Clinical Data Repository; Military Health System Data Repository
Participating organizations:
Defense Health Services Systems; Defense Health Information Management Systems
Subject area:
Health information systems; clinical data exchange
Scope:
Technical specification of clinical data feeds from AHLTA CDR to MDR
Geographic location:
Falls Church, Virginia, United States
Configuration control authority:
DHSS Program Executive Office
Review and approval bodies:
Configuration Control Board
Document status:
Baseline
Year:
2021
Region / city:
New York
Subject:
UNDP, Syria refugee crisis, regional response, resilience approach
Document type:
Evaluation report
Institution:
United Nations Development Programme (UNDP)
Author:
UNDP Independent Evaluation Office
Target audience:
UNDP staff, stakeholders involved in refugee response, policy makers
Period of validity:
2015–2019
Approval date:
4 February 2021
Date of changes:
N/A
Year:
Tbc
Region / City:
North West London
Theme:
Musculoskeletal (MSK) Services
Document Type:
Service Specification
Organization:
NHS North West London Integrated Care System
Author:
Tbc
Target Audience:
Healthcare professionals, commissioners, service providers
Period of Validity:
Tbc
Approval Date:
Tbc
Review Date:
Tbc