№ files_lp_4_process_3_119528
File format: docx
Character count: 3177
File size: 1267 KB
Official public notice detailing an application for authorisation of submarine pipeline works for the Teal West Development under the Petroleum Act 1998, including technical specifications, regulatory compliance, and inspection instructions for interested parties.
Year:
2026
Region / City:
United Kingdom, North Sea
Subject:
Submarine pipeline construction and authorisation
Document Type:
Public notice
Authority / Institution:
North Sea Transition Authority (NSTA) / Oil and Gas Authority (OGA)
Applicant:
Anasuria Hibiscus UK Limited
Target Audience:
Stakeholders and regulatory bodies
Reference Number:
PA/4921
Date of Publication:
3 February 2026
Deadline for Representations:
3 March 2026
Regulatory Framework:
Petroleum Act 1998; Pipelines Safety Regulations (SI 1996/825)
Technical Annex:
Design pressure, limits of deviation, major accident hazard pipelines
Inspection Locations:
Annex B offices in Aberdeen, Edinburgh, Scrabster, Kirkwall, Lerwick, York
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Location:
SECT 1A/AA Teal / SECT 4A/AA Forest
Sport:
Ice Hockey
Type of Document:
Game Box Score
Teams:
Teal, Forest
Players Listed:
Yes
Goalies:
Yes
Scoring Details:
Yes
Penalties:
Yes
Game Periods:
1st, 2nd, 3rd, O.T.
Final Score:
Teal 5 – Forest 3
Officials:
Not specified
Time Played:
Detailed per player
Assists:
Included
Special Teams:
PP/SH
Year:
2024
Program:
Ph.D. in Education; Ed.D. in Curriculum and Instruction
Institution:
TEAL Graduate Program
Document Type:
Annual Progress Review Form
Audience:
Doctoral Students
Submission Deadline:
November 1 annually
Required Approvals:
Initial Advisor/Supervisory Committee Chair, Graduate Program Coordinator, School of Graduate Studies
Key Components:
Coursework performance, Responsible Conduct of Research training, Supervisory Committee Approval, Program of Study, Comprehensive Examination, Dissertation Proposal, Candidacy Application, Residency Professional Requirements, Manuscript Submission, Professional Presentation, Performance Improvement Plan
Period Covered:
Annual review for enrolled doctoral students
Revision Date:
08/26/2024
Form Purpose:
Tracks doctoral student progress and provides advisement recommendations
Structured Sections:
Student Information, Program Completion Progress, Comprehensive Examination, Dissertation Progress, Professional Activities, Recommendations
Year:
2020
Region / City:
Not specified
Subject:
Submarine Technology, Military Research
Document Type:
Proceedings Paper
Organization / Institution:
Widgets International, XYZebron, Inc.
Author:
Allen B. PrimaryWidgets, Carmine D. East, Frank G. Holst, Jr., Ingrid J. Keppler
Target Audience:
Military, Engineering Professionals, Researchers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
This document is a set of guidelines for formatting and structuring papers for a Submarine Technology Symposium, detailing classifications, font styles, heading formats, and other technical requirements for submissions.
Year:
2025
Region / City:
Charleston, Berkeley, Dorchester Counties
Subject:
Scholarship Program
Document Type:
Scholarship Application
Organization:
Charleston Base United States Submarine Veterans, Incorporated
Author:
Charleston Base United States Submarine Veterans, Incorporated
Target Audience:
High school seniors from Tri-County area
Effective Period:
May 9, 2025
Approval Date:
May 9, 2025
Modification Date:
None
Year:
2026
Region / City:
Ocean
Theme:
Adventure, Treasure Hunt, Sea Life
Document Type:
Story
Organization:
N/A
Author:
Gwyn McCormack
Target Audience:
Children
Period of Action:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2026
Region / city:
North Sea, United Kingdom
Subject:
Submarine pipeline construction and authorisation
Document type:
Public notice
Organization:
Serica Energy (UK) Limited
Authority:
North Sea Transition Authority (NSTA) / Oil and Gas Authority (OGA)
Author:
Serica Energy (UK) Limited
Target audience:
Stakeholders and interested parties in offshore pipeline projects
Application reference:
PA/5586
Inspection locations:
London, Aberdeen, Edinburgh, Scrabster, Kirkwall, Lerwick, York
Deadline for representations:
6 March 2026
Pipeline type:
Umbilical, no hydrocarbon fluids
Regulatory compliance:
Pipelines Safety Regulations (SI 1996/825)
Limits of deviation:
100 metres either side of proposed route
Year:
2018
Region / city:
Victoria, Australia
Theme:
Environmental Impact Assessment, Offshore Gas and Condensate Production
Document Type:
Environmental Plan Summary
Organization / institution:
Cooper Energy
Author:
Cooper Energy
Target Audience:
Stakeholders, Environmental Regulators, Industry Professionals
Effective Period:
Ongoing (Operations and Maintenance Phase)
Approval Date:
April 30, 2018
Revision Date:
April 30, 2018
Year:
Not specified
Region / city:
Not specified
Theme:
Parkinson’s disease, therapeutic research
Document Type:
Pre-Clinical Proposal Template
Organization / Institution:
Michael J. Fox Foundation
Author:
Not specified
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Region / City:
United States
Topic:
Gas Pipeline Safety, Incident Reporting
Document Type:
Government Publication
Agency:
Pipeline and Hazardous Materials Safety Administration (PHMSA)
Author:
Pipeline and Hazardous Materials Safety Administration (PHMSA)
Target Audience:
Gas pipeline operators, federal and state regulators
Period of Validity:
Until June 30, 2026
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Manchester, United Kingdom
Topic:
Pipeline Integrity, Health Monitoring, Risk Assessment
Document Type:
Research Paper
Organization / Institution:
The University of Manchester
Author:
Edet Afangide, Jyoti K. Sinha, K. B. Katnam
Target Audience:
Researchers, Engineers, Industry Professionals
Period of Action:
N/A
Date of Approval:
N/A
Date of Changes:
N/A
Note:
Year
Topic:
Natural Gas, Pipeline Safety
Document Type:
Regulation
Authority:
Office of Conservation
Year:
2018
Region / city:
Not specified
Topic:
Pipeline Integrity Management
Document Type:
Good Practice Guide (GPG)
Organization / institution:
Not specified
Author:
Not specified
Target Audience:
Not specified
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
Year:
Not specified
Region / city:
Not specified
Document Type:
Request for Applications
Organization / institution:
Not specified
Author:
Not specified
Target audience:
Researchers in Parkinson’s disease therapeutics
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Year
Topic:
Neurology, Parkinson’s Disease
Document Type:
Request for Applications
Year:
2026
Region / City:
United States
Subject:
Energy Infrastructure, Natural Gas, Petroleum, Hazardous Liquids
Document Type:
Regulatory Overview
Authority / Agency:
Federal Energy Regulatory Commission (FERC), State Regulatory Agencies
Target Audience:
Pipeline operators, regulators, shippers
Scope:
Interstate and intrastate pipelines
Topics Covered:
Ratemaking process, cost-of-service study, rate design, allocation of costs, regulatory oversight, methodologies for rate setting
Year:
2026
Field:
Neuroimaging / Cognitive Neuroscience
Document Type:
Supplementary Material
Institution:
University or Research Laboratory (not specified)
Methods:
fMRI preprocessing, longitudinal registration, ROI computation
Software:
SPM12, CAT12, DARTEL
Brain Regions:
PFC-PPC, PFC-BG, frontal pole, anterior cingulate cortex, basal ganglia, inferior frontal junction, dorsolateral prefrontal cortex, ventrolateral prefrontal cortex, superior and inferior parietal lobules
Data Resolution:
2 x 2 x 2 mm³
Smoothing:
8-mm FWHM Gaussian kernel
Masking Threshold:
0.2