№ files_lp_4_process_3_138913
File format: docx
Character count: 18032
File size: 133 KB
Year:
2023
Region / State:
Washington
Document Type:
Guidelines and Application Instructions
Organization:
Washington State Department of Health
Target Audience:
Water system managers and applicants
Application Deadline:
November 30, 2023
Webinar Dates:
September 20, 2023; October 11, 2023; November 8, 2023
Submission Portal:
WALT (online portal)
Required Identifiers:
Unique Entity Identifier (UEI), Central Contractor Registration (CCR), Statewide Vendor Number, Unified Business Identifier (UBI)
Project Types Covered:
Construction, Planning, Design, Restructuring, Water Treatment, Source Rehabilitation
Compliance Requirements:
SEPA/NEPA, Water Rights, Technical/Managerial/Financial Capacity, Cultural/Historical Review
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
Texas
Topic:
Water Infrastructure Funding
Document Type:
Program Guidelines
Organization / Institution:
Texas Water Development Board
Author:
Texas Water Development Board
Target Audience:
Local governmental entities, non-profit organizations, community water systems
Effective Period:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Description
Note:
Year
Topic:
Drinking Water, Loan Program
Document Type:
Application Form
Organization / Institution:
DWSRF Administrator
Target Audience:
Local government, water utility representatives
Year:
2026
Region / City:
Washington State, USA
Subject:
Water System Projects
Document Type:
Application Guidelines
Agency / Organization:
Washington Department of Health
Author:
Washington State Department of Health
Target Audience:
Water system managers, nonprofit organizations, project applicants
Validity Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Region / City:
Bay City, Texas
Topic:
Certificates of Obligation
Document Type:
Official Notice
Agency / Institution:
City of Bay City, Texas
Author:
Jeanna Thompson, City Secretary
Target Audience:
General Public, City Officials
Effective Period:
December 9, 2025
Approval Date:
October 14, 2025
Amendment Date:
N/A
Contextual Description:
Official notice from the City of Bay City regarding the intent to issue Certificates of Obligation for water system improvements.
Year:
2023
Region / City:
KwaZulu Natal Province
Topic:
Sanitation Infrastructure Construction
Document Type:
Tender Document
Organization / Institution:
The Mvula Trust
Author:
The Mvula Trust
Target Audience:
Contractors, Bidders
Validity Period:
12 weeks
Approval Date:
15 September 2023
Amendment Date:
N/A
Project Number:
1
Cluster:
SAFE Batch 05
Bid Number:
TMT-DBE-23/24-SAFEB05-KZNCL17
Tender Closing Date:
02 October 2023
Contract Duration:
18 weeks
Tender Value:
VAT Inclusive
Type of Project:
VIP Sanitation
CIDB Grading:
5 GB or Higher
Contractor Requirements:
No Joint Venture / Consortium
Purpose:
Provision of sanitation facilities to schools
Note:
Year
Subject:
Fire Safety in Construction
Document Type:
Guidance
Organization / Institution:
Home Builders Federation (HBF)
Author:
Home Builders Federation (HBF)
Target Audience:
HBF members
Topic:
Deck construction
Document type:
Technical requirements and inspection guidelines
Regulatory references:
Municipal code; ASTM D7032; ASTM E84; UL 723; IRC Tables R507.3.1, R507.4, R507.5, R507.6, R507.7, R507.9
Applicable structures:
Residential decks
Permit requirement:
Required with specified exceptions
Material requirements:
Moisture- and decay-resistant lumber and approved composite materials
Structural elements covered:
Footings, posts, beams, joists, ledgers, lateral connections
Special conditions:
Special Flood Hazard Area compliance
Engineering requirement:
Engineered drawings required for hot tub or similar concentrated loads
Inspection notes:
Re-inspection fee may apply if not prepared
Note:
Year
Year:
2025
Region / City:
Great Britain
Topic:
Engineering Construction, Labor Market Intelligence, Procurement
Document Type:
Invitation to Tender
Organization / Institution:
Engineering Construction Industry Training Board (ECITB)
Author:
ECITB
Target Audience:
Potential Tenderers
Period of Action:
6 months (with optional extension)
Approval Date:
08.07.25
Date of Changes:
08.07.25
Organization:
AMJ Construction
Topic:
Covid-19 health and safety measures
Document type:
Company policy
Industry:
Construction
Applicable guidelines:
Construction Leadership Council; Public Health England
Target audience:
Employees, site visitors, clients, supply chain partners
Date referenced:
11 May 2020
Scope:
Construction sites operated by AMJ Construction
Review frequency:
Weekly
Key measures:
Site inductions, risk assessments, cleaning regimes, social distancing, PPE, signage, adjusted working hours
Year:
2023
Region / City:
New South Wales
Topic:
Procurement Guidelines
Document Type:
Guidelines
Organization / Institution:
Department of Regional NSW
Author:
Not specified
Target Audience:
Suppliers, Consultants in Construction
Period of Validity:
Indefinite
Approval Date:
August 2023
Modification Date:
Not specified
Note:
Year
Theme:
Construction and Engineering Documentation
Document Type:
Submission Guidelines
Organization / Institution:
Department of Veterans Affairs (VA)
Target Audience:
Architects, Engineers, VA Medical Center Personnel
Note:
Year
Theme:
Hazard Identification, Construction Safety
Document Type:
Guideline
Target Audience:
Project Managers, Safety Officers
Note:
Year
Year:
2023
Region / City:
United States
Topic:
Aviation, Airport Construction
Document Type:
Official Notice
Authority / Institution:
Federal Aviation Administration (FAA)
Author:
Federal Aviation Administration (FAA)
Target Audience:
Airport operators, aviation authorities, contractors
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
Year:
2023
Region / City:
New Mexico
Topic:
Air Quality, Construction Permits
Document Type:
Form
Institution:
New Mexico Environment Department
Author:
New Mexico Environment Department
Target Audience:
Businesses and facility owners in New Mexico
Period of validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2024
Region / City:
Malawi
Subject:
Education, Infrastructure Development, Environmental and Social Management
Document Type:
Report
Organization / Institution:
Government of the Republic of Malawi, Ministry of Education
Author:
Government of Malawi
Target Audience:
Government officials, education sector stakeholders, contractors
Implementation Period:
December 2021 – December 2025
Approval Date:
February 2024
Revision Date:
February 2024
Year:
2026
Region / City:
United States
Topic:
Federal procurement and contract management
Document Type:
Policy/Guidance
Agency / Institution:
GSA (General Services Administration)
Author:
GSA
Target Audience:
Contractors, Government Agencies
Period of Validity:
Ongoing
Approval Date:
N/A
Modification Date:
N/A