№ lp_1_25481
File format: docx
Character count: 5230
File size: 641 KB
This document is a proposal for the inclusion of CA_n3A-n7A in TR 38.718-02-01, addressing cross-band isolation and the performance characteristics of filters and duplexers.
Year:
2023
Region / City:
Electronic Meeting
Topic:
3GPP RAN WG4 Meeting
Document Type:
Proposal
Organization / Institution:
Huawei, Hisilicon
Author:
Huawei, Hisilicon
Target Audience:
3GPP RAN WG4 members
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Surety Bond Rider
Document Type:
Bond Rider
Organization / Institution:
American Alternative Insurance Corporation
Year:
2017
Region / City:
Leavenworth, KS
Subject:
Project Modification / Solicitation Amendment
Document Type:
Contract Modification / Addendum
Organization:
Department of Veterans Affairs, Network Contracting Office (NCO) 15
Contract ID:
VA255-17-R-025605
Author:
Unknown
Target Audience:
Contractors, Bidders, and Offerors
Effective Date:
June 1, 2017
Date of Original Documents:
January 13, 2017
Amendment Date:
June 1, 2017
Modification Number:
3
Solicitation Number:
VA255-17-R-025605
Amendment Details:
Amendment to the solicitation, with changes to specifications and drawings, pre-bid RFI list, and clarification of questions raised during the pre-bid conference
Date of Addendum:
June 1, 2017
Year:
2023
Region / City:
North East and North Cumbria (NENC)
Topic:
Pharmaceutical product application
Document Type:
Form
Institution / Organization:
NHS
Author:
North East and North Cumbria ICB
Target Audience:
Clinicians, healthcare professionals, NHS staff
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2022
Region / city:
European Union
Subject:
Biocidal products family, Regulation (EU) No 528/2012
Document type:
Guidance note
Institution:
European Commission
Period of validity:
N/A
Approval date:
N/A
Amendment date:
N/A
Contextual description:
A guidance note outlining the procedure for addressing biocidal product families under Regulation (EU) No 528/2012, with a focus on ongoing and past product authorizations.
Year:
2027
Region / City:
Boston, Massachusetts
Subject:
Healthcare, Hospital Capacity, Medical Services
Document Type:
Project Overview
Organization:
Brigham and Women’s Faulkner Hospital (BWFH)
Author:
Brigham and Women’s Hospital Administration
Target Audience:
Healthcare professionals, hospital administrators, and policymakers
Action Period:
FY 2027
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2020
Region / city:
Elbonia
Topic:
Network Protocols, 5G
Document Type:
Change Request
Organization:
3GPP
Author:
TNO
Target Audience:
5G Network Engineers, Standardization Bodies
Period of validity:
Not specified
Approval Date:
2020-07-16
Amendment Date:
Not specified
Year:
2019
Region / City:
N/A
Subject:
Committee Structure, Strategic Planning, Faculty Review
Document Type:
Report
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Faculty Members
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2025
Region / City:
Garden City, Kansas
Topic:
Electrical Design for Generator Installation
Document Type:
Design Memorandum
Organization / Institution:
City of Garden City
Author:
Wilson & Company
Target Audience:
Electrical contractors, city personnel, engineers
Effective Period:
2025
Approval Date:
May 23, 2025
Date of Last Modification:
N/A
Year:
2013
Region / City:
Monroe, MI
Subject:
Environmental Health
Document Type:
Application
Organization / Institution:
Monroe County Health Department
Author:
Not specified
Target Audience:
Property owners in Monroe County
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
Springfield
Topic:
Homeowners Association (HOA) board meeting
Document Type:
Meeting Minutes
Organization / Institution:
Springfield Addition HOA
Author:
Yolanda Leon (Secretary)
Target Audience:
Homeowners of Springfield Addition HOA
Action Period:
January 25, 2022 and onwards
Approval Date:
January 25, 2022
Amendment Date:
Not specified
Year:
2025
Region / City:
United States
Topic:
Behavioral Health Services, Managed Care
Document Type:
Policy / Reporting Guidelines
Organization / Institution:
OMHSAS (Office of Mental Health and Substance Abuse Services)
Author:
OMHSAS
Target Audience:
Service providers, managed care organizations
Effective Period:
From 01/01/2025
Approval Date:
September 10, 2025
Date of Changes:
July 2025
Note:
Year
Year:
2019
Region / city:
Australia, New Zealand
Theme:
Food Safety, Food Additives
Document type:
Assessment Report
Agency:
FSANZ (Food Standards Australia New Zealand)
Author:
FSANZ
Target audience:
Regulatory bodies, industry professionals, food safety experts
Period of validity:
Ongoing
Approval date:
21 March 2019
Date of changes:
None
Document type:
Change Request
Standardization body:
3GPP
Technical group:
TSG-CT WG1
Meeting:
#141-e
Release:
Rel-18
Category:
B
Work item code:
MCOver5MBS
CR number:
0095
Specification number:
24.581
Current version:
18.1.0
Date:
2023-04-04
Meeting dates:
17–21 April 2023
Source to WG:
TD Tech
Source to TSG:
C1
Affected domains:
Core Network; UICC applications
Affected clauses:
2; 3.3; 9.1.2; 9.X
Related technologies:
5G MBS; MCVideo; RTCP; MBMS
Change reason:
Support of 5G MBS downlink media transmission in MCVideo media plane
Summary of change:
Addition of references, abbreviations, message subtypes, and new control messages for 5G MBS
Consequences if not approved:
Lack of support for 5G MBS in MCVideo media plane
Revision history:
1st, 2nd, 3rd, and 4th changes
Normative references:
3GPP TS/TR and IETF RFC specifications
Year:
2023
Region / City:
TBD
Topic:
Wireless LANs, Power Save Features, UHR
Document Type:
IEEE Standard Proposal
Organization:
IEEE
Author:
Amelia Andersdotter, Carol Ansley, Patrice Desmoulin, Massinissa Lalam, Michael Grigat, Juan Carlos Zuniga, Gaurav Patwardhan, Mark Hamilton, Kurt Lumbatis
Target Audience:
IEEE members, WLAN developers, manufacturers of networking devices
Period of Validity:
2023-2027
Approval Date:
May 2023
Amendment Status:
Proposed, unapproved
Revisions:
Rev 0 based on 11/23-0078r2r1