№ lp_1_2_30823
File format: docx
Character count: 2014
File size: 31 KB
This document provides templates for the planning, design, and implementation of Intune deployment, addressing deployment goals, objectives, challenges, and various configuration profiles.
Year:
2023
Region / City:
Global
Theme:
IT Infrastructure / Deployment
Document Type:
Guide
Author:
Microsoft
Target Audience:
IT administrators, deployment planners
Period of validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2015
Region / City:
Global
Topic:
Network Security, Device Enrollment
Document Type:
White Paper
Organization:
Microsoft Corporation
Author:
Mark B. Cooper
Target Audience:
IT administrators, IT operations engineers, system architects, Microsoft Intune architects
Effective Period:
March 2015
Approval Date:
March 2015
Year:
2026
Region / city:
California
Topic:
Decarbonization, Industrial Facilities
Document Type:
Questions and Answers
Organ / institution:
California Energy Commission (CEC)
Author:
California Energy Commission (CEC)
Target Audience:
Industrial facility operators, project developers, consultants, and other stakeholders in California
Period of validity:
Not specified
Approval Date:
January 23rd, 2026
Date of Changes:
Not specified
Year:
2012
Region / City:
N/A
Theme:
Identity Management, Software Deployment
Document Type:
Deployment Guide
Organization / Institution:
Microsoft Corporation
Author:
Bill Mathers
Target Audience:
Architects, Consultants, System Engineers, System Administrators
Validity Period:
N/A
Approval Date:
June 2012
Date of Changes:
N/A
Year:
2008
Region / City:
Global
Theme:
Data Warehousing
Document Type:
Technical Guide
Organization:
Microsoft Corporation
Author:
Microsoft Corporation
Target Audience:
Data architects, data developers, DBAs, project teams
Effective Period:
Indefinite
Approval Date:
2008
Date of Changes:
N/A
Year:
2023
Region / City:
New York State (NYS)
Theme:
Energy Storage Systems, Interconnection, Utility Practices
Document Type:
Industry Report
Organization:
Interconnection Technical Working Group (ITWG)
Author:
Industry Subgroup of ITWG
Target Audience:
Energy stakeholders, utility companies, developers
Effective Period:
Ongoing
Approval Date:
15 Feb 2023
Date of Updates:
29 Mar 2023, 14 Apr 2023, 13 Jun 2023
Year:
2021
Region / City:
Elk City, Oklahoma
Topic:
Transportation, Infrastructure
Document Type:
Technical Report
Organization:
Oklahoma Transportation
Author:
Office of Research and Implementation, Oklahoma Transportation
Target Audience:
Transportation professionals, highway engineers, government agencies
Period of validity:
N/A
Approval Date:
March 2021
Date of Changes:
N/A
Contextual Description:
Technical report detailing the design and implementation of a Diverging Diamond Interchange (DDI) in Elk City, Oklahoma, part of a broader transportation innovation initiative.
Year:
2021
Region / city:
e-Meeting
Topic:
HST-SFN deployment, MIMO support, TRP transmission, RRC parameters
Document Type:
Meeting Summary
Organization:
3GPP TSG RAN WG1
Author:
Moderator (Intel Corporation)
Target Audience:
Industry professionals and companies involved in 3GPP standards
Period of Action:
2021
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2007
Region / city:
Global
Industry:
Pharmaceuticals
Document Type:
Case Study
Organization:
GlaxoSmithKline
Author:
Not specified
Target audience:
Business professionals in the pharmaceutical and IT industries
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2016
Region / City:
Global
Topic:
Business Intelligence, Power BI
Document Type:
Whitepaper
Author:
Javier Guillén, Melissa Coates
Target Audience:
Business Intelligence professionals, IT Managers, Data Analysts
Period of Validity:
Not specified
Approval Date:
March 2016
Date of Changes:
Not specified
Year:
2011
Region / City:
United States
Topic:
Real Time Location Systems (RTLS) Implementation
Document Type:
Performance Work Statement (PWS)
Organization:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Contractors, Project Managers, IT Professionals, Veterans Affairs Personnel
Period of Action:
Not specified
Approval Date:
November 17, 2011
Modification Date:
December 9, 2011
Year:
2019
Region / City:
United States
Subject:
Health Connect Deployment and Installation Guide
Document Type:
Guide
Organization / Institution:
Department of Veterans Affairs (VA), Office of Information and Technology (OIT)
Author:
REDACTED
Target Audience:
Stakeholders, support personnel, VA administrators
Period of Validity:
N/A
Approval Date:
June 2019
Revision Date:
June 2019
Year:
2020
Region / City:
United States
Topic:
Software Deployment
Document Type:
Guide
Organization:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
S. Davidson, David Horn
Target Audience:
IT professionals, system administrators, technical personnel in healthcare
Effective Period:
December 2020
Approval Date:
December 2020
Revision History:
12/04/2020, 10/06/2020, 07/21/2020, 05/29/2020
Year:
2020
Region / City:
United States
Topic:
Deployment, Installation, Rollback
Document Type:
Guide
Organization / Institution:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
Technatomy
Target Audience:
Veterans Affairs staff, IT professionals, project stakeholders
Period of Validity:
February 2020 - Ongoing
Approval Date:
02/20/2020
Modification Date:
02/20/2020
Year:
2022
Region / City:
Zoetermeer
Topic:
Rail Interoperability, Technical Assistance
Document Type:
Working Document
Organization:
European Union Agency for Railways, Panteia Consortium
Author:
Panteia Consortium
Target Audience:
Public Authorities, Rail Sector Stakeholders
Period of validity:
2020–2021
Approval Date:
1 February 2022
Date of changes:
N/A
Year:
2021
Region / City:
Wales, United Kingdom
Topic:
Environmental Impact Mitigation and Monitoring
Document Type:
Environmental Report
Author:
Royal HaskoningDHV
Target Audience:
Regulatory Authorities, Environmental Experts, Project Stakeholders
Effective Period:
Phased deployment of Morlais project
Approval Date:
14 June 2021
Amendment Date:
Not specified
Year:
2023
Region / City:
Wisconsin
Theme:
Construction, HMA Pavement, Testing Procedures
Document Type:
Test Method
Organization / Institution:
Wisconsin Department of Transportation (WisDOT)
Author:
Wisconsin Department of Transportation (WisDOT)
Target Audience:
Contractors, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual Description:
Detailed test methods and sampling procedures for HMA PWL QMP projects to ensure quality control during the paving process.
Year:
Not specified
Region / City:
Not specified
Subject:
BioChemUDM, Labels, Relationships
Document Type:
Appendix
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Not specified
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Document type:
Technical approval schedule
Appendix:
Appendix A
Subject area:
Structural design standards
Infrastructure type:
Highway bridges and structures
Standards framework:
Eurocodes and UK National Annexes
Jurisdiction:
United Kingdom
Responsible role:
Designer
Referenced standards bodies:
British Standards Institution, CEN
Applicable disciplines:
Structural engineering
Scope of documents:
Basis of design, actions on structures, concrete structures, steel structures
Revision status:
Revisions current as of 23 July 2024
Validity period:
Various standards valid until 30 March 2028
Superseding standards:
Referenced where applicable
Associated guidance:
CD 350