№ lp_1_2_04094
File format: docx
Character count: 12699
File size: 184 KB
This document provides instructions for the deployment, installation, rollback, and back-out of the Bed Management Solution (BMS) v2.4 for the VA system.
Year:
2020
Region / City:
United States
Topic:
Software Deployment
Document Type:
Guide
Organization:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
S. Davidson, David Horn
Target Audience:
IT professionals, system administrators, technical personnel in healthcare
Effective Period:
December 2020
Approval Date:
December 2020
Revision History:
12/04/2020, 10/06/2020, 07/21/2020, 05/29/2020
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
United States
Topic:
Deployment, Installation, Rollback
Document Type:
Guide
Organization / Institution:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
Technatomy
Target Audience:
Veterans Affairs staff, IT professionals, project stakeholders
Period of Validity:
February 2020 - Ongoing
Approval Date:
02/20/2020
Modification Date:
02/20/2020
Year:
2025
Region / City:
Global
Subject Category:
Cyber Incident Response Management
Document Type:
Playbook
Organisation:
NCC Group
Creator:
NCC Group
Target Audience:
First responders, Service Desk team
Period of Effectiveness:
Annual review
Approval Date:
15/12/2025
Note:
Revision History
Year:
2022
Region / city:
Netherlands
Topic:
Data delivery agreement for reporting agents
Document type:
Agreement
Organization / institution:
European Central Bank (ECB), De Nederlandsche Bank (DNB)
Author:
Arjan Bos, Ronald Damhof, Roland Hommes, Iris Balemans, Wim Goes, Vincent Jungen
Target audience:
Reporting agents
Effective period:
2016–2022
Approval date:
May 18, 2016
Date of changes:
September 2022
Author:
Bill Ruggirello
Email:
[email protected]
Device:
NanoVNA V2 PLUS4 v2.4
Firmware version:
git-20201013-32077fd
Document type:
Technical manual
Manual version:
0.56
Subject area:
RF measurement instruments
Instrument type:
Vector Network Analyzer
Intended audience:
Beginners and new users
Scope:
Operation and functions of NanoVNA V2 PLUS4 v2.4
Coverage:
Calibration, measurement principles, menus, traces, markers, time domain operation, and firmware
Source type:
Instructional and reference documentation
Year:
2023
Region / City:
Galway
Topic:
Data Protection, Privacy, GDPR
Document Type:
Template
Organization:
University of Galway
Author:
Not specified
Target Audience:
Project owners, researchers, data protection officers
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
N/A
Subject:
Image quality assessment, color accuracy, FADGI standards
Document Type:
User Manual
Institution:
N/A
Author:
Lei Helehe
Target Audience:
Users of OpenDICE
Period of Validity:
N/A
Approval Date:
N/A
Revision Date:
N/A
Year:
2023
Region / City:
N/A
Topic:
MARC to BIBFRAME conversion
Document type:
Process documentation
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Library professionals, cataloging staff
Effective period:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2004
Software Version:
CPRS GUI v.24
Patch:
OR3.0190
System:
Veterans Health Information Systems and Technology Architecture (VistA)
Document Type:
Technical Setup Instructions
Audience:
IRM and clinical staff responsible for CPRS configuration
Parameters Updated:
ORWDX WRITE ORDERS LIST, ORWOR WRITE ORDERS LIST, ORWOR CATEGORY SEQUENCE
Menu Entry Added:
PSH OERR
Sequence Numbers:
53, 68
Location in GUI:
Between Inpatient Medications and Outpatient Medications
Date Created:
March 2004
Year:
2020
Region / City:
United States
Topic:
Deployment, Installation, Rollback
Document Type:
Guide
Organization / Institution:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
Technatomy
Target Audience:
Veterans Affairs staff, IT professionals, project stakeholders
Period of Validity:
February 2020 - Ongoing
Approval Date:
02/20/2020
Modification Date:
02/20/2020
Year:
2022
Region / city:
United States
Topic:
Healthcare IT, System Deployment
Document Type:
Guide
Organization / Institution:
Department of Veterans Affairs, Office of Information and Technology (OIT)
Author:
BAH, Liberty IT Solutions
Target Audience:
IT professionals, healthcare system administrators, stakeholders in the Veterans Affairs system
Period of validity:
Ongoing, version-specific
Approval Date:
April 2022
Modification Date:
Not specified
Description:
This guide provides a detailed plan for the deployment, installation, and rollback of the Bed Management Solution (BMS) v2.11 for the VA system, including roles, responsibilities, system requirements, and timelines.
Note:
Year
Context:
Overview of Building Management System (BMS) specifications and its components, including hardware, software, and functions. Describes how to approach the BMS specifications and includes integration and point lists for system development.
Note:
Year
Job Title:
Senior Biomedical Scientist (BMS) (Haematology Dept)
Band:
AFC Band 7
Responsible To:
Blood Science Deputy Laboratory Manager
Accountable To:
Blood Science Deputy Laboratory Manager
Section/Department/Directorate:
Haematology / Blood Science / Pathology, Clinical Support & Specialist Services
Location:
Pathology, NDDH
Working Hours:
37.5 hours per week plus night and weekend working
Service Provision:
24 hours per day, 7 days per week
Team Context:
Lead role within a team of 13 staff
Specimen Volume:
Approximately 1100 specimens daily
Specialist Areas:
Haematology, Blood Transfusion, Sickle Cell & Thalassaemia Screening, Haemoglobinopathies, Thrombophilia
Regulatory Compliance:
ISO 15189, UKAS, MHRA, BSQR, NICE guidelines
Laboratory Information System:
Epic/Beaker (Haematology module)
Reporting Structure:
Reports to Blood Sciences (Deputy) Manager
Key Relationships:
Medical staff, Nursing staff, Consultant staff, Clinical Service Managers, NHS Trust staff, General public, Trade representatives
Core Responsibilities:
Diagnostic analysis, quality control validation, staff supervision and training, specialist testing management, blood product provision, emergency response coordination
Committees Represented:
Pathology Health and Safety Committee, Pathology Training Committee, Pathology Quality Committee
Year:
2020
Institution:
BBA/FIA and BMS Programs
Semester:
II, IV, VI
Region / Campus:
Not specified
Type of Document:
Academic Timetable
Subjects Included:
Cost & Management Accounting, Statistics for Business Decisions, Corporate Accounting, Managerial Economics, Financial Management, Human Resource Management, Macroeconomics, Research Software Package, Forensic Analysis & Fraud Investigation, Investment Banking & Financial Services, Distribution & Supply Chain Management
Teachers:
Listed per course
Class Times:
9:00-17:30 with lunch breaks
Days of Week:
Monday to Saturday
Format:
Detailed hourly schedule for lectures, labs, and library sessions
Target Audience:
Students of BBA(FIA) and BMS programs
Effective Date:
01-01-2020
Course Codes:
Provided per subject
Location:
Not explicitly stated
Contextual Resources:
Library hours and newspaper hour included
Structured Activities:
Labs, tutorials, and sports sessions
Includes:
Semester-wise separation of courses, teacher assignments, and room allocations
Year:
2026
Institution:
University of Twente, BMS-EBMS
Authors:
Francesca Frittella, Niels Pulles, Barbara Kump, Engin Topan, Dennis Prak, Derya Demirtas
Target audience:
BMS teaching staff
Document type:
Guidelines and template
Subject:
Artificial intelligence in student assignments
Period of applicability:
2026 academic year
Email for support:
[email protected]
Key policies referenced:
Article 6.7 Student Charter, BMS Examination Board rules on scientific misconduct
Year:
2022
Region / City:
Munich, Germany
Topic:
Industrial Electronics, Battery Management Systems
Document Type:
Product Announcement
Organization / Institution:
Panasonic Industry Europe
Author:
Michael Renner, Product Manager
Target Audience:
Engineers, Technical Specialists, Industrial Designers
Specifications:
1,500V/20mA, MOSFET output, 5-pin DIP5 package, low control and leakage current, through-hole and surface-mount options
Applications:
Battery storage systems, charging stations, high voltage measurement and infrastructure control
Lifetime:
Unlimited switching cycles if used according to specifications
Publication Date:
September 2022
Note:
Year
Subject:
Building Management Systems
Document Type:
Technical Specification