№ lp_1_2_11479
File format: docx
Character count: 8315
File size: 35 KB
The document provides specifications for the installation of foundation drainage systems in NCA projects, detailing materials, procedures, and requirements for construction and quality control.
Note:
Year
Document Type:
Specification
Target Audience:
Contractors, Engineers
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2013
Region / City:
Long Beach, CA
Topic:
Maintenance and repair of medical equipment
Document Type:
Cooperative Agreement
Agency:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Contractors, healthcare system providers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2019
Region / City:
Stafford, VA
Subject:
Annual Workplace Evaluations
Document Type:
Request for Information (RFI)
Agency:
Department of Veterans Affairs
Author:
Antionette Collins-Somerville
Target Audience:
Contractors, Service-Disabled Veteran-Owned Small Businesses, Veteran-Owned Small Businesses
Contracting Office:
National Cemetery Administration, Department of Veterans Affairs
Period of Action:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2013
Region / City:
Long Beach, CA
Topic:
Medical Equipment Maintenance and Repair
Document Type:
Cooperative Agreement / Contract
Organization:
Department of Veterans Affairs (DVA)
Author:
Department of Veterans Affairs
Target Audience:
Contractors, Vendors, Government Agencies
Period of Performance:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / City:
Stafford, VA
Topic:
Market Research, Contracting Opportunities
Document Type:
Request for Information (RFI)
Organization / Institution:
Department of Veterans Affairs
Author:
Antionette Collins-Somerville
Target Audience:
Contractors, Vendors
Period of Action:
TBD
Approval Date:
10-17-2016
Amendment Date:
None
Year:
2026
Region / City:
New Orleans
Topic:
Digital Divide, Information and Communication Technology
Document Type:
Call for Papers
Organization:
Partnership for Progress on the Digital Divide (PPDD)
Author:
Susan Kretchmer
Target Audience:
Researchers, policymakers, practitioners
Period of Action:
Until March 31, 2025
Approval Date:
N/A
Date of Last Revision:
N/A
Year:
2026
Region / City:
New Orleans, Louisiana
Theme:
MOVE/MENTS in Communication
Document Type:
Call for Papers / Conference Announcement
Organization / Institution:
Religious Communication Association
Author:
James W. Vining, Ph.D.
Target Audience:
Scholars, Students, Practitioners in Religious Communication
Start Date:
November 18, 2026
End Date:
November 22, 2026
Submission Deadline:
March 25, 2026
Format:
Individual Papers, Paper Sessions, Panel Discussions, Scholar-to-Scholar Sessions
Awards:
RCA Student Paper of the Year Award, Donald P. Cushman Award
Affiliation:
National Communication Association
Year:
2021
Region / City:
Northern Cancer Alliance
Topic:
Gastrointestinal referral pathway
Document Type:
Medical Referral Guidelines
Organization / Institution:
Northern Cancer Alliance
Author:
Unknown
Target Audience:
Healthcare professionals, primary care providers
Period of Validity:
Ongoing
Approval Date:
1st July 2021
Modification Date:
Not specified
Year:
2018
Region / City:
Eatontown, NJ
Topic:
Digital Mail Handling Services for Veterans Affairs
Document Type:
Request for Information (RFI)
Organization:
Department of Veterans Affairs, Technology Acquisition Center
Author:
Lana Farber, Contract Specialist
Target Audience:
Companies providing COTS mail handling solutions
Effective Period:
Until February 23, 2018
Approval Date:
February 23, 2018
Date of Revisions:
N/A
Year:
2024
Region / City:
Juba, Republic of South Sudan
Topic:
Supply of Non-Food Items and WASH Products
Document Type:
Request for Quotation
Contracting Authority:
Norwegian Church Aid South Sudan Programme
Author:
Taban Charles
Target Audience:
Suppliers of Non-Food Items and WASH Products
Period of Validity:
60 days from closing date
Date of Approval:
29/2/2024
Date of Changes:
N/A
Year:
2026
Region / City:
North of Scotland
Topic:
Healthcare, Cancer Treatment
Document Type:
Job Description
Organization:
NHS Grampian
Author:
NHS Grampian
Target Audience:
Healthcare Professionals, Pharmacists
Period of Validity:
Permanent Contract
Approval Date:
Not Specified
Date of Changes:
Not Specified
Year:
2023
Region / City:
United States
Subject:
Construction, Gypsum Board, Interior and Exterior Finishing
Document Type:
Technical Specification
Organization / Institution:
National Construction Association (NCA)
Author:
NCA Technical Committee
Target Audience:
Contractors, Architects, Engineers
Applicable Standards:
ASTM C11, C475, C840, C954, C1002, C1047, C1177, C1280, C1325, C1396, C1658, D3273
Materials:
Mold and moisture-resistant gypsum boards, glass-mat panels, cementitious backing boards, recycled content panels
Fasteners and Accessories:
Steel screws, corner beads, edge trim, control joints, laminating adhesives
Environmental Requirements:
Biobased material compliance, moisture and mold resistance, sustainable design criteria
Installation Guidelines:
Wall, ceiling, and partition applications, single-ply and two-ply assemblies, high-humidity and wet areas
Finishing Levels:
Level 5 for public areas, Level 2 for utility areas, Level 1 for concealed areas
Repair Procedures:
Patching, replacement, and refinishing per ASTM C840 and fire-resistance requirements
Year:
N/A
Region / city:
United States
Theme:
Contact information for various land management programs
Document type:
Contact list
Organization / institution:
Bureau of Land Management (BLM)
Author:
N/A
Target audience:
BLM employees, land management professionals
Period of validity:
N/A
Approval date:
N/A
Amendment date:
N/A
Note:
Year
Organization:
NCA
Document Type:
Email Template
Audience:
Coaches attending NCA Camp
Purpose:
Pre-camp communication and team preparation
Platform Mentioned:
BAND App
Roles Mentioned:
Head Instructor, Camp Manager, First Aid Staffer
Preparation Tasks:
Team questionnaire completion, app registration
Feedback Reference:
Previous camp feedback integration
Event:
NCA Camp
Year:
2023
Organization:
Department of Veterans Affairs, Veterans Experience Office
Region:
United States
Document Type:
Survey Script
Target Audience:
Individuals contacting the National Cemetery Administration call center
Survey Method:
IVR (Interactive Voice Response)
Purpose:
Measure customer experience with call center interactions
Questions:
7 structured rating questions
Survey Timing:
Within one week after initial call
Data Collection Compliance:
Paperwork Reduction Act of 1995, Title 38 USC
Participation:
Voluntary
Response Handling:
Includes options to complete survey or opt out
Follow-up Authorization:
VA database access for service recovery or feedback follow-up
Year:
2026
Organization:
European Medicines Agency (EMA)
Document Type:
Account Request Form
Target Audience:
NCA Staff
Purpose:
Request access to PSUR Repository
Data Protection Compliance:
Directive 2001/83/EC, Regulation (EC) No 726/2004, Regulation (EC) No 45/2001
Contact Email:
[email protected]
Instructions:
Fill personal and work information, specify account use and user type, agree to ECD policy
Year:
2018
Region / city:
Wales
Topic:
Sustainable Drainage Systems (SuDS), Surface Water Management
Document Type:
Guidance
Organ / institution:
Pembrokeshire County Council
Author:
Not specified
Target audience:
Developers, planners, and environmental officers
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Jurisdiction:
Wales
Topic:
Surface water drainage and sustainable drainage systems
Document type:
Drainage statement form
Regulatory framework referenced:
Statutory Standards for Sustainable Drainage Systems (Welsh Government, 2018)
Planning context:
Planning application supporting document
Applicable development threshold:
Construction area greater than 100 m2
Responsible authority:
Monmouthshire County Council
Maintenance responsibility:
SuDS Approval Body adoption for developments serving two or more properties
Referenced standards and guidance:
CIRIA SuDS Manual (C753); BRE Digest 365; BS EN 16941-1:2018; Planning Policy Wales TAN15 (March 2025)
Source links:
Monmouthshire County Council SAB guidance
Year:
2023
Region / city:
Unalakleet, Alaska
Topic:
Climate change, permafrost degradation, drainage networks, coastal erosion, subsidence, resilience planning
Document type:
Technical Report
Organization / institution:
NASA DEVELOP, National Renewable Energy Lab (NREL), University of Georgia, University of Alaska Fairbanks, Woodwell Climate Research Center, University of Connecticut
Authors:
Ian Lee, M. Jaweed Nazary, Clara Maxwell, Daniel J. Marsden, Dr. Marguerite Madden, Dr. Franz Meyer, Dr. Simon Zwieback, Dr. Anna Liljedahl, Dr. Chandi Witharana, Sarah Payne
Target audience:
Researchers, policy makers, environmental scientists, local community planners
Period of validity:
2017 – 2023
Approval date:
August 11th, 2023
Date of changes:
Not specified
Year:
2015
Region / City:
Danville, IL
Subject:
Construction and drainage corrections at Danville National Cemetery
Document Type:
Solicitation
Agency / Organization:
Department of Veterans Affairs (VA), National Cemetery Administration (NCA)
Author:
Marilyn L. Rodriguez
Target Audience:
Small Business Contractors, SDVOSB Firms
Validity Period:
Until September 11, 2015
Approval Date:
N/A
Modification Date:
N/A
Year:
2022
Region / City:
West Side, Township
Theme:
Stormwater management, infrastructure upgrade
Document Type:
Project proposal
Organization / Institution:
Neglia Engineering Associates
Author:
Township of West Side
Target Audience:
Local government officials, engineering professionals
Period of Validity:
Until completion of the project
Approval Date:
Nov 2022
Modification Date:
N/A