Prescriptive technical standard defining design, materials, installation, testing, and approval requirements for fire suppression systems within university housing and dining facilities under applicable national and institutional codes.
Organization:
Housing and Dining Facilities
Institution:
Colorado State University
Division:
Division 21 – Fire Suppression
Document Type:
Facilities design and installation standard
Subject Area:
Fire suppression systems
Applicable Codes:
IBC, IFC, NFPA 13, NFPA 14, NFPA 20, NFPA 24, NFPA 25, NFPA 72
Referenced Standards Bodies:
UL, FM Global, ANSI, ASME, ASTM
Geographic Location:
Fort Collins, Colorado
Authority Having Jurisdiction:
CSU Facilities Management Fire Systems Group; Poudre Fire Authority; FM Global
System Types Covered:
Wet sprinkler systems, dry systems, pre-action systems, standpipe systems, fire pumps
Materials Requirements:
Steel piping, grooved couplings, listed valves, prohibited CPVC piping
Installer Qualifications:
NICET Level II and Level III or Fire Protection Engineer
Manufacturer Qualifications:
Minimum five years of documented similar service
Testing Requirements:
Hydrostatic testing at 200 psi with witnessed inspection
Approval Process:
Shop drawings and installations subject to FM Global, PFA, and CSU review
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
30 January 2026
Location:
Lavrio, Greece
Type of document:
Press release
Organizations:
CSG N.V., Hellenic Defence Systems S.A.
Subject:
Establishment of Hellenic Ammunition S.A. joint venture
Key personnel:
Jiří Schönweitz (Managing Director, MSM Greece), Christoforos Boutsikakis (CEO, Hellenic Defence Systems)
Industry:
Defence and ammunition manufacturing
Investment:
Up to €50 million committed by CSG
Workforce:
Current 120 employees, planned expansion to ~300 by end of 2026
Production:
Large-calibre ammunition, 155 mm shells, TNT, base bleed grain propellant
Contract duration:
25-year managerial control of Lavrio site by MSM
Technology:
Modernisation and expansion of production capacities
Website:
www.czechoslovakgroup.com
Year:
Not specified
Region / City:
Not specified
Subject:
Fire suppression system commissioning
Document Type:
Technical Specification
Organization / Institution:
USACE
Author:
Not specified
Target Audience:
Contractors, Commissioning Agents, USACE Personnel
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2021
Region / City:
United States
Topic:
Fire Protection Systems
Document Type:
Technical Specification
Organization / Institution:
NFPA
Author:
Not specified
Target Audience:
Engineers, Contractors, Technical Specialists
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Section Number:
21 08 00
Division:
21 – Fire Suppression
Document Type:
Technical Specification
Project Context:
Construction
Related Sections:
01 00 00 General Requirements; 01 91 00 General Commissioning Requirements; 01 33 23 Shop Drawings, Product Data, and Samples
Responsible Parties:
Contractor; Commissioning Agent (CxA); VA; COR
Subject:
Commissioning of Fire Suppression Systems
Scope:
Inspection, Testing, Functional Performance Testing, Documentation, Training
Applicable Systems:
Fire Suppression Systems including Clean Agent Systems
Process Components:
Pre-Functional Checklists; Contractor Tests; Systems Functional Performance Testing; Training of VA Personnel
Issuing Organization:
Department of Veterans Affairs (VA)
Author:
ABC
Registration Number:
123
Degree:
MS Mechanical Engineering
Institution:
National University of Sciences and Technology
School:
School of Mechanical & Manufacturing Engineering
Department:
Department Name
Supervisor:
XYZ
Place:
Islamabad
Date:
January, 2017
Document Type:
Master’s Thesis
Sections Included:
Declaration, Plagiarism Certificate (Turnitin Report), Copyright Statement, Acknowledgements, Abstract, Table of Contents, References
Key Words:
Vibratory Stresses, Forced Response Analysis, Magneto Mechanical Material Coating
Study Focus:
Numerical computation of aerodynamic loads and finite-element analysis of turbine blade vibration
Organization:
White Rock Fire Rescue
Department:
Fire Department
Document type:
Operational guidance
Subject:
COVID-19 impact mitigation for fire suppression training
Version:
1
Date:
May 19, 2020
Applicable activities:
Fire suppression training and departmental operations
Key components:
Self-assessment and screening; Physical distancing; Hand hygiene; Face touching avoidance; Enhanced cleaning; Additional measures
Appendices:
Influenza Symptom Chart; Hand Washing Procedure; Employee Screening Form; Respirator Instructions; Risk Assessment Tool
Target audience:
Members of White Rock Fire Rescue
Implementation responsibility:
Individual department
Year:
2020
Region / City:
Waikato
Topic:
Fire Safety, Building Consents
Document Type:
Compliance Schedule
Agency / Institution:
Waikato Council
Author:
Not specified
Target Audience:
Building consent applicants, fire safety system installers
Effective Period:
Ongoing
Approval Date:
2020-05-06
Amendment Date:
2019-07-13
Year:
2026
Region / City:
Stoystown, PA, USA
Subject:
Fire suppression water storage systems
Document Type:
Product guide specification
Organization / Institution:
Highland Tank & Mfg. Co., Inc.
Author:
Highland Tank & Mfg. Co., Inc. Engineering Department
Target Audience:
Architects, Engineers, Contractors
Standards Referenced:
CSI MasterFormat 2014, AASHTO, AISC, ANSI, ASME, ASTM, AWS, AWWA, IBC, NEC, NEMA, NFPA, NSF, OSHA, PEI, SSPC, STI, UL
Model:
02000HGSWHDFPTBDCSI64
Application:
Underground water storage for fire suppression
Construction Requirements:
Bottom drain pipe, anti-vortex plate, single-wall steel, NSF/ANSI Standard 61 compliance
Submittals Required:
Shop drawings, product data, structural calculations, manufacturer certification, warranty documentation
Manufacturing Location:
United States of America
Installer Qualifications:
Minimum 5 years experience in installation of similar tanks
Note:
Year
Equipment Type:
Automatic Fire Suppression Systems
Applicable Standards:
NZS 4541:2020, NZS 4515:2009, AS ISO 14520:2023, etc.
Year:
2025
Region / City:
Global
Topic:
Fire Suppression, Electrical Safety, PV Systems
Document Type:
Course Overview
Organization:
EON Reality Inc.
Author:
EON Reality Inc.
Target Audience:
Technicians, Engineers, Safety Professionals
Period of Validity:
N/A
Date of Approval:
N/A
Date of Modifications:
N/A
Year:
2026
Region / City:
USA, Blue Springs, MO
Subject:
Fire suppression system design and installation
Document Type:
Technical specification
Organization / Institution:
FIKE Corporation
Author:
FIKE Corporation Engineering Department
Target Audience:
Engineers, installers, fire safety personnel
Applicable Standards:
NFPA 750, NFPA 70, NFPA 72, NFPA 20, FM Approval Guide
System Capacity:
Machinery spaces and turbine enclosures up to 162,801 ft³
Installation Requirements:
Full mechanical and electrical installation, pump skid, control panel, detection devices, alarms, pipework, and fittings
Testing and Maintenance:
FM-approved, annual inspections required
Insurance Requirements:
Minimum $2,000,000 liability and completed operations insurance
Operational Features:
Single detector release, automatic detection and control, interface with fire alarm systems
Submission Requirements:
Design drawings, hydraulic calculations, sequence of operations, approvals from AHJ and insurance underwriter
Context:
Technical specification providing detailed engineering, installation, and operational requirements for a FM-approved DuraQuench water mist fire suppression system, including standards, contractor qualifications, system capacities, and submission obligations.
Document type:
Scientific research article
Research field:
Stem cell biology and regenerative medicine
Main topic:
Molecular mechanisms of somatic cell reprogramming
Key molecule:
SMAD6
Signaling pathway:
TGF-β/BMP signaling pathway
Biological process:
Oocyte extract–induced cellular reprogramming
Cells studied:
Human skin fibroblasts (HSFs)
Induced cell type:
Induced multipotent stem cells (IMS)
Key pluripotency markers:
OCT4, NANOG
Experimental approach:
Transcriptomic analysis and functional validation
Materials used:
Fish oocyte extract, human skin fibroblasts
Cell culture conditions:
DMEM/F12 medium with 10% fetal bovine serum, 37°C, 5% CO₂
Author:
Wei-Wen Fan; He-Ling Yuan; Ying Zhang; Xi-Long Zhao; Qiang Wang; Xue-Feng Bai; Xing-Hua Pan; Xiang-Qing Zhu
Author contribution note:
Wei-Wen Fan, He-Ling Yuan, and Ying Zhang contributed equally
Correspondence:
Xiang-Qing Zhu; Xing-Hua Pan
Institution:
The Basic Medical Laboratory of the 920th Hospital of Joint Logistics Support Force of PLA
Laboratories:
The Transfer Medicine Key Laboratory of Cell Therapy Technology of Yunnan Province; The Integrated Engineering Research Center of Cell Biological Medicine of State and Regions
City:
Kunming
Province:
Yunnan Province
Country:
China
Research objective:
Investigation of gene expression dynamics and signaling regulation during fish oocyte extract–induced reprogramming of human somatic cells
Year:
2024
Region:
Eswatini, Shiselweni
Subject:
Arbitrary detention, student activism, human rights violations
Document type:
Urgent action / advocacy alert
Institution:
Amnesty International
Individual concerned:
Menzi Bongeka Bhembe
Age:
26
Occupation:
University student, activist
Legal framework:
Suppression of Terrorism Act 2008
Date of arrest:
January 16, 2024
Detention period:
Over two years
Calls to action deadline:
August 9, 2026
Target audience:
International human rights supporters
Related events:
Assassination of lawyer Thulani Maseko (2023), convictions of pro-democracy MPs Mduduzi Bacede Mabuza and Mthandeni Dube (2024)
Communication channels:
Email and postal addresses for Eswatini officials and UN mission
Year:
2026
Institution:
University of Cape Town
Document type:
Form
Purpose:
Request for suppression of dissertation from Open Access
Target audience:
Masters candidates
Submission platform:
PeopleSoft
Approval authorities:
Supervisor, Head of Department, Dean of Faculty, Chair of Law Ethics Committee, DVC
Suppression reasons:
Publication pending, Commercialisation, Intellectual property/patent pending, Sensitive content, Copyright of images, Other
Suppression periods:
6 months, 12 months, 24 months, 2 years, up to 3 years, for the natural life of a subject or student
Required attachments:
Neutralised abstract, supporting documents for suppression reason
Year:
2023
Region / city:
Messina, Turin
Subject:
Smoking, Rumination, Thought suppression, Emotion regulation
Document type:
Research article
Organization / institution:
University of Messina, University of Turin
Author:
Patrice Rusconi, Francesca Ales, Luciano Giromini, Agata Andò
Target audience:
Academic researchers, mental health professionals
Period of validity:
N/A
Date of approval:
N/A
Date of changes:
N/A
Year:
2026
Region / City:
Portland, Oregon, USA
Topic:
Fire Protection Systems
Document Type:
Technical Specification
Organization / Agency:
Port of Portland
Author:
Engineering Department
Target Audience:
Designers and contractors working on Port of Portland projects and PDX tenants
Period of Validity:
Current project implementation
Approval Date:
Not specified
Related Sections:
210553 – Identification for Fire Suppression Piping and Equipment
Standards Referenced:
MSS, UL, FM
Note:
Year
Region / City:
Colorado
Topic:
Driver Testing and Education Regulations
Document Type:
Regulation
Authority:
Department of Revenue, Division of Motor Vehicles
Target Audience:
Certified Commercial Driving Schools, Basic Operator Skills Testing Organizations, Certified Employees
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / City:
Fort Morgan, Colorado
Topic:
Paving and Surface Treatment Projects
Document Type:
Request for Bids
Organization:
City of Fort Morgan, Streets Department
Author:
Jim Willis, Streets Superintendent
Target Audience:
Contractors, Bidders
Period of Action:
2025
Approval Date:
Not specified
Amendment Date:
Not specified
Issue date:
January 22, 2026
Closing date:
February 20, 2026, 4:00pm MT
Year:
2026
Region / City:
El Paso County, Colorado
Theme:
Enterprise Resource Planning Implementation
Document Type:
Request for Proposal
Organization / Institution:
El Paso County, Colorado
Author:
El Paso County Government
Target Audience:
Potential bidders for ERP implementation
Period of Action:
January 22, 2026 – February 20, 2026
Approval Date:
January 22, 2026
Amendment Date:
February 20, 2026
Region:
Colorado
Jurisdiction:
State of Colorado
Document type:
Procedural guidance
Subject:
Educator identification numbers
Programs and systems:
Educator Identification System (EDIS)
Responsible organizations:
Colorado Department of Education (CDE); Charter School Institute (CSI)
Participating entities:
Public schools; charter schools
Target audience:
School data submissions contacts; school administrative staff
Scope:
Assignment and update of educator identification data
Data elements referenced:
Name; date of birth; gender; SSN
Submission method:
EDID templates via Google Drive
Processing timeframe:
Typically 1–2 business days
Applicability period:
Ongoing
Source type:
Administrative process documentation