№ lp_1_2_52676
The document outlines the procedures and requirements for testing and maintaining critical equipment important to risk management in nuclear power plants, with a focus on safety and operational readiness.
Effective Date: January 1, 2023
Program Applicability: IMC 2515 Appendix A
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity
Inspection Bases: See IMC 0308, “Reactor Oversight Process Basis Document,” Attachment 2, “Technical Basis for Inspection Program”
Year: 2023
Region / City: USA
Topic: Nuclear Reactor Safety, Equipment Testing
Document Type: Inspection Procedure
Author: Nuclear Regulatory Commission (NRC)
Target Audience: NRC Inspectors, Nuclear Plant Operators
Effective Period: Ongoing, with updates as needed
Approval Date: January 1, 2023
Last Revision Date: N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.