№ lp_1_32338
Describes a detailed inspection procedure used by the NRC to evaluate significant performance issues in the operation of nuclear reactors, including how to address findings and required corrective actions.
Effective Date: August 24, 2016
PROGRAM APPLICABILITY: 2515B, 2201B
CORNERSTONES: ALL
INSPECTION BASIS: This procedure provides the supplemental inspection response to Action Matrix Column 2 inputs as described in Inspection Manual Chapter (IMC) 0305, “Operating Reactor Assessment Program,” and IMC 0320, “Operating Reactor Security Assessment Program”. The governance provided in this procedure was developed with consideration of the following boundary conditions:
Note: Supplemental inspections will only be done for significant (i.e. greater-than-green) findings and performance indicators (PIs);
Year: 2016
Region / City: Not specified
Topic: Supplemental Inspection Response
Document Type: Inspection Procedure
Agency / Institution: NRC (Nuclear Regulatory Commission)
Author: Not specified
Target Audience: NRC Inspectors, Licensees
Period of Validity: Ongoing
Approval Date: August 24, 2016
Date of Changes: None specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.