№ files_lp_3_process_7_085148
File format: docx
Character count: 3384
File size: 2862 KB
Local consultation results on allowing cycling on Felixstowe Promenade, where nearly two-thirds of respondents voted in favor of lifting the ban.
Year:
2016
Region / City:
Felixstowe
Subject:
Cycling Regulations
Document Type:
Press Release
Organization:
Felixstowe Town Council, Suffolk Coastal District Council
Author:
Felixstowe Forward
Target Audience:
Local Residents
Date of Approval:
May 2016
Date of Changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / City:
Portland
Topic:
Board of Directors Meeting
Document Type:
Meeting Minutes
Organization:
Promenade Towers
Author:
Judy Katzel, Secretary
Target Audience:
Residents, Owners, Board Members
Approval Date:
April 18, 2024
Change Date:
N/A
Relevant Date:
April 18, 2024
Year:
2021
Location:
Port St. Mary
Theme:
Real estate
Document Type:
Property listing
Organization:
Harmony Homes
Author:
Harmony Homes
Target Audience:
Potential buyers
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2015
Region / City:
Felixstowe
Theme:
Youth Forum, Local Projects
Document Type:
Meeting Minutes
Organization / Institution:
Felixstowe Youth Forum, Felixstowe Town Council
Author:
Ben Cooper, Libby Lee, Isaac Smith, Moira Chapman, Jonny Lowdell, Doreen Savage, Lorna Monsen
Target Audience:
Youth Forum Members, Local Community
Period of Validity:
Until the next meeting
Date of Approval:
24th June 2015
Date of Changes:
N/A
Year:
2025
Region / City:
Felixstowe
Topic:
Employment Terms and Conditions
Document Type:
Restructured Employment Agreement
Organization / Institution:
Freightliner Ltd
Author:
Freightliner Ltd, RMT
Target Audience:
Freightliner Employees, Port Train Load Supervisors, Technicians
Effective Period:
From 01 September 2025
Approval Date:
06 October 2025
Date of Changes:
06 October 2025
Job Titles:
Felixstowe Port Rail Operative, Port Train Loading Supervisor
Salary Information:
FPRO, £42,900, PTLS, £48,000
Work Schedule:
40 hours per week, Monday to Friday, plus weekend coverage
Overtime:
Overtime rates for Saturday and Sunday
Leave:
21-23 days for FPRO, 23-25 days for PTLS
Sick Leave:
Paid at 8 hours per day
New Entrants:
75% of the basic rate until fully competent
Pension:
Pensionable Salary
Training:
Mentoring and Development Programs
Restructuring:
Effective 01 September 2025
Annual Leave:
21-25 days, depending on the grade and service years
Year:
2024
Region / City:
Felixstowe, Suffolk
Subject:
Youth Development, Charity, Music, Education
Document Type:
Application Letter
Organization:
Felixstowe Youth Development Group
Author:
David Rowe, Chair of Trustees
Target Audience:
Potential Trustees
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Felixstowe Youth Development Group Policy Number 21 Data Protection (Issue 9 – Revised October 2022)
Year:
2022
Region / City:
Felixstowe
Topic:
Data Protection, Privacy, GDPR
Document Type:
Policy
Organization / Institution:
Felixstowe Youth Development Group
Author:
Shez Hopkins (Project Manager)
Target Audience:
Staff, Volunteers, Trustees, Young People, Parents
Effective Period:
Ongoing, as of October 2022
Approval Date:
18/10/22
Date of Last Revision:
October 2022
Organisation:
Felixstowe Nursery School
Country:
England and Wales
Subject:
Health care and allergy management in early years education
Document type:
Institutional policy
Policy area:
Safeguarding and welfare requirement – health
Target group:
Nursery staff, parents, carers and visitors
Applicable setting:
Early years and preschool education environment
Regulatory references:
Managing Medicines in Schools and Early Years Settings (DCSF, March 2005); Food Information Regulation (2014)
Main risks addressed:
Food allergies, nut allergies, insect stings, animal allergies, anaphylaxis
Key medical treatments referenced:
Adrenalin auto-injectors (Epipen, Jext, Emerade)
Implementation measures:
Healthcare plans, risk assessments, staff training, allergen management procedures
Parent responsibilities:
Provide medical information, medication and emergency contacts
Staff responsibilities:
Allergy awareness, hygiene procedures, supervision of food activities, emergency response
Food safety practice:
Allergen information records and monitoring of snack ingredients
Year:
2023
Region / City:
Felixstowe
Field:
Logistics / Rail Operations
Document Type:
Job Description
Organization / Institution:
Freightliner Group
Author:
Not specified
Target Audience:
Employees in the rail logistics sector
Period of validity:
Indefinite
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2022
Region / City:
Coquitlam
Topic:
Request for Quotation
Document Type:
Form
Author:
City of Coquitlam
Target Audience:
Potential contractors and vendors
Period of Validity:
Until award of contract
Approval Date:
August 18, 2022
Date of Changes:
N/A
Note:
Year
Theme:
Compressed air drying system
Document type:
Product specification
Target audience:
Engineers, manufacturers, and service technicians in the field of compressed air systems
Note:
Year
Year:
2023
Region / City:
Glasgow
Topic:
Active travel, cycling, walking, mobility
Document Type:
Report
Organization / Institution:
Glasgow City Council, Sustrans
Author:
Glasgow City Council, Sustrans
Target Audience:
General public, policymakers, urban planners, residents of Glasgow
Period of Validity:
N/A
Approval Date:
March 2024
Date of Changes:
N/A
Year:
2026
Note:
Region / City
Topic:
Refrigeration, Compressed Air Systems, Air Drying
Document Type:
Technical Specification
Target Audience:
Engineers, Manufacturers, Technicians
Year:
2023
Region / City:
Not specified
Topic:
Refrigeration, Air Drying Systems
Document Type:
Product Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Technical Personnel
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Description:
This document specifies a mechanical refrigerated air drying system, detailing components, features, and technical specifications for the efficient removal of moisture and contaminants from compressed air systems.
Document Type:
Template constitution
Subject:
Governance of a cycling club
Sport:
Cycling
Affiliation:
Cycling Ireland
Governing Body:
Cycling Ireland
Organisational Structure:
Management Committee with elected officers
Membership Categories:
Leisure; Competitive; Supporter
Financial Provisions:
Annual accounts; Treasurer responsibility; Audited statement presented at AGM
Meetings:
Annual General Meeting (AGM); Extraordinary General Meeting (EGM); Management Committee meetings
Policies Included:
Safeguarding Children; Equity Policy; Discipline and Appeals
Disciplinary Authority:
Management Committee
Amendment Procedure:
Majority vote at AGM or EGM
Dissolution Clause:
Assets transferred to Cycling Ireland or a club with similar objectives
Year:
2023
Term:
Term 1 and Term 1 Break
Organisation:
U3A Knox Inc
Program Type:
Cycling class schedule
Region:
Knox, Victoria, Australia
Class Leader:
Heinz Herrmann
Safety Representative:
Gordon Smith
First Aider:
Mary Lewis
Start Time:
8:30am
Locations:
Boronia, Jells Park, Ringwood, Hastings, Braeside Park, Mount Waverley and surrounding areas
Distance Range:
Approximately 35–50 km
Difficulty Levels:
Easy (E), Medium (M), Difficult (D)
Transport:
Bicycle and occasional train travel (MYKI required)
Policy Reference:
Policy, Emergency and General Procedures for all Cycling Classes
Temperature Policy:
Modified at 30–34°C; cancelled above 34°C
Year:
2025
Region / City:
Vancouver, BC, Canada
Theme:
Cyclocross Racing
Document Type:
Event Information
Organizer:
West Coast Cycling, Red Truck Racing
Author:
Ian Parker
Target Audience:
Cyclocross enthusiasts, athletes, and spectators
Period of Validity:
September 21st, 2025
Date of Approval:
N/A
Date of Changes:
N/A
Event Date:
September 21st, 2025
Event Type:
Cyclocross Race
Registration Deadline:
September 20th, 6:00 PM
Registration Fees:
$60.00 for Adults, $30.00 for Youths
License Required:
Yes
Weather Contingencies:
Event cancellation possible due to weather
Refund Policy:
Entry fee refunded (minus processing fee) if event is cancelled
Technical Document:
Vanier Tech Document
URL for Results:
https://results.wimsey.co/2025/
Age Categories:
U13, U15, U17, U19
One-Day License:
$25 for adults, $5 for youth
Numbers and Chips:
Required for race participation
Registration Confirmation:
Starts at 8:30 AM
Event Regulations:
Participants race within their ability category
Context:
Event information and registration details for the 2025 Vanier Park cyclocross race, including entry fees, weather contingencies, and registration procedures.
Year:
2022–2023
Region / City:
New South Wales, Australia
Event Type:
Track Cycling Competitions
Organizer:
AusCycling NSW
Document Type:
Commissaire Appointment Schedule
Roles:
PCP, Reserve Commissaires
Event Dates:
Nov 19th 2022 – Mar 19th 2023
Included Championships:
U9–U13, U15–U18, Elite & Para, Masters
Additional EOI Instructions:
Provided for post-appointment submissions
Target Audience:
Cycling commissaires and event organizers
Events Covered:
Tamworth Track Carnival, Central West Track Open, GP Sprint Rd 2 & 3, Shimano Sydney Thousand, Illawarra Track Open, Goulburn Track Carnival, Bowral Cup, Trek Sydney Cup
Year:
2025
Region / City:
Not specified
Topic:
BiSn-Based Low-Temperature Soldering Process
Document Type:
Project Statement
Organization / Institution:
INEMI
Author:
Not specified
Target Audience:
Participating INEMI members
Period of Validity:
Not specified
Approval Date:
February 18, 2025
Date of Changes:
Not specified
Project Budget:
US$1,000 per company
Task Distribution:
Participating companies will allocate 8 hours per month
Intellectual Property:
Disclosures required by INEMI Intellectual Property Policy
Data Access:
Restricted to project participants
Note:
Document Type
Project Statement for INEMI project
Form Reference:
FORM OV 4
Document Type:
Risk Assessment Form
Activity:
Offsite Visits – Cycling
Scope:
Road Cycling and Off-Road / Mountain Biking
Purpose:
Identification of hazards and control measures for cycling visits
Establishment:
To be completed by establishment
Visit Leader:
To be specified
Activity Leader:
To be specified
Assessment by:
To be specified
Approval:
Approved by designated person (position to be specified)
Relevant Guidance:
HCC Policy for the Management of LOtC and Offsite Visits (Section 16 – Good Practice Requirements)
Referenced Awards:
British Cycling Ride Leadership Award; UK Coaching 1st4sport Level 2 Award in Instructing Cycle Training; Cycling UK Group Leader Award; British Schools Cycling Association Off Road Leader Award; MIAS Level 1–3 Awards; Cycling UK Mountain Bike Trail Leader Award; British Cycling Mountain Bike Leader Awards
Supervision Ratio:
1:8 (maximum group size 12 plus supervisors)
Key Risk Areas:
Leadership competence; participant inexperience; separation from group; equipment safety; traffic hazards; unsuitable terrain; public interaction; emergencies; weather conditions
Control Measures:
Defined leadership roles; competence checks; route planning; equipment inspection; structured supervision; participant briefings; emergency procedures; alternative plans (Plan B); Late Back arrangements