№ files_lp_3_process_7_090540
File format: docx
Character count: 1708
File size: 22 KB
This document is a special provision issued by CDOT for use on construction projects, detailing revisions to Section 105 of the Standard Specifications for Road and Bridge Construction.
Note:
Year
Subject:
Road and Bridge Construction Specifications
Document Type:
Special Provision
Author:
CDOT Project Development Branch
Target Audience:
CDOT Construction Project Managers and Contractors
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Year:
2026
Region / City:
Colorado
Topic:
Environmental Regulations
Document Type:
Standard Provision
Agency / Institution:
Colorado Department of Transportation (CDOT)
Author:
Construction Engineering Services Branch, CDOT
Target Audience:
Contractors, Engineers
Period of Validity:
Ongoing
Approval Date:
2026
Amendment Date:
Not specified
Year:
2015
Region / city:
Colorado
Theme:
Stormwater Management
Document type:
Guidelines
Agency / institution:
Colorado Department of Transportation (CDOT)
Author:
CDOT
Target audience:
Local agencies and project applicants
Period of validity:
2015
Approval date:
02/23/2015
Amendment date:
N/A
Year:
2017
Region / City:
Fort Collins, Colorado
Topic:
Autonomous vehicles, road safety
Document Type:
Press release
Organization / Institution:
Colorado Department of Transportation (CDOT)
Author:
Amy Ford, Jared Fiel
Target Audience:
General public, transportation professionals
Period of Action:
2017
Date of Approval:
August 18, 2017
Date of Changes:
N/A
Year:
2026
Agency:
Colorado Department of Transportation (CDOT)
Document Type:
Standard Special Provision
Subject:
Escrow of Proposal Documentation (EPD)
Applicable Projects:
CDOT construction projects meeting specified criteria
Instructions Issued By:
Project Development Branch, CDOT
Approval:
Standards and Specifications Unit, Project Development Branch, CDOT
Scope:
Revisions to Section 103 of Standard Specifications for Road and Bridge Construction
Contractor Requirements:
Submission of EPD for bids over $200,000
Storage:
Banking institution or bonded document storage facility
Examination:
Authorized representatives of Engineer and Contractor
Return Conditions:
After resolution of all claims, disputes, and final contract payment
Year:
2015
Region / City:
Colorado
Topic:
Water Quality, Environmental Management
Document Type:
Interim Program Guidance
Author:
Colorado Department of Transportation (CDOT)
Target Audience:
CDOT staff, Environmental Managers, Region Planning and Environmental Managers (RPEMs), Water Pollution Control Managers (WPCMs), and relevant stakeholders
Period of Effect:
2014-2015
Approval Date:
April 21, 2014
Date of Changes:
Ongoing updates as of January 2015
Year:
2023
Region / city:
Colorado
Theme:
Subrecipient Monitoring
Document type:
Report
Organization:
Colorado Department of Transportation (CDOT)
Author:
CDOT Staff
Target audience:
Subrecipients, Project Managers, CDOT Staff
Period of validity:
From November 30, 2023, ongoing
Approval date:
November 30, 2023
Date of amendments:
November 30, 2023
Year:
2023
Region / City:
Colorado
Topic:
Environmental Mitigation
Document Type:
Application Form
Organization / Institution:
Colorado Department of Transportation (CDOT)
Author:
Amber Williams
Target Audience:
Project applicants for CDOT-funded environmental projects
Duration:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
Colorado
Topic:
Environmental Product Declarations in Construction
Document Type:
Standard Special Provision (SSP)
Issuing Organization:
Colorado Department of Transportation (CDOT)
Author:
CDOT Construction Engineering Services Branch
Target Audience:
Construction contractors and engineers working on CDOT projects
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Date
Contextual description:
Flowchart for the concurrence process and checklist for local agencies in Colorado Department of Transportation projects.
Note:
Year
Subject:
Materials Documentation and Testing
Document Type:
Flowchart
Organization / Institution:
CDOT
Context:
This document outlines a flowchart for CDOT materials documentation and testing procedures, detailing steps for coordination, approval, and final documentation distribution.
Year:
2026
Region / City:
Colorado, USA
Subject:
Road and Bridge Construction Specifications
Document Type:
Standard Special Provision
Agency / Organization:
Colorado Department of Transportation (CDOT)
Author:
Project Development Branch, CDOT
Target Audience:
Contractors and Engineers on CDOT construction projects
Scope of Application:
Projects with less than 5000 tons of Hot Mix Asphalt (HMA)
Revision Section:
106
Materials Covered:
Hot Mix Asphalt, In-place Density, Volumetric Verification, Stability Testing
Approval Date:
2026
Instructions for Use:
Mandatory use as written, no modifications without formal approval
Testing Requirements:
Process Control Testing, Acceptance Testing, Stability Verification, Mix Verification
Compliance:
Conformance with CDOT Standard Specifications for Road and Bridge Construction
Year:
Not specified
Region / State:
Colorado
Country:
United States
Thematic Area:
Road and bridge construction standards
Document Type:
Standard Special Provision
Issuing Organization:
Colorado Department of Transportation
Responsible Unit:
Construction Engineering Services Branch
Related Standard:
Standard Specifications for Road and Bridge Construction
Applicable Work Type:
Drilled shaft construction and caisson or directional boring in high density utility corridors
Applicable Section Revisions:
Section 107.06; Section 503.02
Project Applicability:
CDOT construction projects with 503 Drilled Shaft Pay Items
Safety Classification:
Safety critical work
Contractor Responsibility:
Protection and stability of existing structures, utilities, and facilities during drilled shaft installation
Submittal Requirements:
Details and procedures for protecting existing structures and facilities during drilled shaft installation
Year:
2023
Region / City:
Colorado
Topic:
Asphalt Cement Cost Adjustment
Document Type:
Special Provision
Issuing Organization:
Colorado Department of Transportation (CDOT)
Author:
CDOT Project Development Branch
Target Audience:
Contractors, Engineers, CDOT staff
Period of Application:
Ongoing
Approval Date:
2023
Date of Changes:
Not specified
Year:
2022
Region / City:
Arvada, Colorado
Topic:
Civil Engineering, Construction, City Standards
Document Type:
Checklist
Organization:
City of Arvada
Author:
City Engineering Department
Target Audience:
Civil Engineers, Contractors, Project Developers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Document Type:
Technical Requirements
Organization / Institution:
OGS
Year:
2023
Region / City:
N/A
Topic:
Technical Drawings
Document Type:
Guidelines
Organization / Institution:
OGS
Author:
N/A
Target Audience:
OGS Design and Construction Teams, Consultants
Period of Validity:
N/A
Approval Date:
02/14/11
Revision Date:
01/03/23
Year:
2026
Region / City:
United States / Deer Park, WA
Topic:
Construction, Wall Assembly Systems
Document Type:
Guide Specification
Organization / Institution:
Knight Wall Systems, Inc.
Author:
Not specified
Target Audience:
Specification writers, engineers, construction professionals
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Contextual description:
Guide specification for a thermally broken rainscreen attachment system with details on components, design requirements, performance standards, and submittal procedures.
Year:
2025
Region / City:
Las Vegas
Theme:
Casino Promotion
Document Type:
Marketing Event Announcement
Organization:
STRAT Hotel, Casino & Tower
Author:
STRAT Marketing Team
Target Audience:
True Rewards Club Members
Period of Action:
December 28, 2025 – January 31, 2026
Approval Date:
Not specified
Amendment Date:
Not specified
Document Type:
Certification and approval form
Subject:
Signing Strategy Drawings
Related Authority:
National Roads Authority
Approving Body:
Transport Infrastructure Ireland (TII)
Involved Parties:
Sign Designer, Local Authority, TII Signs Approvals Section
Sections:
Scheme Details; Designers Certification; Local Authority Check; TII Approval; Schedule of Signing Strategy Drawings
Purpose:
Certification, checking, and approval of signing strategy drawings
Associated Information:
Scheme name, contract type, client details, key scheme dates, drawing numbers, revisions, signatures and dates
Intended Users:
Sign Designers, Local Authority representatives, TII officials
Geographical Scope:
Road schemes under the National Roads Authority and TII