№ files_lp_4_process_2_52113
File format: docx
Character count: 1224
File size: 48 KB
Version:
01.0
Date:
23 February 2024
Description:
Initial publication.
Decision Class:
Regulatory
Document Type:
Form
Business Function:
A6.4 activity cycle
Keywords:
A6.4 mechanism, A6.4 projects, host party, project implementation
Context:
A form outlining the transition request process for CDM activities to the Article 6.4 mechanism under the UNFCCC.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Note:
Region / City
Theme:
Sewage Pump Station, Switchboard Testing
Document Type:
Technical Specifications
Author:
Jason Cumming, Technical Standards Coordinating Group
Target Audience:
Engineers, Technicians
Approval Date:
16/05/2022
Date of Amendments:
May 2022
Year:
2022
Region / City:
Monaco
Topic:
Geospatial Information, Producer Codes
Document Type:
User Manual
Organization:
International Hydrographic Organization
Author:
International Hydrographic Organization
Target Audience:
Data producers, organizations involved in geospatial information, maritime navigation agencies
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2017
Region / City:
Arlington, Texas
Theme:
World Literature, Cross-Cultural Issues
Document Type:
Syllabus
Institution:
University of Texas at Arlington
Author:
Joul Layne Smith
Target Audience:
University Students
Period of Action:
Fall Semester 2017
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2017
Region / City:
Mexico
Topic:
Solar Energy, Emission Reduction
Document Type:
Methodology
Organization / Institution:
Joint Crediting Mechanism (JCM)
Author:
Joint Committee
Target Audience:
Project developers, environmental stakeholders
Period of Validity:
Ongoing
Approval Date:
29 December 2017
Revision Date:
None
Country:
Nepal
Institution name:
Ministry of Forests and Environment
Institution address:
Singha Durbar, Kathmandu, Nepal
Representative of the institution:
Dr. Maheshwar Dhakal
E-mail address of the representative:
[email protected]
Phone number of the representative:
+977- 01-4211586
Note:
Additional representative (optional)
Additional representative of the institution:
Mr. Hari Prasad Sharma
E-mail address of the additional representative:
[email protected]
Phone number of the additional representative:
+977- 01-4211586
Is your country a Party to the Paris Agreement?:
Yes
Has your country prepared, communicated, and is it maintaining a Nationally Determined Contribution (NDC) in accordance with Article 4, paragraph 2 of the Paris Agreement?:
Yes
Has your country designated a Designated National Authority (DNA) for the Article 6.4 mechanism and communicated that designation to the UNFCCC secretariat?:
Yes
Economic Growth and Green Investments:
Participation in the Article 6.4 mechanism facilitates access to international carbon markets, attracting green investments into sectors such as renewable energy, waste management, and forestry. These projects not only reduce emissions but also create jobs, promote local enterprises, and spur technological innovation.
Social Inclusion and Equity:
Projects implemented under this mechanism often prioritize the inclusion of vulnerable groups, including women and marginalized communities.
Environmental Protection:
Many projects focus on enhancing ecosystem resilience and biodiversity. Reforestation, afforestation, and sustainable land-use projects contribute to carbon sequestration, while also addressing issues like soil erosion and water scarcity.
Capacity Building and Technology Transfer:
Engaging with the Article 6.4 mechanism provides Nepal with access to international expertise and technologies.
National Prerogative in Defining Sustainable Development:
Nepal retains the sovereign right to define what constitutes sustainable development within its national context.
Renewable Energy Development:
Solar, wind, hydropower, and bioenergy projects to increase access to clean energy and reduce dependence on fossil fuels.
Energy Efficiency Improvements:
Industrial energy efficiency programs to lower emissions in manufacturing and processing sectors.
Sustainable Land Use and Forestry:
Afforestation, reforestation, and forest management projects to enhance carbon sequestration.
Agriculture and Waste Management:
Climate-smart agricultural practices to reduce methane and nitrous oxide emissions.
Transport Sector Projects:
Electric vehicle infrastructure and sustainable public transportation systems.
Adaptation and Resilience Co-benefit Projects:
Activities that integrate climate adaptation with mitigation, such as water resource management linked with energy or forestry projects.
Year:
Not specified
Region / City:
Not specified
Topic:
Waste heat recovery
Document Type:
Methodology
Organization / Institution:
Joint Crediting Mechanism
Author:
Not specified
Target Audience:
Not specified
Effective Period:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2023
Document Type:
Implementation Guide
Project Name:
UCC AN-PN-TS
Document Version:
0.1.0
Authors:
Not specified
Approvals:
Yves Arys (Project Manager D&A / Business Analyst D&A), Charles Poncin (Business Analyst D&A), Yann Philippe (Service Manager ICT)
Intended Audience:
Economic Operators, Customs Authorities, IT and Business Analysts
Key Topics:
Re-export notifications, REN invalidation, message flow, technical and business validation, message codes
Document History:
Draft created on 31/03/2023
Distribution:
Internal project stakeholders
Applicable Systems:
Customs IT systems, Temporary Storage procedures
Message Standards:
IE570, IE614, IE522, IE525, IE557, IE561, IE571, IE609, IE906, IERN928
Validation Rules:
Technical validation (XSD, format), Business validation (EORI, write-off, code lists)
Year:
2018
Region / Country:
Vietnam
Subject:
Greenhouse gas emission reduction in industrial kilns
Document type:
Approved methodology
Organization:
Joint Crediting Mechanism
Author:
Joint Committee
Target audience:
Project developers and stakeholders in industrial emission reduction
Effective period:
From 29 August 2018
Version:
01.0
Methodology:
Installation of tunnel and shuttle kilns with waste heat recovery system
GHG types:
CO2
Emission sources:
Natural gas consumption of reference kilns
Calculation approach:
Net supplied heat quantity recovered and CO2 emission factor
Monitoring parameters:
Supplied air quantity pre-heated, Annual average temperature of combustion air entering kiln
Year:
Not specified
Region / City:
Not specified
Topic:
Health and Safety Compliance under CDM Regulations
Document Type:
Checklist/Guideline
Organization / Institution:
Thames Water
Author:
Not specified
Target Audience:
Thames Water project teams and contractors
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Year
Topic:
Construction Health & Safety
Document Type:
Guidance
Organization / Institution:
Thames Water
Target Audience:
Construction Managers, Contractors, Designers
Year:
2023
Region / City:
European Union
Subject:
Social Security
Document Type:
Guideline
Organization:
European Commission, DG EMPL A4, EESSI BA
Author:
European Commission, DG EMPL A4, EESSI BA
Target Audience:
EESSI community members
Period of validity:
Not specified
Approval Date:
26/05/2023
Date of Changes:
26/05/2023
Note:
Date
Description:
Document outlining the requirements for a construction phase plan under the Construction (Design and Management) Regulations 2015, focusing on safety and planning.
Year:
N/A
Region / City:
N/A
Topic:
Clinical Decision Making
Document Type:
Worksheet
Organization / Institution:
N/A
Author:
Kien Dang, Susanna Talarico
Target Audience:
Medical educators, clinical examiners
Period of validity:
N/A
Approval Date:
N/A
Date of modifications:
N/A
Note:
Context
Jurisdiction:
United Kingdom
Regulatory framework:
Construction (Design and Management) Regulations 2015
Document type:
Guidance
Subject:
Construction phase health and safety management
Project phase:
Construction phase
Key roles:
Client, Designer, Principal Designer, Contractor, Principal Contractor
Scope:
Health and safety arrangements, site rules, specified risks
Referenced schedule:
Schedule 3 of CDM 2015
Annexes:
Annex 1 – Specified Risks
Source type:
Regulatory guidance
Note:
Year
Topic:
Health and safety, CDM regulations
Document type:
Checklist
Target audience:
Principal Designers, Project Managers, Contractors
Year:
2017
Region / City:
Fort Washington, MD
Topic:
Technical Services, Cybersecurity, Strategic Enabling, Advanced Analytics, Technology Investments
Document Type:
Task Order Performance Work Statement (PWS)
Organ / Institution:
United States Air Force
Author:
Not specified
Target Audience:
U.S. Department of Defense personnel and contractors
Effective Period:
Not specified
Approval Date:
6 Sept 2017
Amendment Date:
Not specified
Note:
Job number
Rev:
1
Year:
2015
Topic:
Construction Health and Safety
Document Type:
Report
Target Audience:
Designers, Project Managers, Contractors
Country:
Kuwait
Bank:
Burgan Bank
Document Type:
Banking services information page
Services Covered:
ATM services, Cash Deposit Machines (CDMs), Multi-currency ATM services
Available Languages at ATM:
Arabic and English
Currencies Available (Multi-currency ATM):
USD (US Dollars), KWD (Kuwaiti Dinars)
Access:
24 hours a day, 7 days a week (ATMs and selected branches)
Main Location:
Kuwait International Airport branch
Head Office Location:
Sharq, Kuwait, Abdullah Al Ahmad Street, Block 1, Plot 22
Number of Branches Listed:
29
Branch Working Days:
Sunday to Thursday (most branches), selected variations specified
Branch Working Hours:
Day and evening shifts as specified per branch
Target Audience:
Burgan Bank customers in Kuwait
Year:
2026
Region / City:
Not specified
Topic:
Intrauterine Growth Restriction (IUGR) and prenatal care
Document Type:
Medical Case Study
Author:
Not specified
Target Audience:
Medical professionals (OBGYN, residents, healthcare providers)
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Last Modification:
Not specified
Keywords:
Intrauterine Growth Restriction, prenatal care, obstetrics, maternal health, ultrasound, Doppler, fetal monitoring
Year:
2023
Region / City:
Texas, USA
Topic:
Healthcare Data Integration, OMOP CDM, Epic ETL
Document Type:
Research Paper
Organization / Institution:
University of Texas Southwestern Medical Center, Texas Health Resources
Authors:
Aamirah Vadsariya, Mereeja Varghese, Bhavini Nayee, Jessica Moon, Chaitanya Katterapalli, Clark Walker, Chris Gonzalez, Sonam Sohal, Christoph U. Lehmann, Ferdinand Velasco, Mujeeb Basit, DuWayne Willett
Target Audience:
Healthcare professionals, researchers in healthcare data systems
Period of Action:
2023
Approval Date:
Not specified
Modification Date:
Not specified