№ files_lp_4_process_3_134294
File format: docx
Character count: 15200
File size: 748 KB
Set of official rules for entering a trade promotion lottery including eligibility, prize details, entry method, and administrative procedures.
Year:
2026
Region / City:
Lidcombe and Regents Park, NSW, Australia
Type of document:
Promotion Terms and Conditions
Organizer:
DOOLEYS Lidcombe Catholic Club Limited
Target audience:
Eligible DOOLEYS members aged 18 and over
Promotion period:
16 February 2026 – 29 March 2026
Draw date:
30 March 2026
Prize details:
2 x double passes per venue including food and beverage package, match Parramatta Eels vs West Tigers, Commbank Stadium, total approximate value $2000
Eligibility criteria:
Financial Ordinary, Life, 30-Year, or Provisional members; minimum age 18; not disqualified by Club rules
Entry method:
Purchase of Lion Nathan products at specified venues with valid membership card
Decision authority:
CEO or delegated Club representative
Privacy:
Personal information collected for administration, promotion, and marketing of the Promotion and Club activities
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Organization:
NTMA
Program:
NRL Program
Document type:
Policy guidance
Subject:
Professional boundaries and sexual misconduct prevention
Intended audience:
Adult advisors and volunteers
Scope:
Adult-student interactions
Authority:
NTMA Director of Youth Engagement
Geographic scope:
United States
Context:
Youth education and extracurricular programs
Source type:
Organizational policy and informational guidance
Policy focus:
Sexual misconduct prevention
Year:
2022
Event:
3GPP TSG RAN WG1 #108-e e-Meeting
Date:
February 21 – March 3, 2022
Source:
Moderator (CATT)
Title:
Moderator summary #1 on enhancements of beam management for multi-TRP
Agenda Item:
8.1.2.3
Document Type:
Discussion and Decision
Participants:
Qualcomm, LGE, CMCC, Xiaomi, Lenovo, Motorola Mobility, Intel, TCL, Sony, OPPO, Apple, ZTE, Samsung, MTK, vivo, Spreadtrum, CATTA, FutureWei
Topics Covered:
Beam measurement/reporting, L1-SINR reporting, CSI-RS configuration, TRP-specific BFR, M-TRP beam failure recovery
Standards Referenced:
3GPP 38.214
Document Scope:
Issues and proposals on enhancements for beam management in multi-TRP scenarios
Year:
2023
Location:
Athens, Greece
Subject:
3GPP RAN2 LTM RRC configuration
Document type:
Technical progress report
Organization:
3GPP TSG-RAN WG2
Author:
Ericsson
Intended audience:
RAN2 members, telecom engineers
Meeting number:
121
Discussion topics:
Reference configuration, LTM candidate configuration, RRC procedures, UE actions, configuration application options
Organization:
Illinois Municipal Retirement Fund (IMRF)
Document Type:
Request for Proposal (RFP)
Subject:
Procurement of a multi-factor based U.S. small capitalization equity index provider
Asset Size:
$47.9 billion (as of December 31, 2022)
Geographic Scope:
Illinois, United States
Beneficiary Group:
Employees of local government in Illinois (excluding the City of Chicago and Cook County)
Chief Investment Officer:
Angela Miller-May
RFP Issue Date:
February 17, 2023
Inquiry Deadline:
February 24, 2023
Proposal Submission Deadline:
March 17, 2023
Anticipated Finalist Identification:
By April 21, 2023
Submission Method:
E-mail to [email protected]
Regulatory Context:
Illinois Freedom of Information Act; Illinois Pension Code Section 1-113.21
Services Required:
Delivery of index data, methodology documentation, corporate actions handling, rebalance notifications, performance data, and data to authorized third parties
Contract Term:
No fixed timeline; terminable at IMRF’s discretion
Quiet Period:
February 17, 2023 until selection or conclusion of process
Document Type:
Course Modification Proposal Form
Course Prefix and Number:
ECH 4012
Course Title:
Organizing and Managing the Learning Environment
Academic Level:
Undergraduate
Governing Body:
Undergraduate Curriculum Council
Department:
Teacher Education Program
Institutional Committees:
Department Curriculum Committee; College Curriculum Committee; Office of Assessment
Department Curriculum Committee Chair:
Joanna Grymes
Department Chair:
Ronald Towery
College Dean:
Lance G. Bryant
Undergraduate Curriculum Council Chair:
Mary Elizabeth Spence
College Curriculum Committee Chair:
Wayne Wilkinson
Approval Dates:
February 28, 2020; March 2, 2020; March 8, 2020; March 11, 2020
Proposed Effective Term:
Fall 20
Course Description:
Techniques of classroom management, theories of discipline, and positive behavior guidance; admission to the Teacher Education Program required
Prerequisites:
TE 2013; ECH 2013; ECH 2023; ECH 2033; ECH 3013; ECH 3043; ECH 3053; ECH 3063; ECH 3073; ECH 3083; ECH 3004; RDNG 3203; ELSE 3643
Corequisites:
RDNG 4403; ECH 4013; ECH 4023; ECH 4043
Course Frequency:
Irregular
Modification Details:
Change of prerequisite from ECH 2003 to TE 2013; change of course offering to irregular
Justification:
Course retained from a previous program and maintained in case of licensure changes
Contact Person:
Joanna Grymes ([email protected]
Note:
; 8430)
Year:
2022
Meeting:
3GPP TSG-RAN WG2 #117-e
Meeting Type:
Electronic meeting
Meeting Period:
21 February – 3 March 2022
Agenda Item:
4.1
Document Number:
R2-2203572
Source:
Ericsson (Rapporteur)
Contact Person:
Emre A. Yavuz ([email protected]
Note:
)
Organization:
3GPP TSG-RAN WG2
Topic:
NB-IoT R15, 2 HARQ processes and HARQ RTT timer
Related Documents:
R2-2203480; R2-2203486; R2-2203495; R2-2203496
Document For:
Discussion, Decision
Scope:
Discussion of whether correction is needed and work on the related CRs
Intended Outcome:
Report and revised CRs if needed
Deadline:
24 February 2022 12:00 UTC
Type of Document:
Technical meeting report and discussion paper
Title:
Advanced Energy Design Guide for Multifamily Buildings: Achieving Zero Energy
Document type:
Peer review draft and review form
Series:
Advanced Energy Design Guide (AEDG)
Subject:
Zero energy multifamily building design
Organizations:
ASHRAE; AIA; IES; USGBC; U.S. DOE
Committee:
AEDG-MF Project Committee
Review stage:
90% Technical Refinement Draft
Review period:
February 22, 2020 – March 1, 2020
Submission deadline:
March 2, 2020, 12:00 PM EST
Submission method:
E-mail to [email protected]
Intended audience:
Peer reviewers and technical experts
Status:
Non-consensus document; not an ASHRAE standard or guideline
Contact information required:
Name, company/organization, phone number, e-mail address
Form sections:
General remarks; Specific remarks by chapter and line number
Year:
2026
Organization:
Chichester Cathedral
Position:
Assistant Verger
Location:
Chichester, UK
Application Deadline:
23 February 2026, 9:00am
Interview Date:
2 March 2026
Type of Document:
Job application form
Target Audience:
Job applicants
Requirements:
Right to work in the UK, Disclosure of unspent criminal convictions
Submission Method:
Email to [email protected]
Instructions:
Complete all sections including personal details, referees, education, employment history, supporting statement, and declaration
Year:
2024
Organization:
Diocese of Lansing
Campaign Name:
Diocesan Services Appeal (DSA)
Document Type:
Parish bulletin announcement text
Purpose:
Promotion and coordination of annual diocesan appeal
Announcement Weekend:
February 24 & 25, 2024
Commitment Weekend:
March 2 & 3, 2024
Follow-Up Period:
During active phase of the appeal
Website:
www.dioceseoflansing.org/appeal
Financial Structure:
Parish goal with 50% of funds over goal returned to parish
Audience:
Parish households and parish bulletin readers
Religious Context:
Holy Eucharist and stewardship within the Catholic Church
Included Texts:
2023 DSA Prayer
Year:
2023
Country:
Senegal
City:
Dakar
Institutions:
General Hospital Idrissa Pouye (HOGIP); Main Hospital of Dakar (HPD)
Study Period:
February–March 2023
Type of Document:
Cross-sectional descriptive study
Thematic Area:
Phytotherapy; Traditional Medicine; Oncology; Ethnobotany
Study Population:
Cancer patients over 18 years old undergoing chemotherapy
Sample Size:
102 patients
Departments Involved:
Surgery; ENT
Data Collection Method:
Anonymous questionnaire (Google Form); private interviews
Data Analysis Software:
Microsoft Excel 2016
Identified Plant Species:
37 species across 23 families and 34 genera
Most Represented Plant Family:
Fabaceae
Most Cited Species:
Annona muricata L.; Moringa oleifera Lam.; Petroselinum crispum (Mill.) Fuss; Guiera senegalensis J.F. Gmel
Route of Administration:
Oral
Main Source of Supply:
Market purchase
Keywords:
cancer; medicinal plants; hospital; traditional medicine; HOGIP; Dakar
Year:
2024
Region / Location:
B14, B15, B18, B20, B21, C15, C16, C18, C20
Document Type:
Inventory Record
Subject:
Stock Reconciliation, GRN and SO Entries, Serial Numbers
Organization:
Izhar Warehouse / Logistics
Author:
Inventory Control Team
Date of Record:
28.02.2024–05.03.2024
Corrected Shipment Date:
05.03.2023
Total Stock Counted:
10,455 PCS
Invoices Referenced:
3-00564, 3-01514, 3-01575
Problem Statements Noted:
Label discrepancies MC34/MC90
Action Notes:
Manual tally during absence of Izhar, deletions allowed before GRN confirmation
Year:
2022
Region / City:
Global
Topic:
Wireless communication; CSI reporting enhancements
Document Type:
Meeting report / Technical specification proposal
Organization:
3GPP TSG RAN WG1
Author:
Huawei, HiSilicon (Moderator)
Audience:
RAN1 working group members and participating companies
Meeting Dates:
February 21 – March 3, 2022
Agenda Item:
8.1.4
Proposals:
Further enhancement, correction, editorial changes
Target Release:
Rel-17
Frequency Range:
FR1, FR2
Technologies:
MTRP, FDD, CSI-RS, Type II port selection
Companies Contributing:
Lenovo, Samsung, Vivo, CATT
Year:
2022
Location:
Mitrovica, Kosovo
Event type:
Conference and Workshops
Organizing institution:
University for Business and Technology (UIBM)
Participants:
Professors, researchers, university staff, industry partners
Key topics:
Dual study programs, practice-oriented curriculum, university-industry cooperation
Dates:
28 February – 4 March 2022
Venues:
UIBM campus, Stone Castle Vineyards, Prizren city center
Main speakers:
Prof. Dr. Alush Musaj, Prof. Dr. Behxhet Shala, Prof. Ass. Dr. Albulena Grajçevci, Prof. Dr. Heinrich Schuele, Prof. Dr. Myqerem Tafaj, Dr. Ardita Jahja-Hoxha, MSc. Hafize Veseli, Prof. Dr. Alltane Kryeziu, Prof. Asoc. Dr. Valdet Gjinovci, Prof. Asoc. Dr. Mehush Aliu, Prof. Dr. Dorian Marku
Audience:
University staff, international partners, industry representatives
Year:
2018
Location:
Lisbon, Portugal
Subject:
5G MFCN spectrum synchronization
Document type:
Plenary contribution / Technical proposal
Organization:
European Communications Committee (ECC), CEPT
Author:
GSA
Intended audience:
ECC PT1 members, national administrations
Date issued:
15 February 2018
Period covered:
27 February – 2 March 2018
References:
ECC Report “Analysis of the suitability of the regulatory technical conditions for 5G MFCN operation in the 3400-3800 MHz band”; CEPT Report A to the European Commission
Year:
2022
Event:
3GPP TSG RAN WG1 #108-e e-Meeting
Date:
February 21 – March 3, 2022
Source:
Moderator (CATT)
Document type:
Meeting report
Topic:
Enhancements of beam management for multi-TRP
Agenda item:
8.1.2.3
Purpose:
Discussion and Decision
Companies involved:
QC, LGE, CMCC, Xiaomi, Lenovo, Motorola Mobility, Intel, TCL, Sony, OPPO, Apple, MediaTek, Nokia/NSBB, ZTE, Samsung, DOCOMO, Huawei, HiSilicon, NEC, Spreadtrum, Ericsson
Technical focus:
L1-SINR reporting, L1-RSRP, group-based beam reporting, multi-TRP simultaneous transmission
Reference specifications:
3GPP 38.214 Rel-16 and Rel-17
Consensus points:
Support for single CSI-report, support for multiple beams per pair/group, further study on cross-beam interference
Action items:
Companies to provide preferences and comments on proposals
Meeting type:
e-Meeting, technical discussion
Year:
2023
Event:
3GPP TSG RAN WG1 #112 Meeting
Location:
Athens, Greece
Meeting Dates:
February 27 – March 3, 2023
Organization:
3rd Generation Partnership Project (3GPP)
Working Group:
TSG RAN WG1
Source:
Moderator (NTT DOCOMO)
Agenda Item:
9.1.3.1
Document Identifier:
R1-2301774
Document Type:
Technical discussion and decision contribution
Topic:
MIMO and DMRS enhancements for 5G NR Rel-18
Technical Focus:
Downlink and uplink DMRS port expansion, MU-MIMO support, antenna port indication for PDSCH, S-TRP and M-TRP scenarios
Standardization Context:
5G NR Release 18 study and specification work
Participating Companies Mentioned:
NTT DOCOMO, Qualcomm, ZTE, vivo, Ericsson, Intel, Nokia, Samsung, OPPO, MediaTek, LG, Lenovo, CATT, CMCC, New H3C, Sharp
Subject Area:
Wireless communications standardization and physical layer design