№ lp_2_3_50276
Technical analytical report presenting the integration of TEMBA and GEP 3.0 models to estimate least-cost centralized grid generation, technology mix, investment needs, and associated greenhouse gas emissions for achieving universal electricity access under SDG7.1.1 across Sub-Saharan Africa.
Year: 2023
Organization: World Bank
Initiative: Global Electrification Platform (GEP)
Version: 3.0
Geographical Scope: Sub-Saharan Africa
Country Coverage: 58 countries
Scenarios: 96 scenarios
Thematic Focus: Electrification planning, power generation optimization, greenhouse gas emissions
Related Model: Electricity Model Base for Africa (TEMBA)
Modelling Framework: Open Source Spatial Electrification Tool (OnSSET); Open-Source Energy Modelling System (OSeMOSYS)
Subject: Grid generation cost estimation and emissions associated with SDG7.1.1
Time Horizon: 2018–2040
Target Year: 2030
Indicator: SDG7.1.1 (Universal access to electricity)
Technology Scope: Centralized grid, mini-grids, solar home systems (SHS)
Key Metrics: Levelized Cost of Electricity (LCOE), grid emission factor, technology mix, investment requirements
Carbon Pricing: Inclusion of shadow price of carbon in scenario analysis
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.