№ files_lp_4_process_3_086386
File format: docx
Character count: 399338
File size: 827 KB
Year:
2022
Region / City:
California, USA
Subject:
Generator interconnection and deliverability allocation
Document Type:
Business Practice Manual
Organization / Institution:
CAISO (California Independent System Operator)
Author:
Stephen Rutty
Author’s Title:
Director, Grid Assets
Approval Date:
09/08/2013
Effective Date:
09/08/2013
Last Revision Date:
07/29/2022
Version:
30.0
Revision History:
Detailed updates from Version 1.0 (07/26/2013) through Version 30.0
Target Audience:
Interconnection customers, transmission operators, and CAISO staff
Scope:
Procedures and guidelines for generator interconnection requests, study processes, deliverability allocation, and associated financial and operational requirements
Context:
Chronologically details the steps, requirements, and study processes for connecting generators to the grid, including regulatory compliance, study deposits, interconnection agreements, and deliverability status.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Note:
Region / City
Topic:
Interconnection and Deliverability Allocation Procedures
Document Type:
Business Practice Manual
Organization:
CAISO
Author:
Stephen Rutty
Target Audience:
Interconnection Customers, Grid Operators
Effective Date:
08/28/2013
Approval Date:
08/28/2013
Revision History:
Last revised on 11/24/2020
Date of Changes:
11/24/2020
Version History:
Version 25.0, Version 24.0, Version 23.0, etc.
Interconnection Process:
Detailed Chronological Sequence
Year:
2019
Region / Organization:
CAISO (California Independent System Operator)
Document Type:
Business Practice Manual
Owner / Author:
Stephen Rutty, Director, Grid Assets
Approval Date:
08/28/2013
Effective Date:
08/28/2013
Revision History:
Versions 1.0–19.0 with updates on interconnection processes, deliverability status, study procedures, and energy storage integration
Intended Audience:
Interconnection Customers, Grid Operators, and Transmission Owners
Scope:
Generator interconnection and deliverability allocation procedures under CAISO Tariff Appendix DD
Related Resources:
CAISO Queue, Resource Interconnection Management System (RIMS), Study Tracks
Year:
2025
Region / City:
Southern California
Topic:
Distributed Generation Deliverability
Document Type:
Application
Author:
Southern California Edison
Target Audience:
Distributed Generation Facility Owners, Utility Operators
Period of Validity:
Until April 15, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Description:
Application for deliverability status submission for distributed generation facilities seeking interconnection to investor-owned utility distribution facilities under ISO Tariff Section 40.4.6.3.
Year:
2024
Region / City:
CAISO Controlled Grid
Theme:
Energy Transmission, Interconnection Procedures, Resource Adequacy
Document Type:
Appendix to the CAISO Tariff
Agency / Institution:
CAISO
Author:
Not specified
Target Audience:
Interconnection Customers, Load Serving Entities
Validity Period:
2024-2025
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Contextual Description
Year:
2023
Region / City:
California, US
Subject:
Energy Infrastructure Interconnection, Queue Management
Document Type:
Technical Guidelines / Tariff Commentary
Organization / Institution:
California Independent System Operator (CAISO)
Audience:
Generating Unit Owners, Interconnection Customers, Transmission Operators
Relevant Sections:
Tariff 2525.5.2, Appendix DD 6.7.2.3, Sections 6.7.2.7, 8.9.9, 11.3.2
Deposits and Fees:
$50,000 for repowering requests, $310,000 for modification assessments
Timeline Requirements:
45–60 calendar days for standard assessments, up to 120 days for certain network changes
Modification Types Covered:
Repowering, downsizing, capacity reallocation, deliverability transfers
Associated Agreements:
Generator Interconnection Agreement (GIA), LGIA, SGIA
Deadline Dates:
November 30 for downsizing requests
Assessment Procedures:
Written notice, technical data submission, deposit payment, CAISO response
Year:
2020
Note:
Region / City
Topic:
Interconnection and Deliverability Allocation Procedures
Document Type:
Business Practice Manual
Organization:
CAISO
Author:
Stephen Rutty
Target Audience:
Interconnection Customers, Grid Operators
Effective Date:
08/28/2013
Approval Date:
08/28/2013
Revision History:
Last revised on 11/24/2020
Date of Changes:
11/24/2020
Version History:
Version 25.0, Version 24.0, Version 23.0, etc.
Interconnection Process:
Detailed Chronological Sequence
Year:
2019
Region / Organization:
CAISO (California Independent System Operator)
Document Type:
Business Practice Manual
Owner / Author:
Stephen Rutty, Director, Grid Assets
Approval Date:
08/28/2013
Effective Date:
08/28/2013
Revision History:
Versions 1.0–19.0 with updates on interconnection processes, deliverability status, study procedures, and energy storage integration
Intended Audience:
Interconnection Customers, Grid Operators, and Transmission Owners
Scope:
Generator interconnection and deliverability allocation procedures under CAISO Tariff Appendix DD
Related Resources:
CAISO Queue, Resource Interconnection Management System (RIMS), Study Tracks
Year:
2023
Region / City:
CAISO
Topic:
Interconnection Process, Long Lead-Time Resources, Offshore Wind
Document Type:
Comment Submission
Organization / Institution:
Invenergy
Author:
Invenergy
Target Audience:
Stakeholders in the energy sector, regulatory bodies
Period of Effect:
2023–2027
Approval Date:
N/A
Date of Changes:
N/A
Note:
Audit ID
Regions covered:
North America, NERC compliance
Type of Document:
Compliance Audit Worksheet
Organization:
AT&T
Document type:
Ordering guidelines
Subject:
Access Service Request (ASR) for local interconnection
Version:
70
Geographic scope:
United States (21 states)
Industry:
Telecommunications
Intended users:
Carriers and interexchange customers
Content scope:
ASR ordering options, field descriptions, transport, trunking, billing, contacts, and translation questionnaires
Source type:
Technical and administrative specification
Year:
2025
Region / City:
Southern California
Topic:
Distributed Generation Deliverability
Document Type:
Application
Author:
Southern California Edison
Target Audience:
Distributed Generation Facility Owners, Utility Operators
Period of Validity:
Until April 15, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Description:
Application for deliverability status submission for distributed generation facilities seeking interconnection to investor-owned utility distribution facilities under ISO Tariff Section 40.4.6.3.
Year:
2023
Region / City:
New York State (NYS)
Theme:
Energy Storage Systems, Interconnection, Utility Practices
Document Type:
Industry Report
Organization:
Interconnection Technical Working Group (ITWG)
Author:
Industry Subgroup of ITWG
Target Audience:
Energy stakeholders, utility companies, developers
Effective Period:
Ongoing
Approval Date:
15 Feb 2023
Date of Updates:
29 Mar 2023, 14 Apr 2023, 13 Jun 2023
Year:
2019
Region / City:
Baltimore, Maryland
Topic:
Information Security, Network Interconnection
Document Type:
Agreement
Organization:
Centers for Medicare & Medicaid Services (CMS)
Author:
Centers for Medicare & Medicaid Services (CMS)
Target Audience:
Non-CMS Organizations, CMS IT and Security Personnel
Period of Action:
Ongoing
Approval Date:
August 9, 2019
Amendment Date:
Not specified
Year:
2021
Region / City:
Georgia
Theme:
Energy, Renewable Energy, Regulations
Document Type:
Official Order
Organization:
Georgia Public Service Commission
Author:
Georgia Public Service Commission
Target Audience:
Industry professionals, energy companies, regulatory bodies
Effective Period:
Not specified
Approval Date:
March 11, 2021
Modification Date:
January 13, 2022, April 8, 2022, May 17, 2022
Year:
2023
Region / city:
CAISO
Theme:
Interconnection process improvements
Document type:
Discussion paper
Author:
EDF-R
Target audience:
Stakeholders involved in interconnection process
Period of action:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
202X
Region / City:
Audubon, PA
Subject:
Interconnection Capacity Transfer
Document Type:
Notice of Intent
Organization:
PJM Interconnection, L.L.C.
Author:
Transferor and Transferee
Target Audience:
PJM, Transferor, Transferee, Authorized Representatives
Effective Date:
[Insert Effective Date]
Date of Approval:
[Insert Approval Date]
Date of Changes:
[Insert Changes Date]
Year:
2024
Region / City:
MISO
Topic:
Generator Interconnection
Document Type:
Manual
Organization / Institution:
MISO
Author:
A. Godbole
Target Audience:
Users of MISO tariff and related documents
Effective Period:
Ongoing
Approval Date:
January 22, 2024
Revision Date:
January 22, 2024
Year:
N/A
Region / city:
N/A
Topic:
Power system, wind energy, inverter systems
Document type:
Technical specification
Organization:
N/A
Author:
N/A
Target audience:
Engineers, power system designers
Effective period:
N/A
Approval date:
N/A
Date of amendments:
N/A