№ files_lp_4_process_3_092070
File format: docx
Character count: 2367
File size: 36 KB
Date:
27 January 2026
Region / City:
Melbourne
Topic:
Western Renewables Link Hearing
Document Type:
Hearing Transcript
Organization:
Planning Panels Victoria
Audience:
Community groups, individuals, and stakeholders involved in the hearing
Period of Activity:
27 January 2026
Date of Approval:
27 January 2026
Date of Changes:
None
Contextual Description:
Detailed transcript of the submissions presented at the Western Renewables Link Hearing held on 27 January 2026, including interactions with community representatives.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Issuing body:
Joint Natural Resources Committee
Document type:
Code of Practice
Industry:
Renewable energy, offshore and marine operations
Associated documents:
JNRC Renewables Scope of Work, Marine Warranty Surveyors’ Certificate of Approval Requirements
Initial issue date:
27 May 2021
Latest revision date:
24 February 2025
Versions:
JR2021-028 (Version 1), JR2023-029 (Version 2), JR2025-030 (Version 3)
Scope:
Marine warranty surveying for renewable energy projects including offshore wind, cables, interconnectors and floating offshore wind
Applies to:
Marine Warranty Surveyors, assured parties, underwriters
Key subjects:
Roles and responsibilities, qualifications, communication protocols, Certificates of Approval, conflicts of interest, decommissioning
Year:
2018
Region / city:
New York
Topic:
Renewable energy, Compliance
Document Type:
Guidance Document
Organization:
New York State Energy Research and Development Authority (NYSERDA)
Author:
New York State Energy Research and Development Authority (NYSERDA)
Target Audience:
Load-Serving Entities (LSEs)
Action Period:
Annual
Approval Date:
April 2018
Date of Changes:
N/A
Context:
Guidance document for load-serving entities in New York State, providing detailed instructions on compliance with the Clean Energy Standard (CES), including Renewable Energy Standard (RES) and Zero-Emissions Credit (ZEC) obligations.
Year:
2023
Region / City:
Victoria
Topic:
Environmental Impact Assessment, Aviation Safety
Document Type:
Evaluation Report
Institution:
WVCA
Author:
Not specified
Target Audience:
Stakeholders, regulators, aviation professionals
Period of Validity:
N/A
Approval Date:
N/A
Date of Revisions:
N/A
Year:
2025
Region / City:
Northumberland, North Tyneside, Newcastle upon Tyne
Topic:
Offshore Renewable Energy
Document Type:
Application Form
Organization:
ORE Catapult
Author:
Dylan Hill
Target Audience:
Businesses in offshore renewable energy supply chain
Validity Period:
From 1st July 2025 to 31st March 2026
Approval Date:
April 2025
Date of Revisions:
25.02.2025
Year:
2023
Location:
Edinburgh, Glasgow
Theme:
Renewable Energy, Wind Technology
Document Type:
Job Advertisement
Organization:
Green Cat Renewables
Author:
Green Cat Renewables
Target Audience:
Engineers, Consultants, Job Seekers in Renewable Energy
Application Deadline:
Not specified
Period of Employment:
Full-time, Permanent
Date Published:
Not specified
Description:
Job advertisement for a technical consultant position focused on wind energy at Green Cat Renewables, detailing required qualifications, responsibilities, and benefits.
Type of document:
Request for Proposal (RFP)
Subject:
Off-site renewable energy power purchase agreement
Energy type:
Solar energy / Wind energy
Optional component:
Battery storage (MW / MWh)
Associated products:
Renewable Energy Certificates (RECs)
Contract structure:
Physical PPA / Virtual PPA / Sleeved PPA
Issuing entity:
Procurement Group / Procurement Lead
Participants:
Local governments, companies, non-profits, universities, state entities
Procurement scope:
Up to [XX] MWh of renewable energy
Proposal components:
Cover letter, Executive Summary, Plant Description and Timeline, Pricing Proposal, Financial and Business Experience Summary, Project Team and Experience, Co-benefits, Alternative Proposals
Evaluation basis:
Evaluation Process and Evaluation Criteria
Attachments:
RFP Bid Sheet; Energy Use Data and Load Profiles; Sample PPA or Term Sheet
Year:
2015
Region / City:
California
Topic:
Renewable Energy, Utility Programs
Document Type:
Decision
Agency / Organization:
Public Utilities Commission of the State of California
Author:
Public Utilities Commission of the State of California
Target Audience:
Energy consumers, utility companies, regulatory authorities
Effective Period:
2015
Approval Date:
January 29, 2015
Amendment Date:
None
Year:
2026
Region / City:
California
Subject:
California Renewables Portfolio Standard Program
Document Type:
Decision
Agency / Institution:
Public Utilities Commission of the State of California
Author:
Alice Reynolds, Darcie L. Houck, John Reynolds, Karen Douglas, Matthew Baker
Target Audience:
Public, Stakeholders in Renewable Energy
Effective Date:
January 15, 2026
Expiration Date:
January 25, 2028
Date of Issuance:
January 16, 2026
Decision Number:
26-01-014
Deadline Extension:
January 25, 2028
Year:
2024
Region / City:
Pennsylvania
Topic:
Renewable Energy
Document Type:
Conference Agenda
Organization / Institution:
PA Solar Center
Author:
Ron Celentano, Joe Sherrick, Sharon Pillar, Matt Mahoney, Jacob Finkel, Rob Altenburg, Stephen Roundtree, Abby Rambo, Greg Smith, David Alicea, Mike Gordon, Dennis Rowan, Rachael Griffith, Leo Kowalski, Michael Borgatti, Bobby Hughes, Robert Young, Kurt Princic
Target Audience:
Energy professionals, policy makers, developers, and community leaders
Period of Action:
June 3-4, 2024
Date Approved:
N/A
Date of Changes:
N/A
Year:
2020
Region / City:
Switzerland
Topic:
Renewable energy integration
Document type:
Research proposal
Institution:
Swiss Federal Office of Energy (SFOE)
Authors / Coordinators:
Not specified
Target audience:
Research consortia and energy stakeholders
Period of validity:
Project duration as specified in call
Date of publication:
2020
Research challenge:
Integration of renewables into Swiss energy system
Methodology:
Multi-disciplinary research, demonstration, and pilot projects
Consortium composition:
Universities, research institutions, and industry partners
Expected outcomes:
Innovation in energy systems, policy recommendations, market development
Document Type:
Request for Proposal Template
Subject:
Off-site renewable energy procurement and power purchase agreements
Purpose:
Guidance for developing local government RFPs for renewable energy projects
Target Audience:
Local governments and procurement officials
Organization:
American Cities Climate Challenge Renewables Accelerator
Contributors:
Ali Rotatori; Yuning Liu
Related Locations:
City of Charlotte, NC; City of Cincinnati, OH; City of Denton, TX; City of Houston, TX; City of Philadelphia, PA; District of Columbia
Structure:
Template with sections including project overview, scope of work, procurement schedule, proposal requirements, evaluation criteria, and attachments
Key Topics:
Solar energy; wind energy; battery storage; renewable energy certificates; power purchase agreements
Usage Instructions:
Editable template with placeholders and guidance for customization
Legal Notice:
Disclaimer of warranties and liability for use of template
Version Context:
Includes reference to 2020 COVID-related addendum
Year:
2026
Region:
United Kingdom
Theme:
Energy Management and Renewable Technologies
Document Type:
Service Agreement Annex
Organization:
Demand Management & Renewables (DMR) DPS
Author:
DMR DPS Administration
Target Audience:
Suppliers and energy service providers
Service Areas:
Design and Feasibility, Installation, Servicing and Maintenance, Purchase Only, Decommissioning, End-to-End Service, Policy Delivery
Industry Coverage:
Smart Controls, Bioenergy, Building Management Systems, Carbon Capture, Energy Efficiency, Energy Storage, DSR, Generators, Geothermal, Heat Networks, Heat Pumps, Hydrogen, LED Lighting, Network Management, Net Zero Strategy, Solar Photovoltaic, Building Retrofit, Power Purchase Agreements, Transport, Wind Generation
Policy Areas:
Anaerobic Digestion, District Heating, Heat Pumps, Climate Change, Electricity Transmission and Distribution, EV Charging Infrastructure, Environmental Services, Energy Financing, Gas Transmission and Distribution, Hydroelectric and Marine Technologies, Industrial Energy Efficiency, Fossil Fuel Technologies, Nuclear, Offshore and Onshore Wind, Petrochemical, Solar Photovoltaics, Energy Modelling
Coverage Period:
Ongoing under current DMR DPS Agreement
Document Date:
2026
Year:
2020
Region / City:
San José, California
Theme:
Power Purchase Agreement, Renewable Energy, Storage
Document Type:
Term Sheet
Organization:
San José Clean Energy, Peninsula Clean Energy Authority
Author:
Not specified
Target Audience:
Energy providers, municipalities, project developers
Duration:
Not specified
Approval Date:
2020
Modification Date:
Not specified
Year:
2025
Region / City:
Gahru
Subject:
Rent Agreement Guidelines, Fixed Assets Guidelines
Document Type:
Internal Procedure
Institution / Organization:
AAM Foundation
Author:
Unknown
Target Audience:
Teachers, Property Team, TMs
Effective Period:
March 1, 2025 onwards
Approval Date:
Unknown
Modification Date:
April 24, 2025
Year:
2022
Note:
Region / City
Theme:
Broken Link Management, SharePoint
Document Type:
User Manual
Organization / Institution:
Cognillo
Target Audience:
Users of Cognillo’s SharePoint Broken Link Manager™ tool
Description:
A user manual for managing broken links in SharePoint environments using the SharePoint Broken Link Manager™ tool.
Year:
2026
Region / City:
South Australia
Topic:
Criminal Procedure, Court Hearings
Document Type:
Legal Application
Authority / Institution:
Court of South Australia
Author:
[Full Name of Informant/Appellant]
Target Audience:
Legal professionals, Court personnel
Period of validity:
[Enter Date of hearing]
Approval Date:
[Enter Date of Approval]
Date of amendments:
[Enter Date if applicable]
Employer:
Herts Young Homeless (hyh)
Job title:
Dual Diagnosis Family Link Worker
Employment type:
Fixed-term full-time contract
Contract end date:
28 February 2023
Working hours:
37 hours per week
Salary range:
£20,600–£24,205
Location:
Hatfield Office with countywide travel
Annual leave entitlement:
25 days per annum
Pension scheme:
hyh pension scheme with matched contributions up to 3%
Additional benefits:
Group Life Insurance Scheme
Managing role:
Early Intervention Manager
Client group:
Children and young people aged 10–18 and their families
Service focus:
Mental health, substance misuse, family mediation, homelessness prevention
Disclosure requirement:
Enhanced Criminal Records Bureau disclosure
Maximum caseload:
12 families
Document type:
Job description and person specification
Sector:
Charity and youth homelessness services
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Meeting dates:
21–29 March 2022
Meeting format:
Virtual/Online
Document type:
Draft recommendation
Source reference:
AWG-29/OUT-25
Technical scope:
Fixed Wireless Service link performance under wind conditions
Frequency range discussed:
Millimetre-wave band
Related document:
APT Report No. APT/AWG/REP-81
Annexes:
Attenuation model under wind condition; compensation techniques; link budget evaluation
Date:
29 March 2022
Year:
2020
Region / city:
Northern Ireland
Topic:
Fisheries Management, Legislation, Environmental Conservation
Document Type:
Meeting Minutes
Organization:
Department of Agriculture, Environment and Rural Affairs (DAERA)
Author:
Edward Montgomery (Chair), Fiona Lavery, Seamus Connor, Art Niven, others
Target Audience:
Forum members, stakeholders in fisheries and environmental management
Period of Action:
2020 and ongoing
Approval Date:
17 June 2020
Date of Changes:
None mentioned
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Document number:
AWG-29/INP-58
Meeting date:
21–29 March 2022
Document date:
14 March 2022
Meeting format:
Virtual/Online
Submitting organization:
Huawei Technologies Co., Ltd.
Document type:
Working document / proposal
Subject:
Fixed wireless system link performance under wind conditions
Related document:
APT Report No. APT/AWG/REP-81
Frequency range:
Millimetre-wave (85.5 GHz)
Geographical scope:
Asia-Pacific region
Technical focus:
Antenna vibration, wind-induced attenuation models
Context:
Technical working document of a regional telecommunication standardization body outlining proposed models, measurements, and analytical approaches for assessing wind-induced degradation of fixed wireless system link performance.