№ lp_1_2_34503
File format: docx
Character count: 22434
File size: 2205 KB
This Project Assessment Report evaluates the applications for relicensing of the Sizewell A and B sites to facilitate the transfer of land between the two nuclear sites for the purpose of constructing Sizewell C Power Station.
Year:
2024
Region / city:
Sizewell A, Sizewell B
Subject:
Nuclear Site Licensing
Document Type:
Project Assessment Report
Organization:
Office for Nuclear Regulation
Author:
Unknown
Target Audience:
Nuclear industry professionals, regulatory authorities
Period of validity:
Ongoing until de-designation direction by the Secretary of State
Approval Date:
24 July 2024
Amendment Date:
None
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Sizewell
Topic:
Nuclear Site Inspection
Document Type:
Report
Organization:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector
Target Audience:
Regulatory bodies, stakeholders in nuclear safety
Period of Validity:
1 April – 30 June 2025
Approval Date:
July 2025
Amendment Date:
N/A
Year:
2025
Project:
Sizewell C
Report Type:
Project Assessment Report
Organization:
Office for Nuclear Regulation
Dutyholder / Applicant:
Sizewell C Limited
Document ID:
ONRW-2019369590-9296
Publication Date:
February 2025
Licence Condition:
LC 13(2)
Nuclear Site Licence Effective Date:
7 May 2024
NSC Establishment:
Preliminary 2017, Shadow 2019
Assessment Period:
2020–2024
Recommendation:
Approval of ToR for NSC
Year:
2025
Region / City:
Sizewell
Topic:
Nuclear Safety Inspections
Document Type:
Regulatory Report
Agency / Organization:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector
Target Audience:
Public, Regulatory Stakeholders
Period of Validity:
January – March 2025
Approval Date:
May 2025
Date of Last Update:
N/A
Year:
2024
Region / City:
Sizewell B
Subject:
Nuclear site inspections, regulatory activities
Document Type:
Regulatory report
Organization / Institution:
Office for Nuclear Regulation
Author:
Nominated Site Inspector, Head of Operating Reactors
Target Audience:
Members of Sizewell SSG, public
Period of Validity:
1 September – 31 December 2024
Approval Date:
January 2025
Modification Date:
Not specified
Year:
2023
Region / City:
Sizewell B
Topic:
Nuclear safety inspection report
Document Type:
Regulatory report
Organization / Institution:
ONR (Office for Nuclear Regulation)
Author:
Nominated Site Inspector
Target Audience:
Public, stakeholders of Sizewell SSG
Period of Validity:
January 1, 2023 – March 31, 2023
Approval Date:
June 2023
Date of Modifications:
None
Year:
2024
Region / city:
Sizewell
Topic:
Nuclear regulation, inspection
Document Type:
Report
Agency / institution:
Office for Nuclear Regulation (ONR)
Author:
ONR Nominated Site Inspector
Target audience:
Public, stakeholders, regulatory professionals
Period of validity:
January 1 – March 31, 2024
Approval date:
April 2024
Modification date:
N/A
Year:
2026
Region / City:
Clatsop, Tillamook, Marion, Polk, Yamhill Counties, Oregon
Topic:
Meal Sites and Delivery Services
Document Type:
Service Listing
Organization:
Various Senior Centers and Community Centers
Target Audience:
Seniors and community members in Oregon
Period of Validity:
2026
Approval Date:
2026
Date of Changes:
N/A
Description:
A detailed list of meal sites and delivery services for seniors and community members across various counties in Oregon, including information on congregate dining times, delivery areas, and contact details for each location.
Year:
2012
Region / City:
Global
Topic:
SharePoint Server 2013, Test Lab Guide
Document Type:
Technical Guide
Organization / Institution:
Microsoft Corporation
Author:
James Morey
Target Audience:
IT professionals, system administrators, and developers
Period of validity:
Not specified
Approval Date:
July 2012
Date of updates:
April 2013
Description of Changes:
Updated instructions, links, and simplifications
Context:
Technical guide for configuring an intranet and team sites environment using SharePoint Server 2013 in a test lab scenario.
Year:
2023
Region / City:
California
Topic:
Stormwater Pollution Prevention
Document Type:
Template
Organization / Institution:
California Stormwater Quality Association (CASQA)
Author:
CASQA
Target Audience:
Qualified Stormwater Pollution Prevention Plan Developers (QSDs)
Period of Validity:
2022 Construction Stormwater General Permit
Approval Date:
2023
Date of Modifications:
Not specified
Year:
2025
Region / city:
N/A
Topic:
Intramuscular injection techniques
Document type:
Tip sheet
Organization / institution:
ClinicalKey for Nursing
Author:
Perry, A. G., LaPlante, N., Ostendorf, W. R., & Potter, P. A.
Target audience:
Healthcare professionals
Effective period:
N/A
Approval date:
N/A
Modification date:
N/A
Document type:
Application form
Regulatory authority:
South African Health Products Regulatory Authority (SAHPRA)
Country:
South Africa
Subject:
Additions and/or changes in investigators and clinical trial sites
Document number:
GLF-CEM-CT-01D
Related form:
CTF3
Version:
v4
Date of first approval:
October 2019
Date of latest update:
September 2022
Update history:
October 2019 first version approved; March 2020 administrative changes; September 2022 administrative changes, checklist update, appendix removal, document number change
Applicable actions:
Additional investigator(s); Change of investigator(s); Additional site(s); Change in site location
Required attachments:
Cover letter; Investigator documents; Site staff documents; Proof of payment
Approval bodies referenced:
Ethics Committee(s)
Intended applicant:
Sponsor, CRO, or local sponsor company
Regulated area:
Clinical trials
Note:
Year
Note:
Year
Organization / institution:
Newcastle College
Context:
A set of security duties and responsibilities for personnel working at Newcastle College campuses, outlining the expectations for behavior, procedures, and emergency actions.
Year:
2025
Region / city:
Muswellbrook
Theme:
Planning and development
Document type:
Planning proposal
Organ / institution:
Muswellbrook Shire Council
Author:
Sharon Pope, Muswellbrook Shire Council; Luke Fanayan, Department of Planning, Housing and Infrastructure
Target audience:
Local government, public agencies
Period of action:
2025
Approval date:
02/06/2025
Date of amendments:
Not specified
Year:
2023
Region / city:
Tunisia
Topic:
Renewable Energy, Solar Projects, Energy Transition
Document type:
Terms of Reference
Organization:
World Bank, Ministry of Industry, Mines, and Energy (MIME)
Author:
World Bank
Target audience:
Government of Tunisia, Technical Consultants
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Reference:
FOI 3217
Date:
9 January 2025
Organisation:
Bedfordshire Hospitals NHS Foundation Trust
Sites covered:
Bedford site; Luton site
Subject:
Electronic Document Management Systems
EDMS in place:
Yes
EDMS systems:
Evolve; Mediviewer
Deployment years:
2012; 2019
Contract review date:
Third quarter of 2026
Exemption applied:
Section 40 – personal information
Legislation referenced:
Freedom of Information Act 2000; Re-use of Public Sector Information Regulations 2015
Review process:
Internal review and complaints process available within three months
Review contact:
[email protected]
Issuing role:
FOI Officer
Year:
Not specified
Region / City:
Florida, USA
Document Type:
Guidance / Procedural Document
Agency:
Florida Department of Environmental Protection (FDEP)
Target Audience:
Site managers, professional engineers, professional geologists, property owners
Legal References:
Chapter 62-780, Florida Administrative Code (F.A.C.)
Attachments:
Attachment 5 – Technical Checklist, Attachment 7 – Sample Letter, Attachment 8 – Affidavit of Title
Scope:
Conditional closure and institutional control procedures for petroleum-contaminated sites
Responsible Roles:
Site Manager, District Program Administrator, Tallahassee Environmental Administrator, PRSR
Review Requirements:
Technical, legal, title verification, and IC package approval
Year:
2025
Region / City:
Rotherham Metropolitan Borough Council
Subject:
Biodiversity Net Gain
Document Type:
Guidance
Organization:
Natural England
Target Audience:
Applicants, council officers
Date Approved:
July 2025
Date of Changes:
Not specified
Year:
Not specified
Region / City:
Not specified
Topic:
Ethics, Research, Clinical Trials
Document Type:
Report Form
Organ / Institution:
Parkway Independent Ethics Committee (PIEC)
Author:
Not specified
Target Audience:
Research investigators, ethics committee members
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2024
Region / city:
USA
Topic:
Environmental Protection / Remediation
Document type:
Guidelines
Agency:
EPA
Author:
Environmental Protection Agency (EPA)
Target audience:
Environmental professionals, project managers, contractors
Period of validity:
Ongoing
Approval date:
Not specified
Date of amendments:
Not specified