№ lp_1_2_04348
File format: docx
Character count: 2550
File size: 18 KB
This document provides instructions for testing companies on the new procedures for submitting backflow assembly test reports electronically to Backflow Solutions, Inc (BSI) in the Village of Niles, including associated filing fees and requirements.
Year:
2018
Region / City:
Village of Niles
Topic:
Backflow Testing, Compliance
Document Type:
Notice
Organization / Institution:
Backflow Solutions, Inc (BSI)
Author:
Chrissy Bloom
Target Audience:
Testing Companies
Effective Period:
From February 1, 2018
Approval Date:
Not specified
Date of Changes:
March 1, 2018
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Date of Document:
November 9, 2023
Meeting Date:
November 16, 2023
Meeting Time:
7:30 PM
Location:
Niles Town Hall, 5923 New Hope Road, Moravia, New York 13118
Municipality:
Town of Niles
State:
New York
Country:
United States
Governing Body:
Town of Niles Planning Board
Supervising Official:
Joan Jayne
Council Members:
Clarence Edmonds; Bernard Juli; Joseph MacDuffee; Steven Cuddeback
Highway Superintendent:
Roger Slater
Town Clerk:
Tina Weed
Town Justice:
Larry Comeau
Town Assessor:
Dana Merizzi – Cayuga County Real Property Services
Town Code Enforcement:
J. Patrick Doyle
Dog Control Officer:
Suzie Tracy
Planning Board Chair:
Bob DeWitt
Agenda Item:
Site plan review for Paul Floreck property at 6434 Appletree Point Road on Skaneateles Lake
Subject of Review:
Addition of office/studio and bathroom on upper floor and expansion of ground floor living room
Previous Consideration:
Item tabled at September meeting
Document Author:
Lorie DeWitt-Antilla
Author Position:
Secretary, Niles Board of Appeals
Contact Phone:
315-497-0066
Highway Department Phone:
315-497-2606
Municipal Website:
www.townofnilesny.gov
Year:
2026
Region / City:
Monroe, Washington
Topic:
Backflow prevention and testing
Document Type:
Public notice / list
Organization:
City of Monroe
Author:
City of Monroe
Target Audience:
Water service customers
Regulation:
Washington State Department of Health backflow certification requirements
Purpose:
Listing certified backflow assembly testers for public reference
Year:
2021
Region / City:
East Garrett WSC
Topic:
Backflow Prevention Assembly Registration
Document Type:
Registration Form
Organization / Institution:
East Garrett WSC
Author:
SC Tracking Solutions LLC
Target Audience:
BPATs, Customer Service Inspectors, Irrigators, Plumbers, Fireline Contractors, Builders, Construction Firms
Effective Period:
July 26, 2021
Approval Date:
July 26, 2021
Year:
2023
Region / City:
North Dakota
Subject:
Water quality, environmental protection, backflow prevention
Document Type:
Guidance document
Author:
Jacob R. Schafer
Target Audience:
Water suppliers, environmental quality departments
Period of validity:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Country:
United States
State:
Ohio
City:
Ravenna
Subject:
Backflow prevention and cross-connection control
Document Type:
Public information notice
Issuing Authority:
City of Ravenna Public Water System
Regulatory Framework:
Ohio Administrative Code 3745-95; Ohio Plumbing Code Chapter 608
Responsible Authority:
Ohio Environmental Protection Agency
Obligations:
Installation and annual testing of backflow preventers by certified testers
Inspection Administration:
Backflow Solutions (BSI Online)
Target Audience:
Residential and commercial water customers
Year:
2023
Region / City:
Acushnet
Topic:
Water supply, cross connections, backflow prevention
Document Type:
Informational / Regulatory
Organization:
Acushnet Water Department
Author:
Acushnet Water Department
Target Audience:
Water system operators, property owners, industrial/commercial/institutional facility managers
Effective Period:
Ongoing
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2023
Region / City:
East Palo Alto, California
Subject:
Backflow Prevention and Cross-Connection Control
Document Type:
Ordinance
Agency / Organization:
City of East Palo Alto
Author:
East Palo Alto City Council
Target Audience:
Public, Residents of East Palo Alto, Contractors, Environmental Health Services
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
Legal document detailing the update to the city’s water system backflow prevention policies and procedures, aligned with state regulations and aimed at public health protection.
Year:
2023
Region / City:
Global
Topic:
Variable Frequency Drives
Document Type:
Technical Specification
Author:
Not specified
Target Audience:
Engineers, Technical Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Standards:
UL 508C, CSA 22.2 No. 274-2017, UL 1995, CE mark 2006/42/EC, IEC 60529, EN 61800-3, IEEE C62.41
Quality Assurance:
In-circuit testing, computerized testing, MTBF 28 years
Description:
Technical specification document describing the mechanical and operational features of the HV600 Variable Frequency Drive (VFD) for industrial applications, with detailed information on performance, construction, standards, and protection mechanisms.
Year:
2025
Region / City:
Arkansas
Subject:
Commercial Permits
Document Type:
Checklist
Issuing Organization:
Bentonville City Planning Department
Target Audience:
Contractors, Architects, and Engineers
Effective Period:
September 2025
Approval Date:
September 2025
Amendment Date:
N/A
Note:
Year
Region / City:
Burlington
Document Type:
Application Form
Topic:
Site Plan Review and Development
Governing Ordinance:
Burlington Unified Development Ordinance
Pre-application Conference Required:
Yes
Special Districts Mentioned:
LHO District, FHO Districts
Infrastructure Requirements:
Public and private utilities
Amendments and Variances:
Applicable if modifying previous approvals
Submission Materials:
Paper and digital copies required
Phased Development:
Possible
Sustainability Incentives:
Optional
Owners’ Association:
Possible
Year:
2020
Region / City:
Clark County, Boulder City
Subject:
Engineering, Construction, Water Systems, Wastewater, Utilities
Document Type:
Guidelines, Standards
Organization / Institution:
Southern Nevada Health District, Regional Transportation Commission of Southern Nevada, Boulder City
Author:
Nevada Blue Book, Clark County
Target Audience:
Engineers, Architects, Developers
Effective Period:
2020
Approval Date:
2020
Amendment Date:
Not specified
Note:
Year
Region / City:
Huntsville, TX
Subject:
Fire Sprinkler Plan Submission
Document Type:
Checklist
Organization / Institution:
City of Huntsville
Target Audience:
Contractors, Engineers, Fire Protection Professionals
Note:
Year
Region / City:
City of Durham
Subject:
Stormwater management
Document Type:
Form
Institution / Organization:
City of Durham, Department of Public Works
Author:
City of Durham, Stormwater Services Division
Target Audience:
Property owners, inspection companies, and stormwater maintenance certifiers
Period of Validity:
Annual
Document type:
Project submittal form
Program:
Reserve
Protocol:
Soil Enrichment Protocol
Protocol version:
V1.1
Project type:
Soil enrichment project
Submitting party:
Project Owner
Form format:
Interactive Word form converted to PDF upon submission
Submission status:
Becomes public upon approval
Project scope:
Agricultural land management
Geographic scope:
United States
Subject areas:
Soil management, greenhouse gas accounting, environmental compliance
Related processes:
Project registration, eligibility assessment, monitoring and reporting
Intended use:
Submission of project information for program review
Regulatory context:
Federal, state, and local environmental regulations
Source type:
Administrative and regulatory program documentation
Year:
2023
Region / city:
Los Alamos
Subject:
Construction Submittal
Document Type:
Submittal Transmittal Form
Agency/Institution:
LANL
Author:
Constructor
Target Audience:
LANL Submittal Reviewers, External Design Agencies
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2024
Organization:
Los Alamos National Laboratory (LANL)
Document Type:
Master Specification Section
Topic:
Construction Submittal Procedures
Revision:
7
Attachments:
01 3300 Attachment A – Construction Submittal Log
Scope:
ML-4 projects (guidance for ML-1 to ML-4)
Related Sections:
01 4000, 01 7700, 01 7823, 01 7839, 01 8113.13
Definitions Included:
Yes, including A/E, BIM, Constructor, Delegated Design, EDRMS, EOR, ESM, FDAR, FSR, IPT, RCD, RE, SME, STR, Submittal, TSM
Year:
2018
Region / City:
NOVA District (Fairfax/Arlington)
Theme:
Land Use Permits, Site Plan Permits
Document Type:
Guidelines
Organization:
Virginia Department of Transportation (VDOT)
Author:
Not specified
Target Audience:
Developers, Property Owners, Contractors
Period of Validity:
Not specified
Approval Date:
January 2018
Date of Amendments:
Not specified
Year:
Not specified
Region / City:
Not specified
Topic:
Bidder qualifications, pre-award requirements
Document Type:
Instructional document
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Bidders, contractors
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified